  • Momentary paralleling of transformers or sources are required for manual bus transfer.
    In industry at distribution level continuous paralleling is not used to avoid high value of fault current. If two or more no of sources are connected in parallel then it increases the fault level. Also if a certain amount of load is delivered through two transformers in parallel then if one transformer is get out of service the load delivery capacity reduces.
    Hence it is often practiced to consider 100% redundancy of source is considered. So if you want to change the load from one source to another without interrupting the load you will need momentary paralleling.
    #ElectricalTechnologyAndIndustrialPractice, #MomentaryParalleling, #Parallel_Operation_Of_Transformer,
    What is momentary paralleling of transformer
    Momentary paralleling
    sustained paralleling vs momentary paralleling
    why momentary paralleling is used
    manual bus transfer
    bus transfer without interruption
    momentary paralleling for bus transfer
    method of manual bus transfer
    Momentary paralleling of sources
    Momentary paralleling of incomers
    how momentary paralleling is implemented
    steps for momentary paralleling
    how sustained paralleling is avoided during momentary paralleling
    purpose of momentary paralleling
    Hope you have enjoyed this video. Please like, share, comment and subscribe..
    Thanks for watching the video.

КОМЕНТАРІ • 20

  • @dixitshetty3478
    @dixitshetty3478 4 роки тому

    Very Nice Video Sir, it was a refresher for me👍👍👍, very nicely explained

  • @keyurgajjar
    @keyurgajjar 4 роки тому

    Very well explained. Waiting for part 2

  • @thinkseeeatthroughvickus4555
    @thinkseeeatthroughvickus4555 4 роки тому +1

    Can you do a video on Most used relays and in what situation in is used?

  • @Nivupedia
    @Nivupedia 4 роки тому

    Very nice, can you make a video of various testings carried on transformer FAT and SAT before charging a new transformer. Transformer and substation maintenance throughout a year?

  • @shashankkumar7770
    @shashankkumar7770 4 роки тому +1

    At our site at source side we synchronised,than close breaker and open other breaker..but it is not used for power changeover of high load current..

  • @thinkseeeatthroughvickus4555
    @thinkseeeatthroughvickus4555 4 роки тому +1

    Waiting for Part-2.
    And how circuit starting will be managed during case-2 which is under voltage?
    Ie, during 27 activation, 86 give trip command to breaker at 2nd Trafo to Bus section-2.
    This time all outgoing feeders will shut down.
    Now when bus section-2 loads transferring to Bus Section-1, by closing Bus-Coupler, the loads in distribution side will be starting together, right? How to manage this starting to avoid large inrush current?

    • @electricaltechnologyandind5335
      @electricaltechnologyandind5335  4 роки тому +2

      Undervoltage relay is not fed to 86. So in automatic if incomer 2 under voltage relay has picked up, 86 has not operated, and bus coupler is open that means we can trip incomer 2 and close bus coupler. It is a simple but beautiful logic

    • @thinkseeeatthroughvickus4555
      @thinkseeeatthroughvickus4555 4 роки тому

      @@electricaltechnologyandind5335 Thanks for feedback, Appreciate if u can tell what all relay can fed to 86.
      And in the scenario where trip incomer 2 and close bus coupler, how can we manage startup of complete system in Bus section-2?
      Is this starting sequence you mean simple but beautiful logic?

    • @electricaltechnologyandind5335
      @electricaltechnologyandind5335  4 роки тому

      Motors breaker will be on. So when the source is changed the motor will keep running. And as the motors are not stall so they won't draw huge starting current.

    • @thinkseeeatthroughvickus4555
      @thinkseeeatthroughvickus4555 4 роки тому

      @@electricaltechnologyandind5335 can you please provide your contact number?

    • @sarveshlikhar5815
      @sarveshlikhar5815 3 роки тому

      Sir can you explain the process when there is a fault on one incomer and 86 relay operates. Then in this situation how to feed the loads on bus section 2 ?

  • @djturbine7565
    @djturbine7565 16 днів тому

    Is this relevant to the UK system?

  • @thinkseeeatthroughvickus4555
    @thinkseeeatthroughvickus4555 4 роки тому

    informative video. Can you do a zigzag grounding transformer sizing with an NER video.

  • @shehab1798
    @shehab1798 2 роки тому

    thank you

  • @thinkseeeatthroughvickus4555
    @thinkseeeatthroughvickus4555 4 роки тому

    Is the momentary Paralleling always done in manual mode?

  • @tulasidhrk854
    @tulasidhrk854 2 роки тому

    I think you missed the checksync while momentary parallel ing