What is MIVAN Formwork ? l Features l Advantages & Disadvantages

Поділитися
Вставка
  • Опубліковано 29 жов 2023
  • About This Video Content,
    In this video, Er. Narendra Patle explained about MIVAN technology / Formwork
    1. What is MIVAN Shuttering?
    - It was developed by MIVAN Company Ltd. from Malaysia in the 1990s for constructing mass housing projects in developing countries.
    - MIVAN Company Ltd. began manufacturing these formworks, hence giving the name “MIVAN Technology”
    - The system of aluminium forms (MIVAN) has been used widely in the construction of residential units and mass housing projects.
    - It is fast, simple, adaptable and cost - effective. (we can achieve minimum 6-7 days slab cycle)
    - This system is most suitable for Indian condition as a tailor-made aluminium formwork for cast-in-situ fully concrete structure.
    2. Features of MIVAN technology
    1. Sheet thickness and size of panel
    Aluminium Grade - Extrusion Section A6061 T6
    The concrete wall panel is 5mm thick.
    2000*600, 2000*300, 1200*300, 850*300 are the standard sizes of panels.
    Any other required size as per the requirement can be manufactured and delivered to the site.
    Panels reusable upto 200 - 250 times
    2. Load carrying capacity
    It has 7-8 tonnes per square meter capacity.
    Due to use of aluminium as a material, it is light in weight.
    It weight around 18-24 kg per square meter.
    3. Striking time (Deshuttering)
    Vertical formwork - 12 hours after concreting or when concrete attends a strength of 2 N/mm2
    Horizontal formwork - 36 hours after concreting or when concrete attends a strength of 10N/mm2
    4. Cycle Time
    High speed of construction can be achieved by this system that means faster completion of project (5 Days per floor)
    3. Advantages of MIVAN formwork
    - Uniformity in all components of structures.
    - There is no need of block work
    - Wall and slabs have smooth surface, which eliminates internal Plastering work
    - This technology makes the structures more seismic resistant and durable as well
    - Casting of all structural member is done at a single pour of concrete.
    Scrap value is high.
    - Can be erected using unskilled labours and without the removing of props, deck panel can be removed
    4. Disadvantages of MIVAN Formwork
    - Due to casting of all members, any modification is not possible to carry out.
    - Due to presence of shear wall, heat of hydration is high.
    - Initial cost is high ( Rs. 14000-16000 /Sqm )
    - Not suitable for small scale projects.
    - Wall and slab may show cracks due to shrinkage
    ===================================================================
    Download all Courses free ( BBS Excel Sheet / Drawing / Useful pdf )
    (Note: Videos and documents will get update daily, so stay tuned for more information )
    docs.google.com/spreadsheets/...
    Download file in pdf
    docs.google.com/spreadsheets/...
    Please Subscribe: / civilconstruct
    ===================================================================
    Visit our Channel for Civil Engineering Knowledge:
    / dndconstruction
    Visit our Channel for lifestyle & Fitness
    / @dineshlifestyle
    Follow us on INSTAGRAM: civil_const...
    Join us on Telegram: t.me/civil_construct
    Follow us on FACEBOOK: / 102249415176766
    ===================================================================
    what is mivan shuttering?
    mivan formwork mivan shuttering procedure
    mivan shuttering parts name
    mivan shuttering training
    mivan,aluminium formwork,mivan technology construction
    mivan technology,mivan construction technology in india,aluminium formwork construction,mivan shuttering components
    civil engineering basic knowledge,mivan shuttering in india
    aluminium shuttering,aluminium system formwork,mivan construction,mivan shuttering work,
    mfe mivan shuttering
    Aluform construction civil guruji
    DND Construction
    ===================================================================
    Disclaimer - This video is for educational purpose only. Copyright
    Disclaimer Under Section 107 of the Copyright Act 1976, allowance is
    made for "fair use" for purposes such as criticism, comment, news
    reporting, teaching, scholarship, and research. Fair use is a use
    permitted by copyright statute that might otherwise be infringing.
    Non-profit, educational or personal use tips the balance in favor of
    fair use .

КОМЕНТАРІ • 2

  • @majazdilkash
    @majazdilkash 8 місяців тому +1

    Can we have a detailed pdf of mivan shuttering components? It will be great for us

    • @CivilConstruct
      @CivilConstruct  8 місяців тому

      This is complete course
      I have created 30+ pdf/drawing/Excel sheets for Mivan shuttering
      Pls contact 9819528879 /7977655244