GHL ION Director Initial Setup *Updated*

Поділитися
Вставка
  • Опубліковано 4 гру 2024

КОМЕНТАРІ • 9

  • @georgesantana8341
    @georgesantana8341 3 роки тому

    Do you need a controller in addition to the Ion director and the dosing pump or can they stand alone?

    • @KR-id6bl
      @KR-id6bl  3 роки тому

      No the ION Director with a Doser can be run independent of the controller.

  • @barbcongl2588
    @barbcongl2588 2 роки тому

    I do not have the controller and ordered both the KH and ION director. One with the SA doser and the other with a slave doser. Will this work or should I have order both with an SA doser?

    • @KR-id6bl
      @KR-id6bl  2 роки тому +1

      Yes, as long as you have one SA(Stand Alone) and they are all on the latest firmware it should work

  • @hrvojevrh2743
    @hrvojevrh2743 2 роки тому

    Hello. What about tube length from dosing head 12 cm and dosing head to ion 16 cm as per manual?

    • @KR-id6bl
      @KR-id6bl  2 роки тому

      Are you asking does the tube length between the to units needs to be exact? When it comes to the unit being side by side or stack configuration you need to cut the dosing tube to the recommend length in inches or cm outline in the manual. But the water supply line and exit line length can be variable.

    • @hrvojevrh2743
      @hrvojevrh2743 2 роки тому

      @@KR-id6bl Hello. I was refering to length of hose of dosing head that is 12 cm and length of hose from head to ion must be included (16cm if stavked) and length of tube to sump plus filter 7ml. Or I am wrong?

    • @KR-id6bl
      @KR-id6bl  2 роки тому

      @@hrvojevrh2743 No you do not need to include the length between the unit in the final calculation. (sorry for the delayed response)

  • @orcatravels6581
    @orcatravels6581 3 роки тому

    Giggle for V
    P.