My fat was HIP 5 years ago. But the toilet bowls are worse than my previous original HDB provided " American standard" toilet bowl which had good flush and was easy to clean. Good for elderly maintenance.
I've never been fond of the toilet bowl or its flushing system since it was installed. Quite disappointing!🤭😕
Ya my house also undergoing Home Improvement Programme too (HIP)!
Wow, scary right.... those dust, now into our week 2 after HIP, still feeling it everywhere 🤣😮💨
Thanks for the video. Can I find out how long after polling did you get the letter that HIP would start in one month?
Great Saturday morning, my dear. It was about 2 or 3 weeks plus the polling. Remember to cover up as many layers if you wish to dust lesser.
thank you for this video..
Thank you for watching! Hope this helps, still a nightmare till now, cleaning up, at least 1 week plus, to feel least dust. Please help to share our video😉
@@jesgbc it definitely does.. my parents block is nearby you.. 884.. they having their HIP next year
@@ja_brut the more, must remind them regards the portable toilet. 1st day of hacking work, move them away at least for the day. I kept quite a few pcs of carton boxes to lay on ground after day 1, easier to walk. Make sure get the contractors to mop or clean up before end of day.
Thanks for sharing, its so helpful. My block polling end of Sep. I notice you have a mobile toilet installed. Is it stinky? Can shower in there?
Hi hi, as long we don't do big all is well. Yup, we shower in it, but I still prefer to head down as I felt too squeezy. Anyway, they will tape it up in the morning, untapped in the evening. Please must remind them for it as they forgot ours on day 1 and caused my 1st night in the nightmare.. tell them you have kids and / or senior in the house, so the Mobile toilet very important.
@@jesgbcThks for replying. Ummm... Downstairs toilet clean enough? So many residents using. Frankly, quite nervous about the toileting issue. What is tape and untapped?
Hello @jesgbc, I'm staying at a place that's currently rented with few other tenants, the landlord doesn't stay in it. Our blk HIP is estimated to start in about 4-6 months.
I understand for most people when HIP starts , they do it with their family members. Do you have any advice for me on how to handle this whole HIP process smoothly with my landlord and other tenants?
Would appreciate your help. Thanks :)
Thanks for sharing. Previously, my neighbour 's rental unit proceed as normal, just ensuring the landlord/house has the door opened for contractors by 7am, locked up valuables if entrusting no one home (for me I do not heehee) I will still advise if yourself and sharing partner not with master room to tape up your room door (gaps) to prevent dust to enter so you could still sleep in by night. If those having the masterbroom upgrading toilet will be challenging. My ex neighbour just had their helper to head in morning to open door, returning after 7pm to lock up. Another of their tenant actually rental hotel to stay. 11 days very fast, just the dust n dirt the most scary challenge. If you need plastic sheet can get from me as I have some left but unsure if the adhesive still good. I kiasu bought many rolls, but did not do a good cover job (1st timer) so regretted a bit.if need to share or exchange more advise if you do not mind leave your contact and it will be easier. Here, text no ending de. 😅🤣 TGIF
Did the workers try to upsell you their extra tiling and painting service? :D
Yes they did... infact every unit they will ask. 1 of my neighbour ended up needed to get lunch boxes for them, used his own pails, etc. Another neighbour, needed to pay extra for some tasks they promised to help him at 1st.
@@jesgbc just got done with day 9, the peek hole of the new door is off center, like way off, the wash basin is slanted towards the user, paid one of their electrician $50 to change 2 switches and a light, and one of the switch box is slanted. broke one of my room lights. And I bought them lunch everyday
@stevencsk79, that was sweet of you, we only got them packet drink daily and some biscuits on the first 3 days. To be honest, the company assigned to our area was still fine. True, all findings surfaced on day 9. Until todate, we still dislike the toilet bowl, the flushing system, the toilet doors, the metal gate, and the main door. ☹️🥴
Hi! Thanks for sharing this video! My block is the last one in the same area works starting soon 😅 can I know if the water taps below the shower head and below the sink were provided by them?
Where you brought the drop sheets from
Shopee. Please be reminded to lay cupboard on the floor, sure no regrets. Are you staying in Tampines, I have some left you can take from me and try.
Since its an apartment can the individual house members start using their toilets and rooms after 10days of work in their house or should wait for every flat and individual house in the apartment to be completed
Hi 👋, hopefully, i got your query right. We are good to use the toilet upon our (individual) completion. Did I answer it right? 😁
The offer toilet door not good. De-rail easily...Hope they have other better type.🙏
Ours has been almost 2 years, and we ended up choosing the wrong color for the tiles-they’re so ugly and stained now. We still hate the toilet bowl, seat, and flushing system. And now, the toilet door is starting to creak and make cracking sounds.☹️😞
For the mobile toilet , how often they clear the waste? 😅
Hi hi... please do not do big business, not reccomended. Every morning 1st thing they will seal up the toilet, unsealed in the evening. The pipe with our deposit be it gold or water imagine it will be running in the pipe left there, 1st 2 days still ok, slowly you will get the wonderful aroma filling up your kitchen. Just bath, and use for water deposit ok. 😁🤣. REMEMBER TO REMIND THEM on the day they come in the verify all details before the job started. I forgot to check as I thought by default they will send. Ended, my 1st night was stress without toilet for my night pee and I refused to head down.... dare to share... I resolved mu urgently into my dustin😅😜🤭
Can i ask after covering how do I get water from the kitchen sink 😅since both my toilet under toilet upgrade also and kitchen will be too dusty to collect the water from there, we want drink coffee
Wahaha, that was a good question, I had hard time at first. Improvised further with overlapping sheets and taped up. 😆😅
Lmao I might as while bring my whole bag and clothes and soap and camp in the rest area and shower and peepee and poopoo downstairs cause upstairs too dusty and noisy.
Advise Closed up 1 bedroom, sealed another sheets outside, you definitely need a room ZZZ
How was the dust and cleaning up thereafter?
Hi Jean, clean up took awhile, will still feel the dust. If you are covering up, make sure we do overlapping, my overlapped work was bad, hence, a little more dust to clean. Only 1 week later, I felt better. But, the work inside toilet till date I am feeling very very disappointed. So make sure when they do water testing, please ensure it flows well.
How much do you need to pay for whole HIP?
Hello James! Thank you for watching our video. If we recall correctly, the cost ranges from a few hundred, typically between 600 to 900 SGD (through CPF), depending on the package chosen. For PR, the price is significantly higher. Cheers!
Where did you all sleep?
Hi Wendy, i sent my daughter out to her friend 's place, my hubby, myself, and our little furry monster squeezed in my daughter's room. As the first few days they will be here early, better have someone home. 😉
Must everyone do toilet?
Not mandatory, it's your choice. My sister-in-law only does her main door. However, if there are any toilet leaks or issues in the future, it might be difficult to get assistance from the usual sources.
How you all want to sleep and rest 😂so dusty until so many days. Actually HIP should give you all stay at free hotel until they finished renovate the toilets.
Hey, we originally planned to stay in a hotel, but since we had our dog with us, we ended up covering one of the common rooms with plastic sheets and made it work for about 11 nights. The nightmare is finally over!😮💨🫣🤭
thanks for sharing. my area going to do HIP. doing some research, headache 😅
Yeah, scary. Summarised: ensured you have/purchased all your stuffs needed to be installed, check thoroughly after handover (this month counting down to our 1st Year, lots of unsatisfactory still but nothing we could do, 1 year warranty almost up) Tiles tried getting the darker col, I felt the light col, I get to see dirt/stains easily. Wrapped up carefully and more layers, especially your wardrobes/cupboards. Wahaha, if you prefer to stay around, prepare a table and chairs at the stairway corridor (lol) as I was working from home, so I was glad 😊 😃 I had that idea, plus I had a dog. Lastly, if you are not wasting money to stay away, cover up 1 bedroom with more layers of sheets, so at least you have a less dusty place to sleep 😴 🙂.
Gooda luck..
Oh, 1 more, try laying more cupboards or get those large plastic sheet to protect the flooring from extreme dust. I used cupboards only if I thought of the large sheet earlier maybe i save lots of time vaccumand mopping. The cleaning after took us 2 weeks 😅 for not feeling the dust. No joke!
@@jesgbc
oh my.
thanks for sharing these detailed information, I will take some time to digest, HIP starting soon in my area, dang!