Hello,Thank you for your explanation and I have a problem-could you please show me how to set 2 Processes are series connections and circulate for 10 times and then comes to Dispose 1? Best wishes!
hi Maam, in my module using 8 trucks for three different loading sites, am using constant sequence in arrival module, how can i arrange or specify same trucks for one side i mean (1,2,3) for ist loading side and other as well throughout the shift time, or any other way to make it more convenient or close to reality.
Hello. Can you simulate the following condition in AREA? Truck A arrives during 24h and is attended by the resource at any time. Truck B only arrives during 08h to 16h and can only be attended by the resource within this time. Note: Both are served by the same resource. Can you help me? Thank you.
Hello,Thank you for your explanation and I have a problem-could you please show me how to set 2 Processes are series connections and circulate for 10 times and then comes to Dispose 1? Best wishes!
hi Maam, in my module using 8 trucks for three different loading sites, am using constant sequence in arrival module, how can i arrange or specify same trucks for one side i mean (1,2,3) for ist loading side and other as well throughout the shift time, or any other way to make it more convenient or close to reality.
Hello. Can you simulate the following condition in AREA?
Truck A arrives during 24h and is attended by the resource at any time.
Truck B only arrives during 08h to 16h and can only be attended by the resource within this time.
Note: Both are served by the same resource.
Can you help me? Thank you.