[Post-LUP Installation] Block 59 Strathmore Avenue - EM Services Elevators

Поділитися
Вставка
  • Опубліковано 10 лют 2025
  • Date of recording: 26 January 2025
    Time of recording: between 1230hrs to 1235hrs
    This is a film of these set of elevators that underwent its Lift Replacement Programme (LRP) back in 2022 at Block 59 Strathmore Avenue. EM Services was selected to replace 3 Fujitec Elevators in this block itself. Now in 2025, I have decided to revisit this block to film the 3 elevators post-LRP. Let's see how they are doing.
    Note that Lift A's announcement is already worn out for a ~2 years old lift, Lift B has a super loud fan ventilation system and Lift C had some delayed announcements when going up?
    If you want to see the lifts in their previous state before the replacement started, you can watch this video:
    • [Going to be gone soon...
    Also at the beginning of the video, I mistakely wrote Block 58 Strathmore Avenue instead of Block 59 Strathmore Avenue. Apologies for the oversight and minor typo.
    Technical Specifications (Lifts A, B & C)
    Brand: EM Services
    Persons/kg: 13 persons/885kg
    Floors served: 1-30
    History: LRP-ed, previously Fujitec
    ▶️ Subscribe to my other UA-cam channels!
    Main Channel (Trains): / @singaporetrainsmemories
    Shorts Channel (Trains): / @singaporetrainsmemori...
    Thank you for watching this video!
    I hope you enjoyed watching the long video. It took me a lot of effort to put this together!
    If you have any feedback, please leave them in the comments section below!
    The copyright on the video strictly belongs to the admin of SG Lifts Subsidiary. Reproduction / re-recording of the entire video wholesalely is NOT ALLOWED. If you want to use clips from the video, please reach out to me through the comments section.

КОМЕНТАРІ •