ATS Automatic transfer switch wiring diagram

Поділитися
Вставка
  • Опубліковано 12 тра 2022
  • Automatic Transfer Switch Household isolated converter, Dual Power Automatic Transfer Switch
    When the normal power ( Grid or utility ) Power supply is abnormal, the backup (Generator ) power supply will work immediately to ensure the continuity of the power supply.
    MCB - Miniature Circuit Breaker
    RCCB - Residual Current Circuit Breaker
    DP MCB - Double Pole Miniature Circuit Breaker
    SP MCB - Single Pole Miniature Circuit Breaker
    ELCB - Earth-leakage circuit breaker
    🌍 Other videos link :-👇👇👇
    Single phase motor digital timer connection
    • Single phase motor dig...
    House wiring | wiring a house for electricity
    • House wiring | wiring ...
    Float switch wiring | contactor connection | water tank level controller
    • Float switch wiring | ...
    Complete house wiring with wire size selection | Bedroom wiring, Living room wiring, Low Cost Design
    • Complete house wiring ...
    Solar panel connection with home inverter & solar charge controller
    • solar system for home ...
    Cooler wiring connection
    • Cooler wiring connection
    Fridge wiring diagram
    • Fridge wiring diagram ...
    Free energy | Solar, Wind hybrid system | Renewable energy | Free electricity
    • Free energy | Solar, W...
    1 kw solar system with home load design
    • 1 kw solar system with...
    Cooler wiring connection | 3 speed motor connection
    • Cooler wiring connecti...
    Smart solar pump connection | pump controller | Submersible pump | VFD
    • Smart solar pump conne...
    🌍 Facebook Page: / letsmaketechnology
    || So keep loving, keep supporting , and don't forget to like, share, and Subscribe the channel. It's really motivated me to make videos ||
  • Наука та технологія

КОМЕНТАРІ • 13

  • @fabiocompagnone4056
    @fabiocompagnone4056 4 місяці тому

    Potresti fare un video per listallazione di un timer sull'ats, per ritardare la commutazione da fotovoltaico a rete

  • @allynyamkinda6591
    @allynyamkinda6591 Рік тому

    how will this start the generator automatic

  • @eugenericcihipona7165
    @eugenericcihipona7165 Рік тому +2

    You are missing a timer relay device. This circuit could end up wrong, instead of going automatic it will turn out to be a manual transfer. Additionally, power cant be harvested directly from a transmission grid tower. You will need a substation to lower down the voltage and a secondary distribution line equipped with stepdown transformer. In that manner only you can connect correctly to the grid.

    • @KingMoronProductions
      @KingMoronProductions Рік тому +2

      This diagram is accurate for this type of setup.
      "You are missing a timer relay device. This circuit could end up wrong, instead of going automatic it will turn out to be a manual transfer" - The ATS itself automatically switches between the primary and secondary inputs. If the primary is dead, it will switch to the secondary. If the primary is alive, it will switch back. Only if both inputs are dead, will it not function. No additional relays or timers are required.
      You are expected to arrange start-up of your generator/backup-supply yourself however, be it manually, or automatic. That is outside the scope of this diagram.
      "power cant be harvested directly from a transmission grid tower" - The electricity pylon is merely an icon to represent the power grid (as indicated by the label "Power Grid"), it is not meant to represent to where you should connect your wiring. It could as easily be an icon for a power station, it doesn't mean you're expected to run an extension cable to your closest nuclear power station. This is clear.

    • @ImranKhan-xn2sj
      @ImranKhan-xn2sj 7 місяців тому

      ua-cam.com/video/Cd0UunvdBa8/v-deo.htmlsi=a5jwi2cwnZ6p_LU0

  • @danielreid6823
    @danielreid6823 11 місяців тому +1

    You cannot interupt the MEN (Multiple Earth-Neutral) or PEN (Protective Earth-Neutral) conductors!

    • @ImranKhan-xn2sj
      @ImranKhan-xn2sj 7 місяців тому

      ua-cam.com/video/Cd0UunvdBa8/v-deo.htmlsi=a5jwi2cwnZ6p_LU0

  • @ganesh19
    @ganesh19 Рік тому

    আর ভাই কেমন আছেন, বলছিলাম এই সফটওয়্যারের নাম কি। আপনি মোবাইলে ব্যবহার করেন নাকি ল্যাপটপে?

    • @ImranKhan-xn2sj
      @ImranKhan-xn2sj 7 місяців тому

      ua-cam.com/video/Cd0UunvdBa8/v-deo.htmlsi=a5jwi2cwnZ6p_LU0

  • @sirright8340
    @sirright8340 Рік тому +2

    Where is the neutral and the ground connections? Go back to school

    • @KingMoronProductions
      @KingMoronProductions Рік тому

      The neutral is shown here clearly in black, and ground is also indicated in the diagram, though none of these devices require/support a ground connection, so none is shown.
      If you have an old style metal chassis breaker box, or different equipment/setup, it should be grounded as appropriate, but that is outside of the scope of this diagram.

    • @danielreid6823
      @danielreid6823 11 місяців тому

      ​@@KingMoronProductionsActually you're wrong! The neutral and earth/ground are extremely important, especially here. Google "Beware of switched main neutral conductors" from WorkSafe Australia. The MEN or PEN cannot be interrupted!

    • @ImranKhan-xn2sj
      @ImranKhan-xn2sj 7 місяців тому

      ua-cam.com/video/Cd0UunvdBa8/v-deo.htmlsi=a5jwi2cwnZ6p_LU0