so if i have 2 basements what shoudl be my bottom most story level? In video it is given as base but with 2 basements should I go with plinth level? or the level at which my 1st slabstarts i.e basement 1?
1 diaphram to all shells??! i use for similiar shells a diaphram And about sesimic i define in x and y direction so i choose x+ecc,y+ecc and it doesn't run earth quakes This diaphram for shell only if i have a floor don't contain slab so i assign to it a joint diaphram is that wrong ?!
These webinars are really helpful.
thanks for delivering a wonderful webinar, it's helpful to new learner of etabs.
Thank you very much for these webinar series.
so if i have 2 basements what shoudl be my bottom most story level? In video it is given as base but with 2 basements should I go with plinth level? or the level at which my 1st slabstarts i.e basement 1?
1 diaphram to all shells??! i use for similiar shells a diaphram
And about sesimic i define in x and y direction so i choose x+ecc,y+ecc and it doesn't run earth quakes
This diaphram for shell only if i have a floor don't contain slab so i assign to it a joint diaphram is that wrong ?!
Hello, can we have a copy of the files(pdf) presented in this webinar and also the first webinar? Thanks
Question, why is UBC 97 code not in ETABS v18?
is ti steel structure ?
WHY WE CHECK THE PARTICIPATION MASSES RATIO
Very Good
Thank you