GSBP | Neepawa Best Western Walk Through

Поділитися
Вставка
  • Опубліковано 27 вер 2024
  • The second-floor walls of the Neepawa Best Western are officially up! The Excel-7 and Plett Construction team installed 435 linear feet of ICE Panels in 3 days thanks to the streamlined construction process offered by the ICE Panels. ICE Panels combine the framing, vapour barrier, and insulation steps into one process.