Planning Department Demolition, Part 3

Поділитися
Вставка
  • Опубліковано 12 гру 2024

КОМЕНТАРІ • 24

  • @dimievers5573
    @dimievers5573 2 роки тому

    Now that's a demo site the way I like to see it . Active separation of materials. A sorted site . Makes working on it way easier and organized.

  • @joemcconnell2674
    @joemcconnell2674 3 роки тому +1

    Great job recording. This guy doing a great demolish.
    In my local city there is this shopping mall built in 1988. I remember the old building being demolished to make way for this shopping mall. But I can't even remember what the building looked like.

  • @dimievers5573
    @dimievers5573 2 роки тому

    Well maintained machines . Not a hint of chain squeel or sloppy joints . Very nice Berg

  • @constructionwatcher5381
    @constructionwatcher5381 3 роки тому +3

    That's an interesting tool they use to extend the reach of the excavator. No doubt a lot cheaper than getting in a high-reach rig. I thought I saw two different ones, on looking homemade. Those guys are very good with them.

    • @JohnZWetmore
      @JohnZWetmore  3 роки тому

      They also used it to reach the top level of this building.
      ua-cam.com/video/0DrpoSEMpjA/v-deo.html

    • @constructionwatcher5381
      @constructionwatcher5381 3 роки тому

      @@JohnZWetmore I saw it there, but you got some much better shots of it in this episode.

  • @pauloconnor2980
    @pauloconnor2980 3 роки тому +1

    Yet another great video. These guys are real pros!!!

  • @BradfordGuy
    @BradfordGuy 3 роки тому +1

    @ 1:18:40 Is that considered a strike? Sure looked like a full swing to me!

  • @firealarmdiscovery
    @firealarmdiscovery 2 роки тому +1

    Is that a fire alarm in the background? Just had to ask!

    • @JohnZWetmore
      @JohnZWetmore  2 роки тому

      There was a trash truck backing up at one point.

  • @dimievers5573
    @dimievers5573 2 роки тому

    I think they could have used a 3rd excavator. one can mostly do the teardown and stack the materials behind him so the other two can sort . There is a lot of time spend sorting here .it's a slow demo for that reason. Especially with the high amount of metals in this structure

  • @larrysorenson4789
    @larrysorenson4789 3 роки тому +1

    Those used brick sell for about $2 each at HD.

  • @Engineer9736
    @Engineer9736 3 роки тому +1

    Why did they need to demo it? It looked nice and there are a lot older buildings in the world which are still standing fine. Seems wasteful. But it's a fun demo otherwise 🙂 Great crash at 2:18 😁

    • @dimievers5573
      @dimievers5573 2 роки тому +1

      It's a government building. As soon as the cost of running it exceeds the benefit it gets brought down . You are right though . There is buildings more deserving of demo then this one . It could easily have been repurposed.

  • @johnfoltz8183
    @johnfoltz8183 3 роки тому +2

    I guess this is being replaced with yuppie sawdust and cardboard apartments set at high rents

  • @jimmydickson8854
    @jimmydickson8854 3 роки тому

    They really need an excavator with longer reach

  • @davidobrienirl
    @davidobrienirl 2 роки тому

    As a builder who uses demolition contractors all the time. This is the worst outfit I have seen. Inexperience!!

  • @sydsyd
    @sydsyd 3 роки тому +2

    Knock them all down!

  • @5885ronny
    @5885ronny 3 роки тому

    👍🤗👌😊

  • @davidroosa4561
    @davidroosa4561 3 роки тому +1

    i find this ironic

  • @melmo5218
    @melmo5218 3 роки тому

    Wish I had a proper job.