Construction Littlie Island from start to finish
Вставка
- Опубліковано 5 січ 2025
- The 132 precast concrete pots were made possible by Arup by using a 3D Rebar Modeling system and robotically milled foam formwork. In five stages; first the piling, then precast elements were fabricated, followed by on-site erection, cast in place structural slab to tie it all together, and finally the finish work.
Credit: Harry McFann