Hello sir! Did I understand this video correctly that Depending on the trait values, relationship description settings and variant table settings, the right performance values are pulled into the master recipe? For example, if I want to produce 3 meters of something, it will take me 10min, and if I want to produce 5 meters of something, it will take me 20min, and all this can be done in one BOM and one routing?
It is not possible to create Super Routing without a work center. (The definition of routing is the sequence of operations which includes the work centers where the operations are carried out). If we could get your business needs, it may be elaborated.
I am confused by this video. If a 300 class has already been assigned to all components, why is a 200 class being assigned to the components again? I don't understand. Please share a document if you have one. Thanks
If you are applying 300 class then no need to go for 200 class in normal scenario. Because you will be applying OD to BOM and Routing, but if there is some complex scenarios and one component has multiple products to make it easier one class with relevant character can be defined with 200 class type and can be assigned to BOM as 300 class type is not the proper class type to be assigned to BOM. Here he has taken both type as an example.
Hello Sir, This is Jaydeep Patil Can you please confirm while creating all components required for finish goods, which material type need to use KMAT / ROH ?
Thank you so much ( Romba Nandri ). I have refreshed my PP knowledge with your all videos. God bless you with good health. Thanks again.
Excellent. Cristal clear. Thank you
You are very welcome
Crystal clear explanation sir. Thank you very much.
Really much appreciated from Malabo, Equatorial Guinea
Good explained thanks ...
please explain various dependecy which use in VC.
I will do later.
Hello sir! Did I understand this video correctly that Depending on the trait values, relationship description settings and variant table settings, the right performance values are pulled into the master recipe? For example, if I want to produce 3 meters of something, it will take me 10min, and if I want to produce 5 meters of something, it will take me 20min, and all this can be done in one BOM and one routing?
Good explanation Sir...👏
Hi Sir, Your lecture is very informative... will you please provide pdf of your session
Sorry, I don't share the pdf.
Is it last video or more videos will come ?
It is last in this play list. A new playlist started combining PP/MM in which practical demonstrations are performed and more topics will be covered.
Can we create a Super routing without any work center assigned ?
It is not possible to create Super Routing without a work center. (The definition of routing is the sequence of operations which includes the work centers where the operations are carried out). If we could get your business needs, it may be elaborated.
I am confused by this video. If a 300 class has already been assigned to all components, why is a 200 class being assigned to the components again? I don't understand. Please share a document if you have one. Thanks
If you are applying 300 class then no need to go for 200 class in normal scenario. Because you will be applying OD to BOM and Routing, but if there is some complex scenarios and one component has multiple products to make it easier one class with relevant character can be defined with 200 class type and can be assigned to BOM as 300 class type is not the proper class type to be assigned to BOM. Here he has taken both type as an example.
Thank you for explaining on my behalf.
Hello Sir, This is Jaydeep Patil
Can you please confirm while creating all components required for finish goods, which material type need to use KMAT / ROH ?
Components may be any type.
@@SAPnSCM Thank You Sir
please give me notes sir SAP PP module
Hi, sorry. No specific notes were prepared and shared with anyone. It is a common platform to share knowledge.
Voice is low