Test Operation for newly install VRV IV | Daikin Singapore
Вставка
- Опубліковано 21 жов 2024
- How to conduct a test operation for newly install VRV IV SYSTEM.
Connect with Daikin Singapore on
Website: www.daikin.com.sg
Facebook: / daikinsg
Instagram: / daikinsg
LinkedIn: / daikinsg
#DaikinSG #DaikinSingapore #PerfectingTheAir #DaikinTutorial
Whats the difference between check operation as shown in video and test operation mode 2-88? can someone help on this matter
Airfel mobile air conditioner only works on the fan after 15/20 minutes of operation. LE makes it flash on the screen.
The video's not right. The Daikin VRV IV has 2 types of tests the long and the short. From the factory is activated the long. If someone runs the long one directly without having indicated how much freon has put in addition, (m2-14) it will take back the alarm code U3-02. In fact the long test only needs the first boot of the unit to collect data to use it for automatic leakage control. The long test take about 4 hours.
dreamlordgr sir how to put outdoor on short test mode
Why is test operation done? What is ther actual purpose of test operation?
Cool
Sir pls upload vrv x commissioning procedure
১ টা গুরুপে ৮ ইনডোর,, এর থেকে ১ টা ইনডোর বাদ দিতে গেলে,,, আউটডোর নরমল হচ্চে না,,,,এর জদি কোন উত্তর থাকে তা হলে,, পিলিজ একটা ভিডিও দিয়েন
Good video
please toshiba CRC operations settings, video send,me 9206671419
Cool