Thank you for the presentation and slide by slide update. Just sharing a suggestion and feedback for future presentations: keep the slides on the screen for the time duration taken to read from the first line to the last line in each slide. Right now we have to pause every few seconds to read the full information on each slide. Don't worry about the video length. Let the content on each slide be on full screen (remove pictures on the slide). Use alphabetical style (Abc xyz) instead of all caps (ABC XYZ) to improve readability and reduce visual strain for sentences. If you must use pictures/images, insert them between the slide transitions. For example: Words →Picture → Words → Picture → Words. Reduce special effects on the word slides. You can use more special effects and transition effects on the pictures and video portions. Keep up the good work!
Isi line me LTT k pas metro station banna tha but baad me usko cancel kar diya gaya. Ye LTT aane aur jaane k liye bahot sahi hota but ab aisa nhi ho raha hai.
@@techy.farooqui As per the tender, the proposed FOBs to all 3 locations will only be under 300mts from where the Kurla Metro Station is being built. Do not know if they are going ahead with it but.
Thank you for the presentation and slide by slide update.
Just sharing a suggestion and feedback for future presentations: keep the slides on the screen for the time duration taken to read from the first line to the last line in each slide.
Right now we have to pause every few seconds to read the full information on each slide. Don't worry about the video length. Let the content on each slide be on full screen (remove pictures on the slide). Use alphabetical style (Abc xyz) instead of all caps (ABC XYZ) to improve readability and reduce visual strain for sentences.
If you must use pictures/images, insert them between the slide transitions. For example: Words →Picture → Words → Picture → Words.
Reduce special effects on the word slides. You can use more special effects and transition effects on the pictures and video portions.
Keep up the good work!
Thanks for suggestion, appreciate it 👍
bhai nehru nagar station banne wala hai... toh station kaa kaam kyu nhi chalu kiya..
Any news from mandale to vashi
It’s in the plan but work is not starting any time soon. As soon as the news comes of the progress I will update it on my channel. 🙏
⭐️⭐️⭐️⭐️⭐️⭐️
Nice👍
Thanks
Mere ghar ke saamne ban Raha hai , shopper stop mcd ke udar, chembur mai,kya station sakar theatre je udar banega ,aisa log bol rahe the.
Wahan filhal station cancel kar diya gaya hai
@@Inframan26 💔fir kaha hoga station uske jagah
Any update on National College Station??
No news yet🙏
Isi line me LTT k pas metro station banna tha but baad me usko cancel kar diya gaya.
Ye LTT aane aur jaane k liye bahot sahi hota but ab aisa nhi ho raha hai.
I agree 👍
There could be a FOB from Kurla Metro station connecting LTT, Tilak Nagar and Kurla Central Railway station. This is being considered by MMRDA
@@ojayadev Not feasible. The distance between these 3 locations is very far from each other.
@@techy.farooqui As per the tender, the proposed FOBs to all 3 locations will only be under 300mts from where the Kurla Metro Station is being built. Do not know if they are going ahead with it but.
@@ojayadev I don't think so. The distance between Kurla West Metro Station and LTT is far.
Drone lelo