only down side of such a system is when there are a lot of these junctions back to back to back... u gotta do that short wait before the track activates then we gotta wait till the track is ready to travelled on then get off that junction only to end up at another junction... if only there was a way to automatically set all the junctions oriented correctly by just doing something at the start of the trip affecting every other junction down the path that leads to the destination this is interesting...
only down side of such a system is when there are a lot of these junctions back to back to back... u gotta do that short wait before the track activates then we gotta wait till the track is ready to travelled on then get off that junction only to end up at another junction...
if only there was a way to automatically set all the junctions oriented correctly by just doing something at the start of the trip affecting every other junction down the path that leads to the destination
this is interesting...
I could smash a junction and 180-reorientation into one. Requiring only two bearing than of five at every junction. Thank you for being up this issue!
I wonder what would happen if you were halfway on the thing when it turns
Derailment would occur
Make a working JCB excavator
maybe I will.