£500 Million HS2 Washwood Heath Depot & Bromford Tunnel

Поділитися
Вставка
  • Опубліковано 1 лют 2025

КОМЕНТАРІ • 15

  • @robertwalsh1724
    @robertwalsh1724 5 годин тому +1

    Thanks!

    • @VitaminSteTv
      @VitaminSteTv  5 годин тому

      @robertwalsh1724 You're welcome, Rob! Thanks for the first 'Super' on the channel! 🎉🥳👌🏻👏🏻🤝

  • @piotrmaifeld5180
    @piotrmaifeld5180 11 годин тому +3

    i've been waiting to see it for ages! thanks mate!

    • @VitaminSteTv
      @VitaminSteTv  11 годин тому +1

      @@piotrmaifeld5180 You're welcome! 🤝🏻

  • @Michael-61-n3l
    @Michael-61-n3l 16 годин тому +7

    The start of construction work for the hs2 Maintenance complex has been pushed back into 2025 _ 3 contractors bid on the contract _ Vinci/Keltbray & VolkerFitzpatrick and Gulernak _ since then Gulermak have withdrawn from the tender process leaving the other 2 _ the Maintenance depot runs parallel to the Bromford tunnel portal _ it's still just that large flat area _ the building you see being built is part of the other use for the site _ warehouse & logistics _ some good views of the Bromford tunnel portal & retained cut leading up to Aston Church Rd _ looking forward to seeing the next chapter 👍

    • @VitaminSteTv
      @VitaminSteTv  15 годин тому +2

      @@Michael-61-n3l Thanks for this brilliant input! 🫡

  • @RitaFarrow
    @RitaFarrow 7 годин тому +1

    when do they expect the tbm to arrive ,also what is the length of the tunnel being bored. enjoying ur videos

    • @VitaminSteTv
      @VitaminSteTv  6 годин тому +1

      @RitaFarrow Hi Rita, thanks for watching! Regarding the length, it's 3.5 miles between Water Orton and Bromford. Maryanne is the first TBM that will break through later this year, and Elizabeth will follow afterwards. Exciting times ahead

  • @AlOh-2
    @AlOh-2 2 години тому

    The slope at the end will be dug out so it’s flat 😉

  • @Marcus-ut3hj
    @Marcus-ut3hj 16 годин тому +1

    Does anyone know what they are building in all that massive open space next to the tunnel?

    • @VitaminSteTv
      @VitaminSteTv  16 годин тому +5

      @Marcus-ut3hj If you look on the thumbnail graphic top right, it looks like the main building of the washwood heath depot will be there.

  • @NBates1601
    @NBates1601 43 хвилини тому

    Even if the HS2 travels at the same speed as Eurotunnel that’s 243kmh or 125mph

  • @hashim631
    @hashim631 4 години тому +1

    225mph are the top speeds mate.