How to Score High on Cognitive Assessment Test: Practice Questions and Answers

Поділитися
Вставка
  • Опубліковано 14 січ 2025

КОМЕНТАРІ • 137

  • @OnlineTrainingforEveryone
    @OnlineTrainingforEveryone  Рік тому +7

    Practice Cognitive Test: www.howtoanalyzedata.net/cognitive-assessment-test-questions-and-answers/

    • @naseryounes2506
      @naseryounes2506 Рік тому

      Although this video is a year old I'd like to add this comment and ask if multiple answers can sometimes be correct since at 18:10 i actually found a pattern and got the answer 36, as I added 2+2+10+7=21... Then I added 7+3+21+5=36 and your method was obviously correct aswell however for these type of questions do I need to involve every number? Since I didn't involve the 4.

    • @OnlineTrainingforEveryone
      @OnlineTrainingforEveryone  7 місяців тому +1

      Prepare for an Assessment Test: www.howtoanalyzedata.net/assessment-test-practice-and-preparation-resources/
      Download FREE Sample Hiring Assessment Test Questions (PDF eBook): www.howtoanalyzedata.net/0fyb

  • @vivianbarths6022
    @vivianbarths6022 2 роки тому +14

    Thank you for your videos. I've been practicing since yesterday and I've been getting better. I have an exam tomorrow..wish me success

  • @salehmajeed
    @salehmajeed Рік тому +6

    In the example at 00:16:00, there are two correct solutions: 0 horizontally and 3 vertically. 3 is also correct because the pattern decreases vertically by 2.
    The first column is 11, the next column is 9, so the third column should be 7, and answer D) 3 is also correct. This is why I hate this test because it has a lot of confusions.

  • @stretch1807
    @stretch1807 7 місяців тому +17

    but what this have to do with being able to do my job?

  • @abdullahatteyah5434
    @abdullahatteyah5434 9 місяців тому

    its very excellent examples, thank you

  • @waynevince4714
    @waynevince4714 5 місяців тому +7

    I have not idea what you are talking about with all these pattern. Will I need a calculator to pass my drivers test?

    • @irenemacdonald7663
      @irenemacdonald7663 2 місяці тому

      I got the last question right,I'll have to become a major Einstein before I go for my test,never was good at math YIKES!!!!!!

  • @pdoshi2
    @pdoshi2 Рік тому +19

    The correct answer is -33% longer. P1 takes 8 hours, P2 takes 12 hours, and the question is, "How much longer in percentage [terms] it takes P1 vs. P2?" Thus the question should have been posed, "P2 vs. P1" because P1 takes LESS time than P2 or the multiple choice should have a negative option. Sadly this question is flawed. Assuming the question is posed intentionally, then P1 takes 4 FEWER hours or -4/12 = -33% LONGER than P2. There is no changing the fact that P2 is LONGER hence the answer is negative or the question is mistaken or the multiple choice options are insufficient.

    • @gordbaker896
      @gordbaker896 11 місяців тому +3

      50% Question worded improperly

    • @johnharrisonschulz
      @johnharrisonschulz 6 місяців тому +2

      50%. Anyone with common sense could still figure out the answer even if the question was a bit off.

    • @xavier6158
      @xavier6158 17 днів тому

      😮

  • @pavan5524
    @pavan5524 7 місяців тому

    13:16 also forms another patter which is :
    (Current position)² - current position
    1²-1 =0
    2²-2 = 2
    3²-3= 9
    4²-4=12
    5²-5=20
    6²-6=30
    7²-7=42 -> same answer

  • @i.b.jchannel4113
    @i.b.jchannel4113 9 місяців тому

    Great job 👏

  • @irfanulkarim5055
    @irfanulkarim5055 Місяць тому

    At 17:00 min, the missing number problem is 3 from me but you choose 0.
    Column-wise wise sum pattern is 11, 9, and then obvious there subtracting of 2, which 9-2=7. To make it 7 the cell should have the number 3.
    So my logic or explanation is correct to your or not, please let me know.

  • @TheBreezeElephant
    @TheBreezeElephant 7 місяців тому +1

    Thank you for your help!!!

  • @na1wa2l3
    @na1wa2l3 Рік тому +1

    Great job

  • @nathanmccoy2159
    @nathanmccoy2159 25 днів тому

    I did the last one slightly different. I did (2+2+2+2) * 2 = 16 / (3+3+3+3) * 3 = 36 / (4+4+4+4) * 4 = 64

  • @Madameflavor
    @Madameflavor 15 днів тому

    makes me feel good answering fast and correct ! одну ошибку допустила : самую первую задачу с ромбами

  • @muneerdar351
    @muneerdar351 9 місяців тому

    Thanks 😊

  • @POSITIVEPULSE015
    @POSITIVEPULSE015 2 роки тому +27

    My answer is 50%
    8-12=4hours
    And 4hours is the 50 percentages of 8hours.
    My answer is 50% longer than project 1 correct me if I'm wrong.

    • @archit8069
      @archit8069 Рік тому +2

      its 150 lol , more do not mean that you have to subtract 100% , i also used to think that they are asking more that means i have to subtract but trust me answer is always of total . let 8 hr. be the 100% then 12 hr. must represent 150% thats how its 150%

    • @khabbad
      @khabbad Рік тому +8

      @@archit8069 The question was "how much longer" not total time compared to the previous

    • @stretch1807
      @stretch1807 7 місяців тому +1

      @@archit8069 correct. he also worded the question wrong.

    • @lostconciousness4255
      @lostconciousness4255 6 днів тому

      @@archit8069 that's not what the question asked at all. it asked how much longer not total time in percentage compared to project 1 AND the question was worded like shit, it asked how much longer does it take to complete project 1 vs project 2, this would suggest "faster" so 4 hours faster is 33%.

  • @dataguys2000
    @dataguys2000 Рік тому +1

    I got the 22*22 queston by percentages and matched that way. It never actually equaled exactly 30% but that is how I figured it out. Your way is easier in your head.

  • @khabbad
    @khabbad Рік тому +2

    So was it 50%, that's the only thing that makes sense did he reply to anyone?

  • @Test-jl6lj
    @Test-jl6lj Рік тому +6

    The question doesnt make sense as 8 hours is less then 12 hours to complete the project. So why would the question ask how much longer it takes to complete project 1?

    • @netzarim1277
      @netzarim1277 10 місяців тому

      This is used in business a lot...the answer is (12-8)/8; you are looking for the difference between the two.

    • @CalebBrianBooth
      @CalebBrianBooth 9 місяців тому

      People don’t ask it this way in business. If they do then you clarify what they really mean.

    • @lostconciousness4255
      @lostconciousness4255 6 днів тому

      @@netzarim1277 you seem to be misunderstanding how the question was asked.

  • @PlaySomethingg
    @PlaySomethingg 2 роки тому +1

    At 2:19 I got the same answer by doing it this way. Was that just a fluke?
    I took the left diagonal numbers 3,4,10,24 and found (3+1)=4, (4+6)=10, and (10+14)=24. So I had 1, 6, 14. I did the same with these: (1+5)=6 and (6+8)=14. So I then had 5,8. I broke that down to (5+3)=8. So then I was left with 3. I added the very top 24+28 = 52 and then added on the +3 to get 55.

    • @omanvote
      @omanvote 2 роки тому

      The secret is not only to get the correct answer, but what is the best and shortest way to get the correct answer 😉👍

  • @SANAKHAN-hj6gi
    @SANAKHAN-hj6gi 8 місяців тому +4

    22*22= 16
    33*33 = 36
    44*44 = 64
    My calculation:
    Figured out a pattern that a table is being followed so next calculation will be with 4 * 16 since each number has a difference of 4.
    2* 8 = 16
    3*12= 36
    4*16 = 64

  • @naimishparekh7330
    @naimishparekh7330 3 місяці тому +1

    It's answer B 50%

  • @jeyarani1931
    @jeyarani1931 2 роки тому

    Thanks sir

  • @dimitrismic4034
    @dimitrismic4034 Рік тому +1

    09:00 - If you observe an other pattern is looking at the rows. Each row has the same senquence.
    First Row -->5 black squares then 3 then 5.
    Second Row -->3 black then 5 black then 3 again.
    Third Rows --> 5 black then 3 black and then D

  • @Vayanovic
    @Vayanovic Рік тому +11

    Project 1 is completed 50 percent FASTER than Project 2.
    Why? Because 50 percent of Project 1 = 4 hours.
    And it takes 8 hours to complete it vs 12 hours, the difference between 4 hours.
    So it is 50 percent faster.
    * Note: If it was 100 percent faster, it would be 100 percent of the original + 100 percent added boost = double the efficiency which would be the case if Project 2 was 16 hours instead.

  • @danielajimenez2135
    @danielajimenez2135 2 місяці тому

    In a personal note, thank you! thank you for this efford yo do with your videos, thanks to you i`m more confident in my tests and as a result i`m passing every single one of them :D

  • @sesamem7166
    @sesamem7166 11 місяців тому +1

    Why is shape two the fist shape? I am confused.

    • @_Jessicapearl
      @_Jessicapearl 5 місяців тому

      Same😭

    • @tylr3669
      @tylr3669 4 місяці тому

      Look at the image as a set of 3 images, inside diamond, outside 4 part boxes, and far outside 4 triangles.
      Then compare are they white or black in sequence of images.
      Diamond goes black, black, white, white, black -> black
      Boxes goes black, white, white, black, black -> white
      Triangles goes black, black, white, white, black -> black
      In total this rebuilds the second image with black triangle, white boxes, black diamond.

  • @agustindeasas6817
    @agustindeasas6817 Рік тому +2

    The question doesn't make sense "how much longer in percentage it takes to complete project 1 vs. Prject 2.
    In 8 hrs project 1 s 100% complete while project 2 is 66.66% complete only.

  • @adwoaha.mensah2629
    @adwoaha.mensah2629 Місяць тому

    I got the last question right it is ,9

  • @danielskaf5599
    @danielskaf5599 2 роки тому +5

    It is 150% if you say project 2 vs project 1. However project 1 take 66.6% time vs prject 2.

    • @OnlineTrainingforEveryone
      @OnlineTrainingforEveryone  2 роки тому +1

      Thank you for watching and leaving a comment as well!
      Please check out my other video tutorials and let me know what you think about them
      ua-cam.com/users/OnlineTrainingforEveryonesearch?query=psychometric
      Many other great videos are also available here ua-cam.com/users/OnlineTrainingforEveryone
      Lots of helpful information in each and every one of them. You can also check out my website for extra materials that would help you to get ready for an interview. www.howtoanalyzedata.net/resources/
      Please let me know if it was helpful and good luck in your journey!

    • @unknown-nd1tm
      @unknown-nd1tm 2 роки тому

      Explaination

  • @211Lashes-Yass
    @211Lashes-Yass Рік тому +2

    is the answer 100%?

  • @benedictsouza
    @benedictsouza Місяць тому +1

    P2 is 50% longer than P1

  • @PCTVComfortVision
    @PCTVComfortVision 4 місяці тому

    150% 12÷8 = 1.5 therefore 150%

  • @christopherjohn9869
    @christopherjohn9869 6 місяців тому

    THIS is definitely not Man Woman Camera TV, the first question would have sent ME to the old folks home!

  • @ibrahim_youssef_13.12
    @ibrahim_youssef_13.12 5 місяців тому

    If project2 vs project1 = 150% but if project1 vs project2 ? it seems the answer is 75%

  • @beckyray522
    @beckyray522 Рік тому +2

    50 percent

    • @OnlineTrainingforEveryone
      @OnlineTrainingforEveryone  Рік тому +1

      Thank you for watching and leaving a comment with your answer as well. Please check out my newest videos and let me know what you think
      ua-cam.com/users/OnlineTrainingforEveryone
      Lots of great and helpful information in each and every one of them.
      You can also check out my website for extra materials that would help you to get ready for an interview.
      www.howtoanalyzedata.net/resources/
      Please let me know if it was helpful and good luck in your journey!

  • @jacqui8159
    @jacqui8159 10 місяців тому

    40% value = 20; diff. = 4; Ave = 10 = .4 x 100 = 40% ?

  • @fatma54321
    @fatma54321 9 місяців тому

    is it 50%

  • @RasinRadwin
    @RasinRadwin 3 місяці тому +1

    To solve this, we need to calculate how much longer Project 2 (12 hours) takes compared to Project 1 (8 hours) in percentage terms.
    Step 1: Find the difference in hours
    Project 2 takes 12 hours, and Project 1 takes 8 hours. So, the difference in time is:
    12 \, \text{hours} - 8 \, \text{hours} = 4 \, \text{hours}
    Step 2: Calculate the percentage difference relative to Project 1
    The percentage difference is calculated as:
    \left(\frac{\text{Difference in hours}}{\text{Project 1 hours}}
    ight) \times 100 = \left(\frac{4}{8}
    ight) \times 100 = 50\%
    So, Project 2 takes 50% longer than Project 1.
    The correct answer is B) 50%.

  • @kentalwar7615
    @kentalwar7615 6 місяців тому +1

    150

  • @maryannetruscello7326
    @maryannetruscello7326 6 місяців тому

    20%

  • @gopalkrishan7097
    @gopalkrishan7097 Рік тому

    B-50%

  • @santibaby171
    @santibaby171 Місяць тому

    I did 44*44 =1,936/30.25 = 64😅

  • @riptrainer
    @riptrainer Місяць тому

    The answer to Q3 is 8hours ÷ 12hours % : D 150%.

    • @lostconciousness4255
      @lostconciousness4255 6 днів тому

      lol, 8/12 is not 150, it equals 33 and even still it's asking for "longer" not total amount of time needed compared to proj 1.

  • @lostconciousness4255
    @lostconciousness4255 6 днів тому

    3:40 oh hell no.

  • @johnrichardcleland4493
    @johnrichardcleland4493 6 місяців тому

    50%

  • @Marl-tr7kv
    @Marl-tr7kv 4 місяці тому

    150%

  • @VeerEditz13
    @VeerEditz13 10 місяців тому

    50 % project 1 vs project 2

  • @tedswanson7751
    @tedswanson7751 7 місяців тому

    50%

  • @nalinikashyap6268
    @nalinikashyap6268 9 місяців тому +1

    150%

  • @thecodgamer238
    @thecodgamer238 6 місяців тому

    4%

  • @rashidatidowu-dj6jp
    @rashidatidowu-dj6jp Рік тому

    50%

  • @thatguyidk123
    @thatguyidk123 11 місяців тому

    48%

  • @feliciankovacs
    @feliciankovacs 7 місяців тому

    Most drivers on the road now they would fail this test

  • @AlexHyde-t7l
    @AlexHyde-t7l Рік тому

    4%

  • @stewardfulford
    @stewardfulford Рік тому +1

    50 per cent

  • @javeria_zone
    @javeria_zone Місяць тому

    There were 14 triangles

  • @javedchaudry4520
    @javedchaudry4520 Рік тому

    50%

  • @effingham28
    @effingham28 3 місяці тому

    50

  • @rosssiemms7101
    @rosssiemms7101 Рік тому +1

    B

  • @laurateachfx
    @laurateachfx 9 місяців тому

    24+28+ 3= 55

  • @imranumar2147
    @imranumar2147 Рік тому

    12

  • @dhananjaykumar-u2l9f
    @dhananjaykumar-u2l9f Рік тому

    50

  • @janbrowning3278
    @janbrowning3278 8 місяців тому

    150

  • @wizbreezy_saint
    @wizbreezy_saint 5 місяців тому

    100

  • @imranumar2147
    @imranumar2147 Рік тому

    8

  • @imranumar2147
    @imranumar2147 Рік тому

    Aqua

  • @imranumar2147
    @imranumar2147 Рік тому

    64

  • @VenkateshaHanchinal
    @VenkateshaHanchinal 2 роки тому +4

    Answer is 150 %

  • @imranumar2147
    @imranumar2147 Рік тому +2

    zero

  • @imranumar2147
    @imranumar2147 Рік тому

    a

  • @BettyDrebot
    @BettyDrebot Місяць тому

    b

  • @bardiolive5632
    @bardiolive5632 Рік тому

    Whats the correct answer here??? Some say 50, some say 150???
    Pls what's d correct answer?

    • @Vayanovic
      @Vayanovic Рік тому

      its 50 percent faster than 12 hours. If it was 8 vs 16 hours, its half the time taken, which is also 100% faster cuz its double the time. 200% is double - 100% = 100% if it was 16v8 hours. But for this question since it is 8 vs 12, it is 4 hours faster. 4 hours is 50% of the time taken for Project 1 which is the reference, so Project 1 is 50 percent faster!

  • @sunflowerzelda45
    @sunflowerzelda45 Рік тому

    b

  • @teshomedemessie6877
    @teshomedemessie6877 5 місяців тому

    d

  • @kuralaykazybekova8278
    @kuralaykazybekova8278 Рік тому +1

    D?

  • @portandtechnews
    @portandtechnews Місяць тому

    0

  • @vbyssey100
    @vbyssey100 3 місяці тому

    Nonsense - 😁

  • @markgomez3688
    @markgomez3688 11 місяців тому

    Bolloxks, 24+28+3=52+3=55. you said that first but you add 3 two times to get 55. But you show 4+5+1=10 you only add 1 one time... makes no sense no pattern nothing except random addition....

  • @4UncleRichards
    @4UncleRichards Рік тому

    His voice drives me nuts.

  • @stretch1807
    @stretch1807 7 місяців тому

    holy shit this is ridiculous

  • @proudcanadian200
    @proudcanadian200 День тому

    What has this bullshit got to do with me staying a capable driver. Just another idiot's way of driving us nuts while driving.

  • @TaraKelly-t2f
    @TaraKelly-t2f 2 місяці тому

    Tooo slow....

  • @4744npvd
    @4744npvd 3 місяці тому

    Total garbage 😅

  • @nicolasjames10
    @nicolasjames10 3 місяці тому

    150%

  • @sangitavij5319
    @sangitavij5319 4 місяці тому

    50%

  • @janiekcarney5482
    @janiekcarney5482 10 місяців тому

    4%

  • @asimasaha4525
    @asimasaha4525 Рік тому

    50%

  • @gustavtheodor
    @gustavtheodor 7 місяців тому

    50

  • @imranumar2147
    @imranumar2147 Рік тому

    a

  • @hitendrachopra4627
    @hitendrachopra4627 8 місяців тому

    150%

  • @jankouba1107
    @jankouba1107 4 місяці тому

    50%

  • @OwenYee-k1b
    @OwenYee-k1b Рік тому

    40%

  • @MarilynGray-fe1jz
    @MarilynGray-fe1jz 9 місяців тому

    4%

  • @leslieram6544
    @leslieram6544 7 місяців тому

    150%

  • @gustavtheodor
    @gustavtheodor 7 місяців тому

    50

  • @kenphillips2973
    @kenphillips2973 3 місяці тому

    50%

  • @shivimalviya-m7n
    @shivimalviya-m7n Рік тому

    50%

  • @JaneCraig-y7f
    @JaneCraig-y7f 3 місяці тому

    50%

  • @dharmeshsarwan7196
    @dharmeshsarwan7196 Рік тому

    50%