How to Dramatically Shorten Your Project Schedule with Small Batches and Zones

Поділитися
Вставка
  • Опубліковано 9 січ 2025

КОМЕНТАРІ • 10

  • @davidt.akin9096
    @davidt.akin9096 Місяць тому

    Thanks Tom, always insightful.

  • @rib5536
    @rib5536 Місяць тому

    Appreciate your analysis sir.I have done both 1 & 2 scenarios .
    1st one was when depths of hard starta was at 2.8m and footing was for @18. Floor.
    In which back filling and plinth beam concrete drag timeline.
    2nd one was in Urbana area where material stacking and risks of thief was high but back filling and stud , column and plinth beam was smooth executed.

  • @bvausch1
    @bvausch1 Місяць тому

    very useful.

  • @youme9523
    @youme9523 Місяць тому

    Great to see you. Very helpful.

  • @Willc413
    @Willc413 Місяць тому +1

    Learned more off UA-cam channel in 1 week then 4 years in school