Це відео не доступне.
Перепрошуємо.
Old South Road Bridge dismantle at Seaford Rise Sth Australia
Вставка
- Опубліковано 6 бер 2024
- Produced with CyberLink PowerDirector
Main South Road Duplication Project between Seaford and Aldinga, is almost completed. on this footage you can see the early stages of the dismantaling of the old south road bridge at Seaford Rise South Australia.
It's hoped that the new cycling track will also be opened once the demolition of the bridge works is completed.
The Surf to Vines cycling track that takes you to Mclaren Vale and Willunga now leads riders under the new South road bridge. It is here that two murials have been painted on the walls as yo ride through. Well worth a look if your down this part of the world.
Music is The preparation by Zero-project
footage was taken with dji air2 s
The mural footage was also taken with the drone but hand held without props.
A white Pointer and Baramundi fish
Excellent little bit of history that will be appreciated in years to come. I didn't get to see it happening so thanks.
Thanks for watching. I could hear the noise from the jack hammers from home so set the drone up for a peep.cheers mate 🇦🇺🍷🦘
thats a real great drone capture mate nice mural there
*💯full view👀Au🦘👍like☑*
Cheers Billy for watching much appreciated cheers mate 🦘👍🇦🇺🍷
Nice video!
Cheers Nick 🦘👍🇦🇺🍷
Mural. I was thinking of Muriel’s Wedding lol
Well, that one way to embrace your topic. : )B
Thanks Ted cheers mate 👍
Lol...wasn't that an ongoing joke on Coronation Street?
Thanks Don for watching cheers mate 🍷👍🇦🇺🦘
Noice
Cheers mate
So what is the reason for spending big $$$ on removing a perfectly good bridge, I'm sure it could have been repurposed for something useful
I asked the same question. Thanks for watching cheers mate 👍🇦🇺🍷
@@OzbeachAndy Nice video & I see they went to the added expense & trouble of adding a foot bridge to the new bridge, must be fun spending tax payers money