Just need 1000 little people to sit on those benches, laying the drive ways and waiting on platforms for the trains... - Great behind the scenes video - Good luck for next week
Another great video Thanks! I was wondering if the team had considered putting the baseboards into a wheeled racks and using an Aluminium Van ramp? Regards Steve
@@Colt-bd2mv I thought that after the NEC issues they needed to do it to recover the situation. They seem to have an inadequate setup period and too few members available to avoid problems.
@@sja45ukit’s a community group. They all do it for free and have jobs. They have enough members, it’s just they do a huge amount of building. And there is nowhere they could ever realistically build & test a 200+ foot layout. And for this event they aren’t taking the whole 200+ feet so they don’t need to rent out space to test it. They can do it at Chester.
@@Colt-bd2mv I know, but it is just more pressure than they need to put together a novel combination of old and new boards at the cathedral without having pre-assembled it !!
Great video, God bless Phil to me the unsung hero. Nothing bothers him, Dave is pretty awesome too😁
Great video Dave All hands to the pumps now Not long to go good luck with the move and setting it up. See you on Thusdsy.
Just need 1000 little people to sit on those benches, laying the drive ways and waiting on platforms for the trains... - Great behind the scenes video - Good luck for next week
Another great video Thanks! I was wondering if the team had considered putting the baseboards into a wheeled racks and using an Aluminium Van ramp? Regards Steve
If some modules are work in progress, nobody is going to mind.
Good video will good see it Chester thanks for the share on channel thanks lee
I’d be happy to come and help! Do whatever you want then go home.
Just say the word!!!
What happened to the plan to set up the entire layout in a large space to find out the critical issues ??
That was for the NEC.
@@Colt-bd2mv I thought that after the NEC issues they needed to do it to recover the situation. They seem to have an inadequate setup period and too few members available to avoid problems.
@@sja45ukit’s a community group. They all do it for free and have jobs. They have enough members, it’s just they do a huge amount of building. And there is nowhere they could ever realistically build & test a 200+ foot layout.
And for this event they aren’t taking the whole 200+ feet so they don’t need to rent out space to test it. They can do it at Chester.
@@Colt-bd2mv I know, but it is just more pressure than they need to put together a novel combination of old and new boards at the cathedral without having pre-assembled it !!
@@sja45uk they’d have to transport it and assemble it twice then. Which would be even more trouble.
If you need a hand to move stuff please ask I'm only in wrexham