Sir, For Low rise buildings (other buildings with infill brick) is it mandatory to provide approximate fundamental time period as per code? Because it is always comes less than 0.55 for those types of building, it comes out uneconomical design.
1.If we r following code then we must have to provide as per code. 2. Or we can go for inelastic analysis to chalange code. 3. How r u deciding ur design is uneconomical.
Excel file link
docs.google.com/spreadsheets/d/14AsNONi7zV3-LfC6S1uDKETJVpGZBG17/edit?usp=drive_link&ouid=111198683779667650320&rtpof=true&sd=true
Very Informative. Thank You Sir🙂
Thank for ur support.
great work sir🎉
Thanks a lot 😊
Thank you for sharing this valuable information. I really like it.
So nice of you
Sir, For Low rise buildings (other buildings with infill brick) is it mandatory to provide approximate fundamental time period as per code? Because it is always comes less than 0.55 for those types of building, it comes out uneconomical design.
1.If we r following code then we must have to provide as per code.
2. Or we can go for inelastic analysis to chalange code.
3. How r u deciding ur design is uneconomical.