Railroad Undercutter Attachment on SK170RR Excavator

Поділитися
Вставка
  • Опубліковано 5 вер 2024
  • Supertrak's SK170RR excavator with railroad undercutter attachment. maintenance

КОМЕНТАРІ • 7

  • @halfwayfarmsandoutdoors3550
    @halfwayfarmsandoutdoors3550 3 роки тому +2

    Just like the coal cutters used underground years ago.

  • @johnhauser4589
    @johnhauser4589 3 роки тому +1

    Always reminds me of the guy sawing off the branch he's sitting on. Why this section of track isn't fully removed, thoroughly excavated and replaced with proper fill escapes me.

    • @keithjurena9319
      @keithjurena9319 Рік тому

      Ballast stone wears, losing the sharp edges which interlock. This wear along with track dirt impedes water drainage, casing tie rot, mud pumping and soft track.
      This is quicker than removing rails, regrading and replacement, especially on CWR track without joint bars.

  • @kdwaynec
    @kdwaynec Рік тому +2

    Why?

    • @keithjurena9319
      @keithjurena9319 Рік тому

      Replace worn ballast, dirty ballast or to do a base inspection of ties.

  • @josejaime1971
    @josejaime1971 2 роки тому

    Cuántos metros hace por día este equipo?

  • @pierremathonnet9591
    @pierremathonnet9591 11 місяців тому

    Cette machine n'a aucun interret si elle n'est pas intégrée a un train complet d'échange des traverses...