Introducing the Proposed IBX

Поділитися
Вставка
  • Опубліковано 4 лют 2025

КОМЕНТАРІ • 802

  • @josefstalin9068
    @josefstalin9068 2 роки тому +1053

    Conventional rail is the way to go. Much more scalable capacity, the possibility to through run to the Bronx if an extension is built, and much lower infra costs are what makes it desirable. Honestly, light rail isn't the best, but still better than BRT, which just is the overall worst (lowest capacity, makes the least sense given it's a *rail* line already).

    • @bunjection
      @bunjection 2 роки тому +8

      i agree simulationnerd the guard manager of stepford county railway

    • @tompeled6193
      @tompeled6193 2 роки тому +26

      Why would I trust Stalin?

    • @Requiem2319
      @Requiem2319 2 роки тому +24

      based stalin as usual

    • @sygneg7348
      @sygneg7348 2 роки тому +12

      based and redpilled stalin

    • @oofyalDAMMIT
      @oofyalDAMMIT 2 роки тому +7

      that's interesting, considering this could be NYC's first option and chance to incorporate light rail

  • @MysticTransit
    @MysticTransit 2 роки тому +755

    I hope the Conventional Rail option is chosen. It's the best choice for reactivating the Bay Ridge Line. I love that this is going to be something similar to the London Overground, using Commuter-type stock, however, modified for higher capacity operations. I can't wait to see this service in operation, and I hope it doesn't take too long for this line to be completed.

    • @nw4538
      @nw4538 2 роки тому +25

      Yoooo mystic
      I agree, commuter rail would be the best

    • @jei1600
      @jei1600 2 роки тому +6

      Backed on the overground commuter rail

    • @jamallhayden2512
      @jamallhayden2512 2 роки тому +11

      It should use modified M8 railcars (New haven line E.M.Us). This way the service could interstate with Metro North and or Lirr, plus it opens up the possibility of extending to the Bronx in the future!

    • @ezrapotter4631
      @ezrapotter4631 2 роки тому +3

      Aye, good to see you. I agree with conventional rail, it would require less track construction.

    • @aqua2poweros699
      @aqua2poweros699 2 роки тому

      I agree, but Lightrail tbh does not sound like a bad idea overall. Its just more expensive.

  • @60Pagoda
    @60Pagoda 2 роки тому +429

    Whatever it turns into, it HAS to be part of a single swipe metro card system. Keep it IN network. And you have to get out ahead of the transit oriented development gentrification issue. Some of the neighborhoods you are going to be connecting to are traditionally car oriented and may be hostile to that change. Plan for tough conversations about how important projects like this are for the future of the city.

    • @CaseysTrains
      @CaseysTrains 2 роки тому +4

      I dont see why not if it's staying within NYC.

    • @davidsixtwo
      @davidsixtwo 2 роки тому +53

      Yes, fares and ticketing for MNR/LIRR/NJT are a hot mess compared to the subway. Keep it in the system with OMNY.

    • @JBS319
      @JBS319 2 роки тому +8

      MetroCard will be LONG gone by the time this is open

    • @DDELE7
      @DDELE7 2 роки тому +7

      The MTA should also rebuild several subway stations along the IBX route as part of the project like the Flatbush Ave terminus for the 2 and 5. It was NEVER designed to be a side platform terminal station.
      You could redesign the station with additional storage tracks and provisions for a long planned extension down Nostrand Ave to Sheepshead Bay or Marine Park as part of integrating the IBX with the subway. And Brooklyn College would gain a front door entrance to the expanded station.
      The same could be said for Avenue H on the Q line and many other stations that the IBX happens to miraculously pass by.

    • @JBS319
      @JBS319 2 роки тому +1

      @@DDELE7 given that this is supposed to be something that can be implemented much more quickly than your typical project, I believe there will at least initially be a number of well signposted out of system connections

  • @stegowolf
    @stegowolf 2 роки тому +491

    The LIRR-style cars with more doors is absolutely the way to go with this, Especially with future Bronx expansion in mind! Bus Rapid Transit idea IS REDICULOUS!! Rails are already there, upgrade and use them!! Its already designed FRA, Keep it that way!! And Bonus, Freight Can still be run on it too!! 3 track with center express/freight would be perfect!

    • @Cain-x
      @Cain-x 2 роки тому +26

      Exactly, buses will cost more in the long run. Trains are the way to go.

    • @jacoblopez6046
      @jacoblopez6046 2 роки тому +13

      Not to mention there's already an abandoned Hunts Point station that would just need to be renovated as well as an abandoned Whitlock Ave station that could also be renovated.

    • @aqua2poweros699
      @aqua2poweros699 2 роки тому +6

      REDICULOUS.

    • @JBS319
      @JBS319 2 роки тому +1

      @@jacoblopez6046 Hunts Point is part of Penn Station Access

    • @jacoblopez6046
      @jacoblopez6046 2 роки тому +1

      @@JBS319 I guess the MTA will never truly connect the BX to other boros.....

  • @JacobOhlssonBudinger
    @JacobOhlssonBudinger 2 роки тому +351

    I'm a Londoner and I'm begging you guys to learn from us. Use conventional rail. The IBX is so often compared to the London Overground which has been a huge success here for circumferential journeys. Its fast, comfortable, and relatively frequent at 5-10 minute all day headways. The best mode to achieve this in conventional rail. This will be a core line of the system as long as the MTA exists. For a city the size of New York, its core dedicated infrastructure HAS to be a step above Light Rail and especially BRT. Buses and low floor trams just can't compare to the capacity, speed, or comfort of conventional rail.

    • @amazing50000
      @amazing50000 2 роки тому +35

      This is what I love about the internet, and living in this time, because someone from London can give us advise here in New York with just a click of a button. I agree, as a person who grew up around this freight right-of-way in Brooklyn.

    • @yunleung2631
      @yunleung2631 2 роки тому

      I’m starting to think of moving to London.

    • @fordgary3000
      @fordgary3000 2 роки тому +1

      I WILL TRY IT ONCE THE PROHECTS ARE DONE.

    • @mattstbe6452
      @mattstbe6452 2 роки тому +1

      @@amazing50000 globalization

    • @tristanexists1806
      @tristanexists1806 2 роки тому +4

      Thanks for the tip Londoner us New Yorkers will forward that to the MTA let's hope they accept

  • @sideshowbob
    @sideshowbob 2 роки тому +97

    As a civil engineer, now retired, who worked on the CT part of the MTA (New Haven Line) for decades, I would also vouch for the "Commuter Rail" version, mainly due to interoperability with the rest of the LIRR system & potential to tie into the Hell Gate Bridge for single seat service to the Bronx. The vehicles would have to be designed to run on multiple systems (DC 3rd rail & overhead AC catenary), but the New Haven Line M8's already are capable of running on 4 different systems so that is entirely do-able.
    I originally thought it should be the same as existing NYC subway (ie "Heavy Rail Metro") but then realized this requires full separation from freight rail. Commuter Rail vehicles can operate with freight traffic on the same routes, a huge advantage for up front costs (no need to construct separated corridors).
    Light Rail is usually good but, besides the need for separate corridors from freight, I'd hesitate to introduce an entirely new mode of transit to a heavily unionized & compartmentalized agency. That will just generate a whole slew of duplicated staff who can only work on 1 system or the other. For example, light rail overhead catenary is totally different than the 3rd rail or even the heavy rail catenary on the New Haven Line / Hell Gate Bridge. Thus requiring an entirely separate staff with separate training. Likewise for vehicle maintenance - light rail vehicles are somewhere between trains & buses, very unique. I'm sure all the transit unions are absolutely Salivating over a light rail option.
    I won't even Dignify the busway option. Busways have their place, but not here. Use them in outer, less dense corridors.

  • @coolboss999
    @coolboss999 2 роки тому +308

    This should 100% be extended to the Bronx IF this ever gets approved and built by the city. It is an absolute necessity that it be extended to the Bronx. Conventional Rail would be the way to go for the IBX

    • @CaseysTrains
      @CaseysTrains 2 роки тому +17

      The ONLY problem about extending to The Bronx, especially if they stupidly go for Light Rail or BRT, is Amtrak's busy Northeast Corridor whose very nitpicky over what runs over the Hell Gate Bridge. Though with Penn Acess being built, and if they are smart enough to do conventional rail, they MIGHT have a shot of getting IBX to Co-Op City.

    • @davidrivera9743
      @davidrivera9743 2 роки тому +4

      Conventional rail means a new station to connect with the forthcoming east Bronx branch of the mnrr would have to be constructed somewhere around Northern Blvd and Broadway.

    • @aqua2poweros699
      @aqua2poweros699 2 роки тому +1

      @@CaseysTrains some idiots believe Penn Station Access will be very expensive and that I could agree on, but still. What do you prefer. Non-Frequent Buses that run slower than the Z, or expensive but quick rides to your work place?

    • @qolspony
      @qolspony 2 роки тому

      Metro North is being proposed to operate via hells gate bridge through co-op city. I don't necessarily know if this is better, but it at least give commuters westside access into Penn station. How they are going to fit all these services, I don't know.

    • @Nitty290
      @Nitty290 2 роки тому +1

      In the feasibility plan they said they wouldn’t be able to bc penn access metro north (future line being designed), amtrack, and freight services dont leave any time for ibx services on the hells gate bridge.

  • @busfannerchris
    @busfannerchris 2 роки тому +151

    Conventional Rail is only definite option incase of a possible future expansion to The Bronx and connections to other LIRR Branches. LRT & BRT gets rid of that possibility.
    Light Rail is still a good option but is really only needed if they ever plan to extend the line on city streets or extend to Laguardia Airport as one of the alternatives.
    Bus Rapid Transit shouldn't be considered since the tracks are already there and constructing roads & new viaduct is a waste of money. But if it's truly the most flexible and other bus routes can use it to speed up time, so be it.

    • @yuuycockdemnations69420
      @yuuycockdemnations69420 2 роки тому +7

      I absolutely agree with you on everything you said. Conventional rail has the most amount of possibilities

    • @sonicboy678
      @sonicboy678 2 роки тому +4

      To add to that, the LRT option would probably _not_ preclude some level of BRT (more specifically, the ROW-sharing aspect).

    • @MP-tz2yn
      @MP-tz2yn 2 роки тому

      "busfanner" dropped on head as child yeah yeah

  • @steamymemes7946
    @steamymemes7946 2 роки тому +83

    The people have spoken MTA. Conventional Rail is the smartest way to go on this project.

    • @durece100
      @durece100 10 місяців тому

      That won't work. Using a conventional rail like the Lirr and metro north for the ibx is too large and too heavy! Plus, it's difficult to make sharp turns. Light rail is a better option.

  • @isaacianstein
    @isaacianstein 2 роки тому +41

    Conventional rail is the way to go, great idea as I commute from Astoria to Brooklyn everyday, so I know its needed!

  • @NewYorkRecordingsNYC
    @NewYorkRecordingsNYC 2 роки тому +89

    Conventional Rail is 100% the best way to go. The tracks for it are already in place and it will be easy to connect to the Bronx later on. Not to mention the most capacity. It would also feel a lot more integrated with the rest of the system despite it being different as it would be heavy rail rolling stock and have similar frequencies. Light rail is okay, but would have less of a capacity and new tracks would have to be added to a place already with tracks, not to mention less capacity. Conventional Rail is the way. Just make sure it's a free connection and is integrated with the existing system

    • @durece100
      @durece100 Рік тому

      Using conventional rail is not the best way to use for interborough express. Light Rail is the best option.

  • @glamslamcam
    @glamslamcam 2 роки тому +103

    I love this. We are in DIRE need of expansion in our transit system & this looks excellent. I’d prefer it to be a Subway-like thing, commuter or light rail. I just wish this was going to The Bronx like it was supposed to when it was the Triboro RX. It still something needed and very worthwhile & I hope it happens very very soon.

    • @drdewott9154
      @drdewott9154 2 роки тому +5

      Well that is not to say whatever it ends up being can't be very subway like. If you want good comparisons, for a Commuter rail option the London Overground is a really good example of something like the IBX but on a much larger scale, spanning through the outer boroughs of London with frequent departures and interconnectivity with the Underground.
      For light rail, a good comparison would be Stockholm's "Tvärbanan" LRT, whose trams are actually those used in the rendering. That line has been known to carry as many as 108.000 passengers per day and goes circumferentially around Stockholm connecting its various metro and commuter rail lines, serving the same purpose as the IBX proposals
      The only one that doesn't really match a subway standard and which feels like a cheapskates solution is of course the BRT, which would likely be too low capacity and unfit for growth.

    • @leftylion5291
      @leftylion5291 2 роки тому +3

      Personally, I'm hoping they bring it to the Bronx and Staten Island after this succeeds. But we'll see! :)

    • @glamslamcam
      @glamslamcam 2 роки тому

      @@leftylion5291 i hope so too! That would be amazing!

    • @kay1229
      @kay1229 2 роки тому +1

      Honestly stuff like this has a lottt of potential, it can be a better way to include communities without building long subway lines and making a new form of commuter express, like what the other person said there can be new lines or extensions to the bronx and new jersey which can be a replacement for busses and trains.

  • @liteprotoss
    @liteprotoss 2 роки тому +10

    As a Brooklynite who frequents Flushing Queens and hates the drive as well as the parking situation there, this gives me hope for commuting again. Gas prices are getting crazy so this will be a great primary way of getting between Bk and Queens.

  • @juanlozada1455
    @juanlozada1455 2 роки тому +62

    Conventional Rail is my top pick. Hopefully in the future they would consider an extension to LGA or The Bronx or even both. One route going to LGA and the other going to the Bronx.

    • @nullnummer
      @nullnummer 7 місяців тому

      still hoping for N/W to LGA 😢

  • @benhanpeter4790
    @benhanpeter4790 2 роки тому +36

    Definitely go for the conventional rail. Fastest and most reliable option, and no need for extra tracks. BRT just seems ridiculous in this scenario, you literally have tracks already. As many others have said, this should be fully integrated with the subway system with free transfers and metrocard compatible. I use metro north regularly and like their fare system well enough, but it certainly doesn't beat metrocard/OMNY.

  • @TranscendentAzure89
    @TranscendentAzure89 2 роки тому +44

    This project has been LONG needed in the city and absolutely shouldn't be anything but conventional rail of these three options. We need to consider the future and potential ease of expansion to both the Bronx and Staten Island absolutely *have* to be on the table.
    Conventional rail with trains modeled after and performing like subway rolling stock is an excellent start, but we also need proper single swipe fare integration. Rides can't be overpriced or overcomplicated with things like tickets or MNRR/LIRR pricing. In order to see the highest possible usage potential for this project, you *have* to make sure the users who would benefit the most from this see it as a strong option contemporary with the rest of the NYC subway system especially since this service is already predominantly running through some of the poorest neighborhoods in Brooklyn. You can also aid in adoption of this service by making it have easily understood designations alongside the original subway network (give it an "X" bullet and make it visible on future subway maps).
    As for the other options... Throw that bus rapid transit idea out immediately. It's easy to say in a video like this how it'd be flexible and "easy" to implement but it's just begging for people who don't know any better to turn in on this new "exclusive" lane and cause havoc alongside squandering the full potential of a new rail alignment. Light rail is cute, and probably would get attention for the novelty, but this is a once in a generation chance to make something that really addresses a unique issue with modern NYC public transportation while possessing tons of potential to build off of. Let's not go with novelty for novelty's sake here.

    • @sonicboy678
      @sonicboy678 2 роки тому +3

      I'd love to see this line follow Victory Boulevard in the future.

  • @floydbelljr.2119
    @floydbelljr.2119 2 роки тому +18

    I think that conventional rail is the perfect choice. As for the trains, I suggest to make them all 10-car trains with 10-car stations. Have 2 tracks on each side of the station. And finally, have the new IBX line to be extended to go to the Bronx, because they want to experience what this new line would be like. It's a wonderful new wave of the future in New York!

    • @superbrownsheep3777
      @superbrownsheep3777 2 роки тому

      You never know man. Maybe they might, maybe they might not. Only time can tell.

    • @trijetz3562
      @trijetz3562 2 роки тому

      @@superbrownsheep3777 I feel like it just makes the most sense for them to commit to this project. If they don't then I would be surprised.

  • @TransitUSA
    @TransitUSA 2 роки тому +15

    I think conventional rail would be the best option. The tracks are already in place, and if that isn’t enough, the space for the tracks are already there. This will be huge for those living in Flatlands and SW Canarsie, as only bus service operates through this area.

  • @rachelkowal3626
    @rachelkowal3626 2 роки тому +13

    I am so excited in general! I live pretty close to the Ave. J stop on the Q. This would really help people connect more with friends and family. There are a bunch of people and places I’d visit if there were a better transportation option that didn’t involve Manhattan.

    • @CaseysTrains
      @CaseysTrains 2 роки тому +3

      It would actually connect to the Avenue H but hey one stop on the Q. (The freight tracks this line follows actually crosses under Avenue H station at the Coney Island End.)

    • @HabonimOffice
      @HabonimOffice Рік тому

      @@CaseysTrains the station would be 1.5 blocks from J, so still very walkable. I grew up between K&L so the J and M stops were both really close. Now I live in Queens and getting back to Brooklyn to visit friends and family is a pain in the butt. I need this line yesterday!

  • @ChicagolandTransit
    @ChicagolandTransit 2 роки тому +17

    I'm glad the MTA will be using portions of freight right-of-ways for this project. They should go for the conventional rail option and design it similar to CTA's Orange Line, which runs alongside unused freight lines to Chicago's Midway Airport.

  • @davidsixtwo
    @davidsixtwo 2 роки тому +41

    After watching the town hall, I gotta say I'm skeptical that the light rail option could be faster than the conventional rail option when you have so many at-grade crossings. In practical operation in NYC, you're going to have issues at the grade crossings. Conventional rail seems much more resilient to prevent interruptions.

    • @frafraplanner9277
      @frafraplanner9277 2 роки тому +3

      The light rail option being fastest is BS

    • @davidsixtwo
      @davidsixtwo 3 місяці тому

      @@xergiok2322 the problem here is the grade crossings on the light rail

  • @jei1600
    @jei1600 2 роки тому +27

    Conventional rail is definitely the best option in terms of capacity and speed. The population density of the neighborhoods that IBX will serve, especially Jackson Heights and Bay Ridge, will also justify using a commuter rail like option, hopefully one that accepts MetroCard. I wouldn't mind light rail either, but definitely no BRT.

    • @JBS319
      @JBS319 2 роки тому

      I can say for sure without a doubt this will NOT accept MetroCard. By the time it opens, neither will the subway.

  • @a.j.santiago303
    @a.j.santiago303 2 роки тому +9

    I don't even live in NYC anymore but I'm with the majority on this: conventional rail is the way to go.

  • @Gregq96
    @Gregq96 2 роки тому +18

    To everyone saying conventional rail is the answer: make sure to attend hearings! Get your voice heard

  • @TeshawnEdmonds
    @TeshawnEdmonds 2 роки тому +39

    Conventional rail is THE only way the Interborough Express will reactivate the LIRR Bay Ridge Branch due to overall historical significance. Light rail & bus rapid transit will be too slow &/or too few riders.

  • @lac2275
    @lac2275 2 роки тому +5

    Long overdue!....the infamous 2hr queens to brooklyn commutes would be finally a thing of the past

  • @OsagieGuobadia
    @OsagieGuobadia 2 дні тому +1

    The Inter-Borough Express will worked. As long as we as commuters react to it many times by the year 2026, the MTA will have what it takes to constructed this express and the Queens Transit line. Soon, commuters will ride the Inter-borough express from Queens to Brooklyn and Brooklyn to Queens, 24/7. : )

  • @nicholasloud7772
    @nicholasloud7772 2 роки тому +22

    For the love of God please just use conventional rail. Don’t screw this up MTA, South Brooklyn needs transit

  • @seanharan9521
    @seanharan9521 2 роки тому +12

    Conventional rail seems to be the best option especially when you consider public perception is important and conventional rail tends to be what people perceive the best.

  • @BalticoYT
    @BalticoYT 2 роки тому +17

    I'm not from Brooklyn or Queens, but I'm right next to 'em.
    Conventional Rail is the best way to go. Specifically, the proposed LIRR-style regional rail stock.
    You wouldn't have to waste money on building over-rail structures for light rail or bus rapid transit. Just make the rolling stock and the stations, and there you are. Freight can still run.
    Light Rail would require new tracks, and BRT? Really? Why waste a whole bunch of taxpayer money to build a road above very fine tracks?
    Plus, as others have stated, there's the potential of expanding the line to the Bronx via Randalls and Wards, or, what I propose, making a separate branch that's under the same brand, with the two branches connected via the proposed LIRR Sunnyside Station (Please get to that after East Side Access).
    One issue, for me, is that the shorthand name should be different. IBX sounds too similar to IBS.
    Maybe the InterBo?

  • @ryanfigueroa2058
    @ryanfigueroa2058 2 роки тому +3

    Light rail sound like a great idea bc it's the shortest end to end time and has the most weekday riders.

    • @transitcaptain
      @transitcaptain 2 роки тому +4

      They lied to our faces. Light rail crosses streets and runs slower, and they think commuter rail will have lower ridership, but if the experience is like a subway, it will be the same level

    • @somecallmeelvis
      @somecallmeelvis 2 роки тому +2

      Former Mayor DeBlasio made a proposal on a light rail that connects the Crosstown line to Astoria this was long before this.

  • @donaldapplebee
    @donaldapplebee 2 роки тому +9

    Conventional rail/subway is the way to go as it has right of way and a connection to the Bronx is needed. It makes the most sense allowing possible connections to the other subway lines without needing “new” equipment. The busses are the worst idea. We have the silver line in Boston and once it interacts with street traffic it gets bogged down the green line as well for that matter.

  • @captainjake7417
    @captainjake7417 2 роки тому +54

    Best way to go is conventional rail. This could mean better connections to other lines

    • @durece100
      @durece100 Рік тому

      Conventional rail is too heavy. This is not going to work for the Interborough Express.

  • @ahmedfarhan843
    @ahmedfarhan843 Місяць тому +1

    Not bus, but conventional Rail is more & more best compared to others! We are waiting for this line. My my suggestion is upto Bronx. Brooklyn to Queens to Bronx.
    Then all areas's public would benefit!
    But, the question is, when will you start construction?

  • @nikhilnandagopal8539
    @nikhilnandagopal8539 2 роки тому +8

    Agree that conventional rail is best given the ridership volume and high frequency need. Would be really useful to have several north-south parallel lines running to connect college point and whitestone in queens to jfk and beyond (e.g. Long Beach) as well as several north-south lines to connect Astoria and Jackson Heights to Sheepshead Bay/National Recreation Area via and adjacent to East New York. Please, please make this happen in this decade.
    Also, extending to a Bronx-Queens connection

  • @joshuav875
    @joshuav875 2 роки тому +8

    The conventional rail card is the best option for the new route. For future provisions, it should be extended to St. George in Staten Island for a fast connection to Brooklyn and to ease out traffic on the Verrazano bridge

  • @awesomeconservative
    @awesomeconservative 2 роки тому +2

    I’m glad there’s going to be a rail in Bay Ridge.

  • @travisgames6383
    @travisgames6383 4 дні тому +1

    What a great way to gentrify certain areas very clearly put along this line

  • @usernameusername4037
    @usernameusername4037 2 роки тому +7

    Conventional rail a la Overground is absolutely the right choice.

  • @mrmaq007
    @mrmaq007 2 роки тому +2

    I'm all for it. I'm working in Brooklyn now and it's taking me an hour and half to and from

  • @InfiniteStrife77
    @InfiniteStrife77 2 роки тому +9

    Order more R211S for this. They are FRA-compliant and can run alongside freight trains. They can also be stored & maintained at the Coney Island Shops.

    • @TheRailLeaguer
      @TheRailLeaguer 2 роки тому +3

      The plan is not to use subway-style cars for this, but rather cars similar to what the LIRR and Metro-North have.
      A new yard will be built regardless as existing yards cannot handle additional train storage needs.

    • @banksrail
      @banksrail 2 роки тому +1

      @@TheRailLeaguer It should be with subways. Yards are currently storing old rolling stock that has yet to be scrapped. A small portion of the rolling stock on the subway system is completely redundant to say the least. Space can easily be made. the line literally passes the Fresh pond yard and Jamaica.

    • @TheRailLeaguer
      @TheRailLeaguer 2 роки тому

      @@banksrail The subway option was ruled out to have the line compliant with FRA regulations.
      In addition, the subway option would also need to provide both a physical separation and a sufficient right of way width for clearance. Think of the DC MetroRail. Meanwhile you can use conventional rail without the need to physically separate the whole thing.
      The subway system also has no redundant fleet, and some yards literally have no space to expand. Besides, a new yard would have to be constructed anyway.

    • @banksrail
      @banksrail 2 роки тому

      @@TheRailLeaguer Literally no Redundant Fleet??? The R32 and R42 are literally the definition of redundancy. The MTA just kept them around in case the R179 failed. It’s literally redundant. The MTA doesn’t keep “THE EXACT AMOUNT OF TRAINS NEEDED.” That’s unheard of and quite comical if they did. I’m sure they could spare 8 four or five car sets to be used on the IBX.

    • @TheRailLeaguer
      @TheRailLeaguer 2 роки тому

      @@banksrail Yes there’s no redundant fleet. The R32 and R42 cars are officially retired and a good majority of them are on work train service and destined for scrap. Those cars are also way too old.
      IBX also requires more train sets than you state, especially for frequencies, so the money would be better spent doing conventional rail, and buying brand new commuter rail-like cars with subway style layouts operating very frequently.

  • @c.t.8614
    @c.t.8614 2 роки тому +13

    I like the train option the most

  • @victorhernandez1857
    @victorhernandez1857 2 роки тому +6

    Conventional Rail is the way to go. Bus and light rail would be a mess at street level.
    I hear a lot of people mention the Bronx being left out. A fair temporary compromise could be a station that connects the Northern Blvd M/R lines to the Metro Norths Bronx expansion that will be traveling directly above it. It's already going from Coop City, Morris Park, Parkchester, and Hunts Point across the Hells Gate Bridge through the Sunnyside Yards to Penn Station. A free transfer stop at Northern Blvd would fully integrate the Bronx into a non-Manhattan-centric system.
    Also extend it to LaGuardia Airport from Jackson Heights, with plans to spur off to the Bronx in the near future.
    Maybe even a station between Queens Blvd and 51st Ave to capitalize of the two potential Queens LIRR stops after the split going to Woodside.
    Ultimate goal should be completing the Owls Head Park Tunnel at the end of the line in Brooklyn and connecting Brooklyn to Staten Island and ultimately opening up a second freight corridor to the mainland US.

    • @DTD110865
      @DTD110865 2 роки тому

      I have to disagree with you on the Owl's Head Park tunnel. That should only connect the subway system to the Staten Island Railway.

    • @victorhernandez1857
      @victorhernandez1857 2 роки тому

      @@DTD110865 a second dual use Freight corridor would remove thousands of trucks from the roads and highways daily.
      One railcar can hold the equivalent of roughly four truck loads. Additionally, one train can haul the equivalent of over 400 trucks. 10 trains a day can take 4000 trucks off the road.

    • @DTD110865
      @DTD110865 2 роки тому

      @@victorhernandez1857 I understand that. But you'd have to rebuild the existing tunnel to handle both the subway line and the freight line. Also, you'd have to restore the SIR North Shore Line strictly for freight, and too much of that line is being washed into Kill Van Kull.

    • @JBS319
      @JBS319 2 роки тому +1

      Cross Harbor Freight is a big part of this project as well. As the line is constructed, clearances on the entire corridor will be made to allow for double stack intermodal freight trains.

  • @osagiee.guobadia-secondytc4624
    @osagiee.guobadia-secondytc4624 2 роки тому +4

    Awesome for the Proposed Interborough Express to be happening in the MTA. : )

  • @mgarner1227
    @mgarner1227 2 роки тому

    I love this idea. Connecting the two boroughs and making trips shorter and easier is the way to go.

  • @ssmith2832
    @ssmith2832 8 місяців тому +1

    The MTA has so much opportunity to make 3 new subway lines in queens and brooklyn. A minimum of 3. All based on older plans and unused infrastructure which people forgot about

  • @mevissaaa
    @mevissaaa 2 роки тому +7

    why did they delete this yesterday and reupload this

  • @Tokax
    @Tokax 2 роки тому

    As a new LIRR rail fan this is gonna be so cool! Can’t wait

  • @dylanst3802
    @dylanst3802 Рік тому +1

    This would a game changer for me and make my life easier please do this!!!!! no buses

  • @jpdemer5
    @jpdemer5 2 роки тому +9

    Buses are a non-starter. Hugely expensive to construct (and maintain) miles of elevated roadway, and a platoon of extra employees to drive them all. Conventional rail makes the most sense: the tracks are already there; all you need are the cars and the stations. Station entry with the existing fare system is trivial to implement, and passengers would hardly notice the difference from the other subway system lines. (I'd love to just transfer at the 36th St. R station!)

    • @JohnCowan-rv7ne
      @JohnCowan-rv7ne Рік тому

      The existing tracks are strictly freight-only; mixing freight and passenger service would cost a fortune. So new tracks (but not new RoR) are needed for every option.

    • @jpdemer5
      @jpdemer5 Рік тому

      @@JohnCowan-rv7ne Freight can move late at night - it's not in a hurry. (Most of what I see being moved is carloads of scrap.)

  • @BL4CKKN1GHT
    @BL4CKKN1GHT Рік тому

    As someone who lives in the atl metro area I must say I’m jealous of NYC and it’s willingness to expand rail in its city. That’s something we need here in Atlanta desperately

  • @shaunganley
    @shaunganley 2 роки тому

    Remember growing up so close to these tracks. Can't wait to see what happens. Conventional rail is the best approach.

  • @randombandsheetmusic5085
    @randombandsheetmusic5085 2 роки тому +5

    Build it yesterday, using heavy-/conventional rail, closer to the Subway than MetroNorth/LIRR in terms of doors and seating arrangement.

  • @thomaspatterson5913
    @thomaspatterson5913 2 роки тому +10

    Conventional rail is the way to go👍🏾 maybe you can connect to the LIRR and future Metro North Railroad if they going to the Bronx

    • @Frankieefootballmundial
      @Frankieefootballmundial 2 роки тому

      The future metro north should run from Long Island city queens or anywhere from northern queens such as bayside to go into the Bronx and the Hudson valley without having to go from grand central

  • @coolundbidda7611
    @coolundbidda7611 2 роки тому +6

    Please go for conventional rail! Amazing project. Circumferential routes are what makes a transit system truly great, like Berlin or Tokyo

  • @andrewharmon5843
    @andrewharmon5843 2 роки тому +3

    Convential all the way! And since you used the Class 150 as the model for conventional rail, I must add, a Class 150 in the us would be pretty cool

    • @mysticaloreo9278
      @mysticaloreo9278 2 роки тому

      Yeah i noticed that too, never gonna happen tho xD. But maybe they'll use the stadler flirt trains or something like the talent trains

  • @natewoodmusic
    @natewoodmusic 2 роки тому

    I live on this proposed rail and can't WAIT for the antiquated, insanely loud dumpster freight trains to be replaced. Conventional rail makes the most sense, though the quieter the better! What a huge quality of life upgrade this will be for everyone in NYC.

  • @aquaneon8012
    @aquaneon8012 2 роки тому +12

    Please add platform barriers if you are going with Conventional Rail or Light Rail.

  • @taylorhoge8181
    @taylorhoge8181 2 роки тому

    Wow!! Thank you! You recognized the public's actual needs vs the real estate industry. I hope this can function by end of this decade or better yet...SOONER

  • @EdwardM-t8p
    @EdwardM-t8p Місяць тому +1

    WHY DID YOU PICK LIGHT RAIL?
    The subway-like conventional rail is the way to go and it would attract far more than 85k passengers per day. The light rail would become overburdened in short order while with conventional rail you can just add more cars.
    The rail cars can be FRA-compliant subway cars of the sort the PATH uses and you could piggyback on a PATH railcar order for the IBX. Miami's Metrorail and Baltimore's Metro Subway Link jointly ordered subway cars from Hitachi. The MTA has used FRA-compliant cars before with the Staten Island Ry., you guys can do it again!

  • @fernnewyork
    @fernnewyork 2 роки тому +1

    So excited for this! Let's make it happen.

  • @urfavidiot1414
    @urfavidiot1414 Рік тому +1

    As a person who lives near that area, there should definitely be a stop near Linden Boulevard including a possible connection to the L train

  • @ap-pv7ug
    @ap-pv7ug 2 роки тому +2

    If you go with the bus option, it will turn into a regular highway within the decade. Brooklyn and Queens finally have the opportunity to have a dedicated train line. Don't waste it. Commuter rail is the way to go.

  • @worldofjck
    @worldofjck 2 роки тому +2

    Go conventional rail - the future needs of the system can always be met better that way, and it’s an investment in the city for the future!

  • @TimothyBrown2010
    @TimothyBrown2010 2 роки тому +6

    Conventional Rail! Hands down!

  • @seamymc5945
    @seamymc5945 2 роки тому +1

    Don't cheap out! Go for conventional rail with full grade separation/no level crossings. You have a golden opportunity here. I live in London, so I have no stake in this, but take a look at the London Overground for inspiration. This is a bit of a long comment but the things that will make this a success are:
    - Fast, reliable and frequent service. Needs to be a train _at least_ every 15-mins, increasing to subway frequencies in the future. Anything less will kill rather than induce demand.
    - Integrated with subway ticketing systems
    - Connections to other services - where it isn't possible to provide an in-station connection, allow passengers to connect to subway services or trains that are e.g. a 200m walk away without charging them for a second journey. Add as many connections as possible.
    - Lifts, step free access and level boarding of trains from the start (one of the failings of London Overground, IMO)
    - Clean and modern trains
    - Leave room for it be extended to Staten Island and further into Queens in the future
    With Overground, TFL (London's MTA equivalent) has completely transformed outer-London travel by taking over conventional rail lines that either had infrequent/unreliable passenger service or in some cases had closed decades earlier. They upgraded and rebuilt stations, put in new trains and provided regular, frequent services and provided an outer-London orbital service. It's been transformational. Passenger numbers have gone through the roof.
    Probably most similar to the IBX, they completely transformed the Gospel Oak to Barking line. It was a line running through outer areas that was mainly used by freight but had a slow diesel passenger service that was super infrequent and unreliable. It was nearly closed several times. Over the years TFL electrified it, renovated stations, increased the length of the trains from 2 cars to 4 and increased the frequency from every 30mins to every 15mins. It's been such a success that it can't keep up with demand.
    The East London Line extension took over a rundown minor tube line and extended it over disused rail viaducts and existing conventional rail corridors to made a subway-like service on the cheap. It created so much demand that within a few years they had to extend the trains from four to five cars, and it's still super busy at all times of the day.

    • @JBS319
      @JBS319 2 роки тому +1

      If they want the least-expensive option to build, it's gonna end up being conventional rail. So "cheaping out" and going for BRT would cost a huge amount more than just using the existing line.

  • @lukeoconnell4057
    @lukeoconnell4057 2 роки тому +1

    One of the best ideas for new york in a long time, increase ferry service too please!!!

  • @omar.w939
    @omar.w939 2 роки тому +7

    The first option is the answer. A train that has more doors then the LIRR, sharing and reconstructing the existed fright rail, and plans (if proposed) to extend the IBX train to the Bronx. Also they should get battery powered trains for the line just like LIRR are planning with that.

    • @Equulai
      @Equulai 2 роки тому +2

      For battery powered trains, you still need overhead wires to charge the batteries. It's more cost-efficient and better for the environment to just use electric trains that draw power from the overhead wire all the time.

    • @sygneg7348
      @sygneg7348 2 роки тому

      Hell no, never battery trains. Why replace such an efficient system with an inefficient and dangerous one?

    • @omar.w939
      @omar.w939 2 роки тому

      @@sygneg7348 No hate but, LIRR is planning to get battery electric multiple unit (BEMU) trains in the future. Also, if they decided to to extend the IBX to the Bronx, the trains would need to have catenary wires or be battery electric powered. So if you trying to say the IBX trains should run on third rail and catenary wires, ok that's a good idea too, because extending the line to the Bronx, have already catenary wires for Amtrak and future New Haven line proposal.

    • @JBS319
      @JBS319 2 роки тому

      @@omar.w939 LIRR is planning to get battery electric trains for the non-electrified routes in eastern Long Island. And the battery electric trains would also operate on the third rail in electrified territory. Full battery electric is a poor idea unless they are sharing tracks with freight.

  • @sravasaksitam
    @sravasaksitam 2 роки тому +2

    Love this idea! Would make my commute from Staten Island to Sheepshead Bay much easier.

  • @samibriellefandom8408
    @samibriellefandom8408 2 роки тому

    This is absolutely the way to go and very convenient to !

  • @chunhchan
    @chunhchan 2 роки тому +10

    If you do bus rapid transit, I would imagine other motorists or bicyclist will try to take advantage and use parts of the line.

    • @MarloSoBalJr
      @MarloSoBalJr 2 роки тому +1

      Which is why that idea is a full blown👎
      Everyone wants rail but which style of rail is the question... and cheapest

    • @jamallhayden2512
      @jamallhayden2512 2 роки тому +1

      @@MarloSoBalJr It should use modified M8 railcars (New haven line E.M.Us). This way the service could interstate with Metro North and or Lirr, plus it opens up the possibility of extending to the Bronx in the future!

    • @DDELE7
      @DDELE7 2 роки тому +1

      @@jamallhayden2512 and if you really wanna be revolutionary then equip the train fleet with some sort of battery operation so you wouldn’t have to deal with electrifying the Bay Ridge branch and you would then recharge trains with existing third rail/catenary power in Queens.

  • @bedinskiboi
    @bedinskiboi 2 роки тому +3

    They should have just made a new subway line... they could've called it the X line. The fact that the MTA chose light rail for this is kinda disappointing, especially since this is serving so many people.

  • @SonofBaldwin
    @SonofBaldwin Рік тому

    This is a fantastic idea. At some point, we should consider extending it to the Bronx as well.

  • @lukedahlinghaus6019
    @lukedahlinghaus6019 2 роки тому +1

    I’ve been hearing about this idea for a long time so I’m glad to see the MTA put out a video. Conventional rail seems like the best. At all costs please avoid busses. Busses just seems like such a waste of infrastructure just to build another road. Hopefully this project gets approved, I don’t really see any downsides to its construction.

  • @Droidman1231
    @Droidman1231 2 роки тому +2

    In a lot of American cities, the total population and population density makes conventional rail not the best option. New York absolutely has the justification for the conventional rail though. I hope they extend it to The Bronx too!

  • @onionymous
    @onionymous 2 роки тому +14

    BRT and LRT are way too low capacity for this line, conventional rail is the way to go

    • @aqua2poweros699
      @aqua2poweros699 2 роки тому +1

      Actually LRT ain't too bad of an idea imo. Bus Rapid Transit is ridiculous.

    • @Ciana214
      @Ciana214 2 роки тому

      @@aqua2poweros699 no LRT is a pretty bad idea. The capacity definitely would be less than conventional rail. Also less space efficient, more expensive, and slower. Whoever made this video got their information wrong.

    • @aqua2poweros699
      @aqua2poweros699 2 роки тому

      @@Ciana214 Obviously Conventional Rail is the best option but I'm just saying

  • @travisbeagle5691
    @travisbeagle5691 2 роки тому +2

    Light rail with Tram-trains like those used in Karlsruhe Germany, can be another option. They can allow for you to employ light rail on the existing track network and have the flexibility later to easily expand into either a tram network or a dedicated light rail network later down the line.

    • @travisbeagle5691
      @travisbeagle5691 2 роки тому

      I probably should have also stated that light rail in the Tram-train form is also compatible with conventional rail. Karlsruhe often uses them in conjunction with heavy metro trains.

  • @ivanmartinez8346
    @ivanmartinez8346 2 роки тому +1

    Conventional rail is definitely the way to go

  • @trolltwin1485
    @trolltwin1485 3 місяці тому +1

    @mtainfo What will the official colour for the IBX be when printed on the NYC Subway map? Also, will the IBX get extended beyond Roosevelt Avenue to meet up with the Amtrak?

  • @HelloooThere
    @HelloooThere 2 роки тому

    This needs to go to the northeast Bronx and even New Rochelle!

  • @michaelrmurphy2734
    @michaelrmurphy2734 2 роки тому +2

    The B1M channel did a video about this. Its an interesting project. Perhaps from Bay Ridge through a tunnel to
    Staten Island and New Jersey? Of course The Bronx should be the next phase. But after yesterday, get the guns off MTA!

  • @jacoblopez6046
    @jacoblopez6046 2 роки тому +1

    @MTAinfo Conventional rail would be the best way to go using older train cars from the 6/2/B/D lines making way for newer proposed train cars for those respective lines. It would make sense to expand into the Bronx after completion with the Hells gate bridge section being the most challenging part due to 3 tracks but I assume freight trains can run in the middle track? A "Randall's Island station" could be implemented somewhere on the island, "Hunts Point Ave" already has an abandoned station which could be renovated as well as "Whitlock Ave", "Parkchester station" could be on the Bronxdale Ave and E. Tremont Ave Intersection, a "Eastchester Rd station" could be right by Calvary Hospital and Einstein Hospital, "Pelham Parkway South station" or simply "Pelham Bay Park station" which is right by the PSAC 2 building and could connect to the BX12 with a possible next last stop being "Co-Op City South" (not sure where).

    • @MFCHYLL
      @MFCHYLL 2 роки тому

      100% should do this 👍🏻

    • @TheRailLeaguer
      @TheRailLeaguer 2 роки тому

      The plan for rolling stock is FRA-complaint railcars similar to commuter rail cars built from scratch rather than inheriting older non-FRA subway cars and undergoing expensive refits for FRA compliance.
      However do note that the interior layout will be similar to the subway cars.

  • @silverskyscraper1179
    @silverskyscraper1179 10 місяців тому +2

    Make it a part of New York City transit. Not Long Island RR. If you want to make the train cars built similar the LIRR go right ahead but make sure it will be able to intermix with New York City Transit Train.

  • @jonappleseed5270
    @jonappleseed5270 2 роки тому +1

    this will be completed in 2050, if not 2100. good luck getting something like this done in NYC. wont be holding my breath

  • @jamallhayden2512
    @jamallhayden2512 2 роки тому +3

    The conventional rail option should use modified M8 railcars (New haven line E.M.Us). This way the service could interstate with Metro North and or Lirr, plus it opens up the possibility of extending to the Bronx in the future!

  • @TheRailLeaguer
    @TheRailLeaguer 2 роки тому +2

    For everyone who is asking why the Interborough Express isn’t using the subway method, this is why:
    Why aren’t you considering regular subway service for the line?
    Due to regulatory separation requirements between freight traffic and heavy rail, using subway train cars on the line would require additional width along the corridor, leading to multiple bridge reconstruction, the potential for significant property acquisition and much higher construction costs.
    However, the conventional rail alternative would feature vehicles resembling those currently used within the subway system, including more doors than a conventional rail car and subway-like seating configurations. We also expect all three modes under consideration to operate at intervals similar to subway service, with up to five-minute frequencies during peak hours.
    READ IT. GOD GAVE YOU TWO EYES AND A BRAIN FOR A REASON!!!!

    • @TransitTalkEXTRAS
      @TransitTalkEXTRAS 2 роки тому

      Yeah, because the way the tracks are they can;t use the R-type cars that the subway uses.

    • @johnpegram8889
      @johnpegram8889 2 роки тому

      An FRA waiver should be considered if necessary, to permit subway-type cars.

    • @TheRailLeaguer
      @TheRailLeaguer 2 роки тому

      @@johnpegram8889 I think it might be too much of a hassle to get through, especially for an active freight line. If it were easier to get, then everyone would be getting waivers. Besides, getting an FRA waiver (something that can bog down the construction time) is not the plan. Conventional rail can honestly do a much better job without the paperwork,

  • @StockTraderClassLive
    @StockTraderClassLive Рік тому

    This is the kind of city planning and zoning that I am talking about, this is awesome! Personal thoughts, that it should not take years to send out drones and LiDAR equipment to scan the proposed areas, including existing transit routes and population density. The two level approach is probably most appropriate but I would recommend, it should be designed/built in a way where it’s mostly enclosed to allow for winter hassle free travel and entertainment throughout the route. As a modern facilities that not only services residents travel but a visitors destination adventure, which mean the neighborhood restaurants, sporting facilities, supermarkets and movie theaters should be part of each station’s consideration.

  • @anthonypearson6759
    @anthonypearson6759 6 місяців тому

    2 years later and we’re still in planning phases. Come on MTA, enough “consultations” and more construction!

  • @davidmoog6223
    @davidmoog6223 2 роки тому +2

    The final stop in Queens should be 74th Street Jackson Heights not 69th Fisk. If the MTA is spending the money build the 3 block tunnel and allow easy transfer to the E,F,R,M and the 7. It would also allow easy transfer to the bus lines terminating at the Jackson Heights (the Victor Moore bus station).

    • @aqua2poweros699
      @aqua2poweros699 2 роки тому

      Nah. Plus, for the people who are too lazy to walk 3 blocks to 74st, just take the Q32 or maybe even the Q70 if they are going to make a stop over there.

  • @1234smileface
    @1234smileface 2 роки тому

    Great news! Have it built!

  • @Theultimatetwindoges
    @Theultimatetwindoges 24 дні тому +1

    3:50 hell yes

  • @merccadoosis8847
    @merccadoosis8847 Рік тому

    Light rail/tram is the best way. It works everywhere it is used throughout Canada, the USA, and especially in Europe. Here in the Twin Cities, MN it has worked superbly well. So much so that it re-captured the investment money used to build it within a remarkably short period of time. As the video shows it costs less to operate than does conventional rail and will pull in many more passengers. This, in turn, will generate more revenue from the paying customers while promoting more commerce and transportation to recreation areas.

    • @Gfynbcyiokbg8710
      @Gfynbcyiokbg8710 10 місяців тому

      It definately isn't. You clearly don't know what you are talking about

    • @merccadoosis8847
      @merccadoosis8847 10 місяців тому

      @@Gfynbcyiokbg8710
      Liar!
      According to a study done by Fiona Ferbrache, Richard D. Knowles (in 2017) it does work. If you're such an "expert" on the subject, lets see you prove them 'wrong'.

  • @Bassotronics
    @Bassotronics 2 роки тому +1

    E train from Courts Square, to M train Metropolitan and from there to Jamaica Center would cut all the way through mid-Queens.

  • @stickynorth
    @stickynorth Рік тому +1

    Get it built already!

  • @OptionedOut
    @OptionedOut 2 роки тому +1

    There is already a tunnel above the Utica Ave station. Use that and save money/time/resources :)

    • @JBS319
      @JBS319 2 роки тому

      This is a full line that already exists. Diverting from the Bay Ridge line and digging new tunnels to the tunnels above Utica Avenue would defeat the whole purpose. Plus this will have a transfer to the A/C at Broadway Junction

  • @Nick-kz6dg
    @Nick-kz6dg 2 роки тому +4

    Why would you build an elevated light rail running on top of train tracks when you can just upgrade said train tracks that the MTA already owns and run the IBX on that? Convention rail is the only sensible option.

    • @jamallhayden2512
      @jamallhayden2512 2 роки тому

      Facts 💯

    • @amazing50000
      @amazing50000 2 роки тому +2

      It is about money. That is the only reason why the Light Rail & Bus Rapid Transit options are there. We all know that Conventional Rail is the best option.

  • @TrinityTwo
    @TrinityTwo 2 роки тому

    I like the proposal and think conventional rail would be the best route. Definitely look into stations near existing bus or subway routes so people can make connections as smoothly as possible.

  • @parkerbrown7970
    @parkerbrown7970 2 роки тому +1

    Conventional rail is by far the best option. It is much easier to add capacity on conventional rail and it would tie in better to existing transit systems. Maximizing ridership capacity should be a major consideration to get as many cars off the roads as possible. Separated dedicated lines would be the best. Please please whatever you do don't run BRT or light rail at street level.

  • @dylzu
    @dylzu 2 роки тому

    I love it! and conventional rail is definitely the way to go

  • @spiderdx
    @spiderdx 2 роки тому +1

    Hopefully the day arrives when the Bronx connects to Queens. Would make the trip way easier. Also conventional rail is the only right answer. Hopefully is sooner than later.