🚋 Retired 1 year already! MTR Light Rail Route 751 to Tin Yat Full Journey on the Phase 2 vehicle

Поділитися
Вставка
  • Опубліковано 22 гру 2024

КОМЕНТАРІ • 10

  • @nich-ko6si
    @nich-ko6si 10 місяців тому +1

    The difference with the phase 5 vehicles are that, in a dire emergency, the trailer cars could be operated in service individually, whereas it would be extremely awkward for the phase 2 vehicles to do that.

    • @SFsRailDepot
      @SFsRailDepot  10 місяців тому

      Both Phase 2 and 5's trailer car can be operated individually if needed.

    • @nich-ko6si
      @nich-ko6si 10 місяців тому

      @@SFsRailDepot it’d look extremely awkward for the P2 trailer to be in service alone, but it wouldn’t look ridiculous for the P5 trailer to operate in service alone. P5 would even look like some Shanghai metro Line 10 where the cab was removed after delivery of train set!

  • @IlOveRaMEn-b6r
    @IlOveRaMEn-b6r 10 місяців тому

    想問呢個係幾時

    • @SFsRailDepot
      @SFsRailDepot  10 місяців тому +1

      上年1月

    • @IlOveRaMEn-b6r
      @IlOveRaMEn-b6r 10 місяців тому

      @@SFsRailDepot希望二周年可以出返嚟紀念一下😢

    • @SFsRailDepot
      @SFsRailDepot  10 місяців тому

      應該唔會,最多好似MLR咁揾個地方安置

    • @hihi-fc8qt
      @hihi-fc8qt 9 місяців тому

      @@IlOveRaMEn-b6r你可能要等二期車退役35周年有機會會出個仿真

  • @hippoho6366
    @hippoho6366 9 місяців тому

    冇可能係第二期輕鐵第二期輕鐵不是退役咗