Create S-Curve for Planned Target vs Actual Work from MS Project

Поділитися
Вставка
  • Опубліковано 22 січ 2025

КОМЕНТАРІ • 66

  • @DeepakKumar-gt6tg
    @DeepakKumar-gt6tg 10 місяців тому

    very informative and helped in creating S curve. Thanks for in depth explanation!

  • @leumntv9741
    @leumntv9741 Рік тому

    Wow! So love this channel. Thank you very much for sharing this tutorial

  • @Alex-z25b
    @Alex-z25b 14 днів тому

    Thank you for this. In my case the graph and table are balck, any help?

  • @shaikaarifilahi8423
    @shaikaarifilahi8423 Рік тому +4

    thanks for the information, but while I am generating the s curve report (baseline cumulative work VS Cumulative actual work), I am getting values 0 in the pivot table. unable to generate the s curve. would you pls help me with that?

    • @jongski18
      @jongski18 Рік тому

      You should do resource loading to your schedule to be able to generate values.

    • @nisarkhan2619
      @nisarkhan2619 Рік тому

      same problem i am facing and don’t know how to do resource loading in existing project file

  • @ba177ba18
    @ba177ba18 8 місяців тому

    Clear and straight to the point. Thank you. Liked and subbed

  • @dcpowered
    @dcpowered 2 роки тому

    This is perfect! Just what i was looking for! Great explanations!

  • @ammadkhan5380
    @ammadkhan5380 11 місяців тому +2

    I'm having 0 for all fields (actual work, cumulative work) in graph report, I have set baseline. Need help

  • @danishaiman5952
    @danishaiman5952 Рік тому +1

    hi,urgent may i ask why my baseline cumulative is all 0 ? but mu actual cumulative has the value

    • @ExcelInsights
      @ExcelInsights  Рік тому +2

      Did u declare baseline?

    • @lynnettekm1661
      @lynnettekm1661 Рік тому +1

      @@ExcelInsights I am having the same issue...My values are all 0...The Chart is completely empty with no histogram

    • @pepenator79
      @pepenator79 Рік тому

      Same thing happens in my case@@lynnettekm1661

    • @hargovindbhatt8284
      @hargovindbhatt8284 Рік тому

      @Excellnsights i have same issue to show all 0 in the data set and no histogram has shown..

    • @adedigbaafeezadedayo2324
      @adedigbaafeezadedayo2324 Рік тому

      I'm having similar problem. .it keeps bringing 0

  • @raj7553
    @raj7553 7 днів тому

    Hello Tom... As a planner we are creating a S curve for progress report based on the cumulative work but we track the update through % complete which is duration based. Is that the right way to do?

    • @ExcelInsights
      @ExcelInsights  7 днів тому

      An S-curve is usually for tracking accumulation of resources.
      Unless what you are planning is to visualize the accumulation of days worked-- your plan may work. Otherwise, it seems like what you wre creating is a line chart that shows progress of % complete-- not accumulation.

  • @MrShahzaib7
    @MrShahzaib7 Місяць тому

    Can you tell me where this data is being taken from? I did exactly what you said but baseline commutative and commutative work both won't show anything at all. My box is empty and is not showing bar chart as yours.

    • @ExcelInsights
      @ExcelInsights  Місяць тому

      This happened to me before. From what I read, the OLAP is corrupted.
      The solution I found working was to copy the project data from the Gantt chart view and paste that on a new file.

    • @MrShahzaib7
      @MrShahzaib7 Місяць тому

      @@ExcelInsights is it because of the resources? because i am not assigning resources as i have to only track % of the project and not the man hours or machine hours.

    • @ExcelInsights
      @ExcelInsights  Місяць тому

      Yes, the assignment of resources is part of the things you need to do exactly.

    • @MrShahzaib7
      @MrShahzaib7 Місяць тому

      Hi there again. I have a problem which I think you can help me with. I have prepared a project schedule around 374 activities with start and end dates, now I want to show in an overview sheet which are the upcoming tasks for the coming week and late tasks also. Can you tell me how to do that? Is there any video which shows that? I am trying to highlight them but I am trying to show them in an overview dashboard. Please help.

  • @syafeeqahsofi5326
    @syafeeqahsofi5326 6 місяців тому

    Hi sir, from available fields from visual reports, i dont have baseline cumulative work and cumulative work to add to selected fields.. what to do sir..?

  • @narscalixto9029
    @narscalixto9029 Рік тому

    Hello, do you have the same for Primavera P6?

  • @nurdiyana2945
    @nurdiyana2945 6 місяців тому

    do i need to complete all the actual start and finish date to generate the report? because i have set the baseline but the date are not complete yet as the project is ongoing, when i generate the report all the cummulative value in excel is 0

    • @ExcelInsights
      @ExcelInsights  6 місяців тому

      Hi, here's a video if the project is still ongoing: ua-cam.com/video/4XjJ8lbAw14/v-deo.htmlsi=lfH7AV4-EVHUFWfR

  • @giacomov83
    @giacomov83 Рік тому

    Thanks a lot. Could you please clarify how to show different bars for baseline and actual/planned?

    • @ExcelInsights
      @ExcelInsights  Рік тому

      Hi, do you mean you want to show the chart as a bar/column chart instead of a line chart?
      Because if yes, then that is not an S-Curve anymore. Did I understand your question correctly?

    • @giacomov83
      @giacomov83 Рік тому

      @@ExcelInsights sorry..I was meaning the view in tracking Gantt with bar charts of planned Vs baseline..that is how normally tracking Gantt displays the Gantt chart! Solved!

  • @christang9406
    @christang9406 11 місяців тому

    Thanks sir, i managed to create the curve as instructed. I forgot to make the work baseline in the beginning. and the tick options..
    Thank you!

  • @ruigamito
    @ruigamito 2 роки тому

    Hi! Many thanks for the video. Is it posible to do this curve for a daily calendar?

    • @ExcelInsights
      @ExcelInsights  2 роки тому

      Yes, you just need to continue collapsing the Excel data to daily. However, daily curves tend to be not as smooth looking as weekly curves.

  • @TomTaebterces
    @TomTaebterces Місяць тому

    how can I show day instead of week

  • @amirulh166
    @amirulh166 Рік тому

    What represent number for baseline and actual cumulative work? what does the work
    number mean?

    • @ExcelInsights
      @ExcelInsights  Рік тому

      This is auto calculated based on the dates (both the initial and actual) you enter in the Gantt chart.

  • @abimazran7351
    @abimazran7351 Рік тому

    how to show weightage in MIP??

  • @lapparellasignature9975
    @lapparellasignature9975 Місяць тому

    God bless you man.

  • @shyam1027
    @shyam1027 Рік тому

    This is truly outstanding and precise explanation! . Is it possible to assess or forecast the future rate of work by S-curve?

    • @ExcelInsights
      @ExcelInsights  Рік тому

      Excel can do this by means of regression analysis. However, it requires that your dates are evenly separated.

  • @pmodepartment
    @pmodepartment Рік тому

    Sir, how can it change the value from work hours to percentage value based on % complete column in gantt chart ?

    • @ExcelInsights
      @ExcelInsights  Рік тому

      During the export part, look for the % column you are looking for

  • @filipefigueiredo85
    @filipefigueiredo85 Рік тому

    That's a great tutorial. Is possible to build the same chart but considering only Material Resource type?

  • @muhammadzulhilmanmazlan9450
    @muhammadzulhilmanmazlan9450 4 місяці тому

    why the value is zero for both baseline and actual? is it because I didn't enter the resources? please help

    • @ExcelInsights
      @ExcelInsights  4 місяці тому

      Try declaring as Baseline1. Then, use Baseline1 Cumulative in the report

  • @oootoob
    @oootoob Рік тому +1

    This can be done directly in Project using reports. But how can you show work completed as a percentage rather than hours?

    • @davidt.akin9096
      @davidt.akin9096 11 місяців тому

      You can do this using cumulative percentage complete

  • @OrleansMakuza
    @OrleansMakuza Рік тому

    Great Tutorial - Thanks!

  • @warrenjames5658
    @warrenjames5658 Рік тому

    Hi Excel Insights. Thank you for the awesome video. Can you kindly compile a video on EVM analysis. Computing EV, PV and AC. Thank you

    • @ExcelInsights
      @ExcelInsights  Рік тому

      Hi,
      There is a templated report in MS Project that already does this.

  • @muhammadamirin5088
    @muhammadamirin5088 7 місяців тому

    Why my filter dont have monthly to drag like vdeo

  • @MuhammadZubair-jl4nn
    @MuhammadZubair-jl4nn Рік тому

    Sir, Thanks for guidance. please prepare one more video to guide us that how we can create "critical task report" in progress tab.

  • @parthachakraborty48
    @parthachakraborty48 7 місяців тому

    Wonderful explanation

  • @imamhandoyo3930
    @imamhandoyo3930 7 місяців тому

    Thank you ...helpful a lot

  • @kornvisanuthongrat5656
    @kornvisanuthongrat5656 2 роки тому

    Thank you for shared the good thing!! But i have some issue, In visual report field picker, it doesn't show Baseline Cumulative Work and also no Cumulative Actual Work. Please feedback me how to make it appear. hope you can help __/\__ (I'm use MSP version 2010 )

    • @ExcelInsights
      @ExcelInsights  2 роки тому +1

      This was a problem with Project 2010 (and actually other programs too had many problems during the launch of 2010 versions that Microsoft released what we call "Service Pack 1" that fixed many issues in the 2010 versions.) I cannot find the link to it anymore.
      Maybe you can be lucky and find the "Service Pack 1" update or get the more recent versions of MS Project.

    • @kornvisanuthongrat5656
      @kornvisanuthongrat5656 2 роки тому

      @@ExcelInsights Thank you for your reply sir, I will try to get the update version. ^^

  • @redstoneengineeringandcons3301

    Hi Excel Insights, how to extract the manpower histogram? Kindly share the link kung may video na kayo regarding dito. Salamat

    • @ExcelInsights
      @ExcelInsights  Рік тому

      Do you mean histogram per week Yung buckets?

  • @chanont6042
    @chanont6042 Рік тому

    Thx sir good job

  • @DfFg-qh5ub
    @DfFg-qh5ub 10 місяців тому

    Weekly calender is field

  • @junegalsim
    @junegalsim 7 місяців тому

    Pagawa sana ako ng scurve