LEAN: 8 wastes

Поділитися
Вставка
  • Опубліковано 24 гру 2024

КОМЕНТАРІ •

  • @ZarifAziz
    @ZarifAziz 5 років тому +20

    Defects
    - Documents containing missing or incorrect information
    - Example: Invoice missing the PO number. A spreadsheet containing the wrong numbers
    Overproduction
    - more than is immediately required by the customer
    Waiting
    - When you don’t have the right parts, information or instructions you need to do the task
    Non-standard Processing
    - Using more than is needed to complete the task / When the team uses different steps to complete the same task
    Transportation
    - The moving of people, products and information
    - Anything that must move more than is absolutely necessary is considered waste
    - One lean project removed 4 minutes of transportation and saved 40,000 dollars
    Intellect
    - Underutilizing team members by not matching their skill sets and capabilities with the tasks or work needed
    - Can also happen when tasks are delegated without adequate training being provided
    Motion
    - Excess bending and turning when repeatedly using materials for the job
    - Relocating materials to a point of use can reduce this type of waste

  • @ieguy1686
    @ieguy1686 2 роки тому +1

    Great video! I remember the 8 waste by saying T. Timwood = Talent. Transportation, inventory, motion, waiting, overproduction, over processing, and Defects. I love teaching about Lean methodology.

  • @boy000kulet
    @boy000kulet 6 років тому +11

    1 Defects
    2 Overproduction
    3 Waiting
    4 Non-standard Processing
    5 Transportation
    6 Intellect
    7 Motion
    8 Excess Inventory

    • @ArifKhan-rn5mf
      @ArifKhan-rn5mf 6 років тому

      Fml2 I think it is a good day and the poo and

  • @XAaronJadeX
    @XAaronJadeX 4 роки тому +1

    I like your way of teaching! Your drawings are great!

  • @DC-pk9nz
    @DC-pk9nz 2 роки тому

    Great video,0n different areas to look at

  • @leduong3132
    @leduong3132 3 роки тому +2

    8 WASTS = DOWNTIME
    1. Defect
    2. Over_production
    3. Waiting
    4.Non-Utilized Talent
    5.Transportation
    6.Inventory
    7.Motion
    8.Extra-processing ====> and #9th : Infomation

  • @danielmateocortes2836
    @danielmateocortes2836 8 років тому +1

    Awesome, thanks a lot. Really simple, visual and conveys very important info.

  • @mizutanii
    @mizutanii 2 роки тому

    I LOVE LEAN 💜💜💜

  • @SeniorRed1337
    @SeniorRed1337 6 років тому +1

    Thank you!

  • @wandaburnett1482
    @wandaburnett1482 6 років тому +1

    Lots of waste at work and a lot of room for improvement.

  • @amardipkurukwar4902
    @amardipkurukwar4902 6 років тому

    it's helpful.. thank your for sharing

  • @brendalizett7245
    @brendalizett7245 4 роки тому

    😀

  • @indunilkarunadheera7494
    @indunilkarunadheera7494 6 років тому

    pla send me a eight waste or seven waste.

  • @indunilkarunadheera7494
    @indunilkarunadheera7494 6 років тому

    pla send me a eight waste or seven waste.

  • @indunilkarunadheera7494
    @indunilkarunadheera7494 6 років тому

    pla send me a eight waste or seven waste.

  • @indunilkarunadheera7494
    @indunilkarunadheera7494 6 років тому

    pla send me a eight waste or seven waste.