Thats a slow ass crew for 3 people. Its called a quick rig for a reason to be quick and efficient. Somebody close them damn doors why do they leave them open like that while rigging up. Operator pay attention to your weight indicator and steer that damn counter head. Sometimes old school aint always the best.
I hardly ever saw "quick" in my years in the oilfields. I saw some quick people, but unfortunately they were on drugs....bennies....which is prevalant in the patch.
sangat bermanfaat buat belajar sebagai pemula atau refreshing buat yang sdh berpengalaman
Where is he well head !? This is well ?
Como ouedo probar en superficie, si el cable 0.125" esta con vida util
Super!!!Спасибо!!!
good operation and good organize you have any slickline offer
Trac field measurements are very beautiful
Integrated workshop in any country these ???
Well done
Good job
Thats a slow ass crew for 3 people. Its called a quick rig for a reason to be quick and efficient. Somebody close them damn doors why do they leave them open like that while rigging up. Operator pay attention to your weight indicator and steer that damn counter head. Sometimes old school aint always the best.
I hardly ever saw "quick" in my years in the oilfields.
I saw some quick people, but unfortunately they were on drugs....bennies....which is prevalant in the patch.
Lol. Fun stuff
What's above the bop? The tool with the valve? I know the lubicators , not sure about the other tools.
It is TEE sub, it is useful on RIG operation to test the LUB and to kill the well in emergency. on production well it use as bleeder sub.
that's a pump tee
The pumping tee should be put under the bop really
good job but it's pure well dead here if there high pressure
esa unidad es muy insegura si se rompe el cable le corta la cabesa al operador
No it will not
Without a doubt the worst oil and gas job I've ever had