Accelerating Mix Designs for Base Material 0-7027

Поділитися
Вставка
  • Опубліковано 10 чер 2024
  • TTI researchers developed a rapid mix design method for cement-treated base (CTB that reduces the test turnaround time for strength results from 7 to 4 days, as well as reduces the material quantity required for the strength testing. Given this project’s scope and data, the accelerated mix design procedure for CTB is suitable for road-mixed or stockpiled base materials. Researchers recommend that the mechanistic check from this project be added to the Texas Flexible Pavement System. The full research report provides a framework for how this mechanistic check could be efficiently implemented.
    For more information on research project 0-7027, check out the TxDOT Research Library project record here:
    library.ctr.utexas.edu/Presto...
    For access to all TxDOT research, please visit the TxDOT Research Library at ctr.utexas.edu/library/

КОМЕНТАРІ •