Construction Littlie Island from start to finish

Поділитися
Вставка
  • Опубліковано 5 січ 2025
  • The 132 precast concrete pots were made possible by Arup by using a 3D Rebar Modeling system and robotically milled foam formwork. In five stages; first the piling, then precast elements were fabricated, followed by on-site erection, cast in place structural slab to tie it all together, and finally the finish work.
    Credit: Harry McFann