Top 24 Highway Engineering Interview Question and Answers | Interview Preparation || By CivilGuruji

Поділитися
Вставка
  • Опубліковано 2 бер 2022
  • Top 24 Highway Engineering Interview Question and Answers | Interview Preparation
    Start Your COPs Training NOW
    Join this Training and get started:- civilguruji.page.link/F6m2mK1...
    For More Details Call Now : 9111001234
    About This Video ------------------------------------------------------------------------------
    In this video Er. Fazal ur Rahman, Corporate Trainer of Civil Guruji explaining about Top 24 Highway Engineering Interview Question and Answers | Interview Preparation
    Here’s a list of 24 must-know civil engineering interview questions and answers to ensure your next interview is a success.
    As the construction industry worldwide is growing very high, the demand for Civil Engineers and Construction Managers is also growing at the same speed.
    To build a career as a Civil Engineer, candidates need to crack the interview in which they are asked for various Civil Engineering interview questions.
    We have compiled a list of Common Interview Questions asked Civil Engineering interview questions and answers that an interviewer might ask you during your Civil Engineer job interview. Engineers are likely to be asked basic to advance level Civil Engineering interview questions depending on their experience and various other factors.
    Top 24 Highway Engineering Interview Question and Answers | Interview Preparation
    Top 24 Highway Engineering Interview Question and Answers | Interview Preparation
    :- What types of pavement is there?
    :- What is difference between Flexible Pavement & Rigid pavement?
    :- What is difference between OGL & NGL?
    :- Why dowel bar is being provided PQC pavement?
    :- What is land width of shoulder in plain & rolling terrain?
    :- when will Newly constructed pavement with ordinary Portland cement attains its working strength
    :- which walls are necessary on the hill side of roadway where earth has to be retained from slipping
    :- What is the vertical clearance of LVUP VUP & CUP?
    :- What is the Minimum Right of way that should be available (ROW) for 4 landing & 6 laning projects?
    :- What is the role of tie bar?
    :- What is the role of joint sealant?
    :- What is the minimum relative percentage compaction requirement for embankment and subgrade ?
    :- Tell the level tolerance in Subgrade (For flexible Pavement) ?
    :- What is the median width in raised condition in plain & Mountainous and Steep terrain?
    :- What is minimum bitumen content in DBM & BC for grade 1?
    :- For how many period flexible pavement design should be done?
    :- For how many period rigid pavement design should be done?
    :- How much minimum longitudinal slope is required for lined drains and unlined drains ?
    :- What is the output of excavator having 1 m3 bucket?
    :- what is Width of Carriage way or main road?
    :- Maximum design speed for different roads
    :- Why the mastic is being provided on deck slab ?
    :- What are grades of hume pipes use in higway construction
    Top 24 Highway Engineering Interview Question and Answers | Interview Preparation
    Follow our Official Social Media pages-
    You Can Also Download Our Mobile Application :-
    play.google.com/store/apps/de...
    Join Our Telegram Group
    t.me/JoinCivilGuruji
    Like Our Facebook Page :-
    / 411013642352412
    Follow us on Instagram
    civil_gurujii?i...
    And, Grow your Practical & Software skills.
    civil engineering interview questions and answers,civil engineer interview questions,interview questions and answers,job interview questions and answers,civil engineering interviews questions and answers,civil engineering interview questions and answers in india,interview questions,civil engineering interview questions,civil engineering interview,civil engineer interview,civil engineering,job interview
    Top 24 Highway Engineering Interview Question and Answers | Interview Preparation
    #Civil #Engineer #Highway #Engineering #Interview #Question #Answers #Interview #Preparation

КОМЕНТАРІ • 94

  • @ajayanahak5780
    @ajayanahak5780 Рік тому

    Meaine aapki bare main sunathaa mere ak dost se aaj pata chal gaya aapki padhai ke baare main isliy mein direct jai maa kalke like , and subscribe thok diya aapki chanel ko

  • @mdaftab4142
    @mdaftab4142 11 місяців тому +16

    Sub Base and Base Course should be in tolerance,
    Sub grade -+/- 20mm, GSB +/- 10mm (Flexible pavement),
    WMM +/- 10mm (paver),
    WMM +/-15mm(Manually)
    DBM +/- 6mm
    If BC thickness 40 mm then tolerance +/- 4 mm. If BC thickness 30 mm then tolerance +/-3mm.

  • @arpitkhandelwal4309
    @arpitkhandelwal4309 Рік тому +4

    best highway interview preparation.... thank u sir... helps lot

  • @abhisheksharmamaxgaming4932
    @abhisheksharmamaxgaming4932 2 роки тому +2

    Thank uuuu for help in future

  • @V.B.Pandey
    @V.B.Pandey Рік тому +20

    # flexible pavement made by crushed stone, gravel and soil with binding material bituminous material.
    # Rigid pavement made by concrete, mixture of course and fine aggregate, in rigid pavement Portland cement used as binding material.

  • @aadesh4497
    @aadesh4497 11 місяців тому +1

    thanks..guruji aapse bahut knowledge Mila hame...

    • @Civil_Guruji
      @Civil_Guruji  11 місяців тому

      Thank you for your comment!
      We appreciate your support. We strive to provide the best Knowledge for civil engineers,

  • @venkatasrinivas9521
    @venkatasrinivas9521 Рік тому

    Thanks Guruji

  • @nabeelattari1545
    @nabeelattari1545 Рік тому +4

    very informative kindly make a videos on Rate Analysis and productivity for road works as well...

    • @Civil_Guruji
      @Civil_Guruji  Рік тому

      Hello Surenabeel attari
      Humne apke request ko apne expert trainer ke sath share karenge aur bahut jald iss topic par hum video lnayenge.

  • @priyadipmanna4393
    @priyadipmanna4393 2 роки тому +4

    Very good session sir thanks you... waiting for surveying also...👍

  • @technicalwifiwithamit7725
    @technicalwifiwithamit7725 2 роки тому

    What a lecture.

  • @lalitsharma7984
    @lalitsharma7984 10 місяців тому

    Thankyou sir

  • @MithunKumar-fw3ju
    @MithunKumar-fw3ju Рік тому +1

    Bitumen concrete tollrenc (+-6mm)

  • @anuraggaur5793
    @anuraggaur5793 Рік тому

    Road Estimator Software pe video bana dijiye plzz

  • @vishaljaiswal1440
    @vishaljaiswal1440 2 роки тому +1

    Very knowledgeable video.

  • @ArunKumar-od7ql
    @ArunKumar-od7ql 4 місяці тому

    dowel bar longitudinal provides krte hai , tie bar ko traverse provide krte hai sir

  • @kamalvarma7172
    @kamalvarma7172 Рік тому +1

    Good

  • @user-oi2tb9wz9s
    @user-oi2tb9wz9s Рік тому +1

    Thank you so much sir

  • @anuraggaur5793
    @anuraggaur5793 Рік тому

    road estimator software pe video bana dijiye sir plzz

  • @gauravprajapat3187
    @gauravprajapat3187 2 роки тому +4

    Tollrence of BC +-5mm

  • @Cyamvlogs
    @Cyamvlogs 2 роки тому +15

    PQC =pavement quality concrete

  • @abcdefg8680
    @abcdefg8680 2 роки тому +5

    BC Tolerance +-6mm

  • @amishrakumarmishra3517
    @amishrakumarmishra3517 2 роки тому

    Super

  • @Pra132
    @Pra132 2 роки тому

    Sir One is big thing when I face interweave I forget all answers i do not know ,Sir ek purchase department ki vedeo daal do

  • @samiullhasami4077
    @samiullhasami4077 4 місяці тому +1

    Outstanding sir g

    • @Civil_Guruji
      @Civil_Guruji  3 місяці тому

      Thank you! Your support motivates us. 😊

  • @manishsinghchimney3006
    @manishsinghchimney3006 Рік тому +1

    Very nice video sir.

    • @Civil_Guruji
      @Civil_Guruji  Рік тому

      Thank you very much for your kind words. I appreciate your expression of support and goodwill. Let us continue to learn and share knowledge together.

  • @bhatsameer6848
    @bhatsameer6848 6 місяців тому +1

    Thanku

  • @kheye
    @kheye Рік тому +1

    Good work ❤

    • @Civil_Guruji
      @Civil_Guruji  Рік тому

      Thank you
      Kishor Neupane
      Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
      KEEP LEARING, KEEP SHARING.

  • @JIS786
    @JIS786 2 роки тому

    Sir experience is must where we get... Any way to get experience certificate..

  • @acty6067
    @acty6067 2 роки тому +6

    kindly make videos / course on IRRIGATION " SOLAR POWERED TUBE WELL SCHEMES", "LIFT IRRIGATION SCHEMES" Estimate preparing

  • @pitamberdutt421
    @pitamberdutt421 Рік тому +1

    Very nice friends

    • @Civil_Guruji
      @Civil_Guruji  Рік тому +1

      Hello Pitamber Dutt
      Hum Khush hai ki aap ko hamari mehnat pasand aai Civil guruji isi tarah Civil Engineers ko aaghe Badhate rahega. Aap bhi Iss Knowledge Ko Dusro Ko Share Kare.
      Keep Learning Keep Supporting.

  • @mannoolal4602
    @mannoolal4602 2 роки тому +2

    Sir,
    How many standard speed of sensor paver during during DBM and BC laying?

    • @seshadrireddy6130
      @seshadrireddy6130 Рік тому +1

      It all depends upon paving width and layer thickness

  • @qyamuddinqyamuddin3391
    @qyamuddinqyamuddin3391 2 роки тому +1

    Sir demo class nhi hota hai kya

  • @chetrammeena4677
    @chetrammeena4677 Рік тому +1

    Very nice

    • @Civil_Guruji
      @Civil_Guruji  Рік тому

      We appreciate your recognition of our hard work, Civil Guruji Isi tarah Civil Engineers Ke liye Content laate rahega.
      Keep Learning, Keep Supporting.

  • @vikramsehrawat1865
    @vikramsehrawat1865 2 роки тому +1

    Sir Highway ke Bill ke baare me ek video bnana details me. Niche ogl se lekar Gsb ya Wmm tak ka

  • @kushkumar3488
    @kushkumar3488 2 роки тому +1

    DBM and B C ka tollrence.=6 mm hota h

  • @padmalochan2169
    @padmalochan2169 Рік тому

    Sir my question 100 mt sub /Gsb bed me ketena water chahiye,

  • @bubaibhuinya1782
    @bubaibhuinya1782 Рік тому

    TRANSPORT DEPARTMENT GOVERNMENT OF India kunsa kunsa organization hai kiya hai uska power or uska responsibility kiya hai

  • @naharsingh6123
    @naharsingh6123 Рік тому

    Sir ji S S falth layer kya kon si hoti h sir ji please 🙏🙏

  • @krushnachparida6270
    @krushnachparida6270 Рік тому

    RE wall ka video batayae

  • @manjeesingh1044
    @manjeesingh1044 2 роки тому

    Sir Highway me Billing and Planning interview me

  • @indranilbor8862
    @indranilbor8862 Рік тому

    Sir two lane without raised kerbstone ki width -7. 0 m hoti hai.... Upne galat bataaya......

    • @Little_Explorer_Naqib
      @Little_Explorer_Naqib 10 місяців тому

      Kaha galat bataya with kerb 7.5 toh hota h.... Video thik se... Bahut mehnat karke video banata h ham log shukne ke liye.... Meh yeh video ek meine ki baat phir se dekhra ha hu kyon ki mere ko joh Civil Guruji ne shikhya sab yaat h yah kuch bulgaya h kya soch ke.... BWD tq so much @CivilGuruji❤❤❤

  • @hakeemabdul7885
    @hakeemabdul7885 14 днів тому

    Dowel bar length kithna hona chahiye

  • @sumantadas6719
    @sumantadas6719 2 роки тому

    freshers/experience?

  • @syedtechnical240
    @syedtechnical240 Рік тому

    Sir dbm bituminous content 4.5 % hota hai jaisa apne bataya ki 4 %.

    • @adayinmylife17
      @adayinmylife17 Рік тому +1

      Grade 1 ka 4% hota h and grade 2 ka 4.5% hota jismai layer thickness 50-75mm h

  • @girishaglawe7226
    @girishaglawe7226 2 роки тому

    BC Tollerence 3 To 5 +-

  • @d.m.allahabad8160
    @d.m.allahabad8160 Рік тому

    BC and DBM 6mm

  • @Rahulsingh-xl9pn
    @Rahulsingh-xl9pn 9 місяців тому

    BC tollrence-6mm

  • @dheerendrakumar3562
    @dheerendrakumar3562 Рік тому

    + - 6mm

  • @tanisha644
    @tanisha644 2 роки тому

    +/- 6mm

  • @amishrakumarmishra3517
    @amishrakumarmishra3517 2 роки тому

    Jai shree krishna

  • @srk4676
    @srk4676 2 роки тому

    Builder classes

  • @vsvhardik8408
    @vsvhardik8408 2 роки тому

    sir read and bridge construction ke lie koi online internship 2-3 months ke lie provide kar sakte he?

  • @funnypols
    @funnypols Рік тому

    +-5mm

  • @user-wd2uw2nk7b
    @user-wd2uw2nk7b 2 місяці тому

    +-6

  • @srk4676
    @srk4676 2 роки тому

    Builder business idaeas

  • @minu713165
    @minu713165 Рік тому

    Pt roller

  • @abhaykantsingh4066
    @abhaykantsingh4066 3 місяці тому +1

    BC Tolerance is....5mm.

  • @lakhveersingh844
    @lakhveersingh844 2 роки тому

    Bc tollrance 5mm 10 mmm

  • @Technicalwork4448
    @Technicalwork4448 11 місяців тому

    Bc -+ 6

  • @PraveenKumar-rm1qf
    @PraveenKumar-rm1qf 2 роки тому

    Kyo baat nahi long chaiya muja

  • @moongogoi2225
    @moongogoi2225 Рік тому +1

    Aek he bat kitna bar bata ta he

  • @rajukumargoswami2888
    @rajukumargoswami2888 10 місяців тому

    Bc +- 6 mm

  • @krushnachparida6270
    @krushnachparida6270 9 місяців тому

    30yers

  • @nikkukumar1723
    @nikkukumar1723 Рік тому

    Bc me tolrence +- 5mm

  • @Paramveer111194
    @Paramveer111194 2 роки тому

    Vehicular ko sahi se pronounce karo

  • @auzakhter7201
    @auzakhter7201 2 роки тому +6

    (1). The initial cost of flexible pavement is low, While The initial cost of rigid pavement is high.
    (2). Flexible pavement are inferior to concrete roads and are less durable, While Rigid pavement are superior and can take any traffic load and have longer life.
    (3). Construction joint are not required in flexible pavement. While construction joint are required in rigid pavement.
    (4). The maintenance cost of flexible pavement is high. While The maintenance cost of rigid pavement is low.

  • @sushilpandey8708
    @sushilpandey8708 2 роки тому

    Pp pp p0

  • @yogeshraut9339
    @yogeshraut9339 3 місяці тому +1

    vevical 🤣

  • @Mayank-gc5lr
    @Mayank-gc5lr Рік тому

    Sab galat sikhata h

  • @bittuhighwayengineer3216
    @bittuhighwayengineer3216 11 місяців тому

    BC Tollerance +/- 6 mm

  • @asmatullah6264
    @asmatullah6264 21 день тому

    +-6mm