It's very convenient for the passengers who travelled from Guntakal Junction to Tumkur if there is a connection between Dharmavaram and Kalyanadurgm.People from Tumkur can travel easily to Tirupati also.
Koratageri samepa Goravanahlli Mahalakshmi temple all India premis temple Karnataka state Tumkur district koratageri taluk tourist place Goravanahlli Bangalore samepa Jay Amma
4:06 The pace of work in Karnataka is too slow, with not a kilometer of new track added. The earthen embankments in AP (with bridges & culverts constructed and in place) just stop at the border, waiting to be linked on the other side, as can be seen in maps in Internet. Lot of effort is needed to "acquire" land and handover to the Railways. A passenger train runs from "Kadiri devarapalli" (AP), just before Doddahalli, now to Tirupati (via Rayadurgam-Guntakal) - I was told. If Madakasira (between Pavagada & Madhugiri) is linked via Pavagada, this remotest town in AP will have railway connectivity with the rest of state & mainly with Amaravati, the new AP capital. We pray that the work be completed soon so that both the states be benefited. At least that (land acquisition by Karnataka governemnt) will - it is hoped - speed up the construction & commissioning of the railway line. The hinterland around Ballary, by readily connecting to Tumakur & Bengaluru, will progress fast.
Part 2: 0:22 Leaving Madakasira/AP, the alignment stops at Pattikunta-Jadrahalli, to enter Karanataka at Beddattur/74 km(about 7 km away) of which photos were posted by Vinayaka Itagi (this August) showing a lot of pvc-pipes, tins & boxes(explosives may be for Railways use) under a temporary shelter (may be explosives for railway use) & a tunnel being bored (Raju Sharma this February ) may be for track-laying,. From Tumakuru side, Urukere/10.3 km to Koratagere/29.5 km, as you have shown 19 km is impossible. It may be more. After Urukere & Annenahalli Jn. (station is built and no track with alignment to two branches - one to Davanagere & this one). Alignment is seen till Masanipalya. From Masanipalya on, no alignment seen. Land acquisition is needed. Alignment (I hope) needs to be final first, as terrain is very hilly, that needs no land acquisition (who has land on hills?). Following Suvarnamukhi & Jayamangala river alignments till Sankapura (about 12 km from Madhugiri hill station), turning North - via Nirekallu to Bedathur (60 km from Masanipalya) from AP border (where alignment is seen). Railways may be facing Engineering problem being a very tough terrain - unlike, from Masanipalya & before Madakasira. Yet, like in the case of Doddahalli station, track can be laid till Madakasira connecting Pavagada (Tumakur district) and the present run of trains can be extended from Doddahalli to Madakasira, to enable "rails" & other material to be transported too, from Bellary.
I will give each and every new railway line update wait for sometime I will update hubballi ankola and Hubli talguppa taluguppa honnavar these new Railway lines
Most important railway line for Bellary peoples🎉❤
Yes for sure 😊
ಕಾಮಗಾರಿಯ ಬಗೆಗಿನ ಸಂಪೂರ್ಣವಾದ ಮಾಹಿತಿಯನ್ನು ನೀಡಿದ್ದಕ್ಕೆ ತುಂಬಾ ತುಂಬಾ ಧನ್ಯವಾದಗಳು ಆದಷ್ಟು ಬೇಗ ಪೂರ್ಣಗೊಳ್ಳಲಿ 👍🏻👍🏻
ಧನ್ಯವಾದಗಳು 😊
ಈ ಜನ್ಮದಲ್ಲಿ ಈ ಕಾಮಗಾರಿ ಮುಗಿಯುವುದಿಲ್ಲ 💯💯😂😂😂
😅😅
VERY GOOD INFORMATION NICE 👍👌👌👌 CLARITY POINT TO POINT FULL INFORMATION VERY VERY GOOD.
It's very convenient for the passengers who travelled from Guntakal Junction to Tumkur if there is a connection between Dharmavaram and Kalyanadurgm.People from Tumkur can travel easily to Tirupati also.
ಉಡುಪಿ ಎಂಪಿ ಕೆಲಸ ಮಾಡ್ತಾರೆ
Very nice information video and good explanation ❤
Thank you
Most important new railway line project Davangere, Chitradurga and Tumkur train update please.
Watch it👇🏻👇🏻
ua-cam.com/video/gimBjcAA0y8/v-deo.html
ಹುಬ್ಬಳ್ಳಿ ಅಂಕೋಲಾ, railway line bagge vedio madi
Definitely 😊👍🏻
Please explain the present stage of Gadag Wadi project and reasons for delay🙏
Sure
This project will help for localites as well as for long distance travel.
Thank you great information bro ❤❤
Welcome 😊
Sir pls do recent video on tumkur- davangere railway route..
Great work bro.
ಕಾರವಾರ ಎಂಪಿ ಏನು ಕೆಲಸ ಮಾಡಲ್ಲ ಕಾರವಾರ ಕೆ ಒಂದು ಟ್ರೈನ್ ತರೋದಿಲ್ಲ
Very good
Give update on hassan chikkmagaluru line & when it will complete
And update on hassan - chikkbanavara doubling
👍🏻👍🏻
Sir tumkur ninda koratagere railway line yavaga complete agutte
Please give update on gadag wadi new railway line when kushtagi railway station will open?
If get details definitely make a video
ವಿಜಯಪುರ ಶಹಭಾದ್ ರೈಲು ಮಾರ್ಗದ ಬಗ್ಗೆ ವಿಡಿಯೋ ಮಾಡಿ
ಖಂಡಿತ
Koratageri samepa Goravanahlli Mahalakshmi temple all India premis temple Karnataka state Tumkur district koratageri taluk tourist place Goravanahlli Bangalore samepa Jay Amma
Tumkur Koratagere ❤
CM siddramaiha must give correct money for farmers . land even modhi also sir.
Bro when starts railway project of almatti to yadgir via muddebihal. Please give details
Will give update in separate video
ಬಳ್ಳಾರಿ ಲಿಂಗಸೂಗುರ್ ರೈಲ್ವೆ ಲೈನ್ ಬಗ್ಗೆ ಮಾಹಿತಿ ಇದ್ದರೆ ತಿಳಿಸಿ
Land acquisition is biggest issue 😢
Yes😞
ನೈಸ್ ವಿಡಿಯೋ ಬ್ರೋ
Thank you 👍🏻😊
ಗದಗ ಜಿಲ್ಲೆಯ ರೈಲ್ವೇ ಯೋಜನೆ ಬಗ್ಗೆ ಮಾಹಿತಿ ನೀಡಿ
Watch it 👇🏻👇🏻
ua-cam.com/video/-VEZYaC-m74/v-deo.html
ನಾವು ಸಾಯೋದರ ಒಳಗೆ ನೋಡಬಹುದೇ
Bro almatti to yadgir via muddebihal railway station make a video
Give a update on Mysore - thalassery new railway line
Okay sure👍🏻 we will give every new railway line updates
Give update on nanjangud- nilambur New railway line
Dubble line please
Please give Update shivamogga-Sirisi-mangaluru Railway project
Sure in upcoming videos we will make 👍🏻
Kanasu kaanta iru
4:06 The pace of work in Karnataka is too slow, with not a kilometer of new track added. The earthen embankments in AP (with bridges & culverts constructed and in place) just stop at the border, waiting to be linked on the other side, as can be seen in maps in Internet. Lot of effort is needed to "acquire" land and handover to the Railways. A passenger train runs from "Kadiri devarapalli" (AP), just before Doddahalli, now to Tirupati (via Rayadurgam-Guntakal) - I was told.
If Madakasira (between Pavagada & Madhugiri) is linked via Pavagada, this remotest town in AP will have railway connectivity with the rest of state & mainly with Amaravati, the new AP capital. We pray that the work be completed soon so that both the states be benefited.
At least that (land acquisition by Karnataka governemnt) will - it is hoped - speed up the construction & commissioning of the railway line. The hinterland around Ballary, by readily connecting to Tumakur & Bengaluru, will progress fast.
Part 2:
0:22 Leaving Madakasira/AP, the alignment stops at Pattikunta-Jadrahalli, to enter Karanataka at Beddattur/74 km(about 7 km away) of which photos were posted by Vinayaka Itagi (this August) showing a lot of pvc-pipes, tins & boxes(explosives may be for Railways use) under a temporary shelter (may be explosives for railway use) & a tunnel being bored (Raju Sharma this February ) may be for track-laying,.
From Tumakuru side, Urukere/10.3 km to Koratagere/29.5 km, as you have shown 19 km is impossible. It may be more. After Urukere & Annenahalli Jn. (station is built and no track with alignment to two branches - one to Davanagere & this one). Alignment is seen till Masanipalya. From Masanipalya on, no alignment seen. Land acquisition is needed. Alignment (I hope) needs to be final first, as terrain is very hilly, that needs no land acquisition (who has land on hills?). Following Suvarnamukhi & Jayamangala river alignments till Sankapura (about 12 km from Madhugiri hill station), turning North - via Nirekallu to Bedathur (60 km from Masanipalya) from AP border (where alignment is seen). Railways may be facing Engineering problem being a very tough terrain - unlike, from Masanipalya & before Madakasira.
Yet, like in the case of Doddahalli station, track can be laid till Madakasira connecting Pavagada (Tumakur district) and the present run of trains can be extended from Doddahalli to Madakasira, to enable "rails" & other material to be transported too, from Bellary.
Bro hubli to thalguppa train route update
I will give each and every new railway line update wait for sometime I will update hubballi ankola and Hubli talguppa taluguppa honnavar these new Railway lines
Rayadurga not Raidurga
Thank you for the kind information
Tumkur district politician's ge yavde improvement mado asakti illa.. unfit
Kudal Sangam bro
I will explain in daroji gangavathi Bagalkot new Railway Line
2027. 🎉. Opening
No may be 2030
Hope for the best
Avoid train accident