January me update denge dear, Road ki tarah railway project me as such koi bada change hota nahi hai dikhane k lie, Islie main thoda delay kar raha hu, So that aapko dekhne me bhi acha lage aur mujhe dikhane me.
It is not a local road it is SH 23 of Chhattisgarh which is connecting Rajnandgaon to Dhamtari Nagri upto borai ghutkel (orrissa border) it is an important road which is used for construction of this expressway , also it is bypass of keshkal ghat . Now it is in the worst condition due to heavy traffic and due to lack of attention.
Thank you for the clarification. I referred to it as a local road because it wasn’t marked on Google Maps. During my recent trip to Odisha, I noticed that this road wasn’t being used as a bypass; there’s a different road serving that purpose. However, I completely agree with you-it’s indeed in terrible condition now. Interestingly, the section where the interchange was supposed to be built is relatively well-maintained.
@@LifeOnWheelsBSP it is marked in Mile stone SH23. Machli kottali bhatti road is used for bypass to kanker for busses but all other heavy vehicles were passing through it , that's why It is in the worst condition.
Thank you very much sir for uploading the information of package 2 very quickly
So nice of you
Nice coverage once again Mr Life on Wheels. Keep it up. Eagerly waiting for completion of this expressway. 👍
Thank you so much for your appreciation! 🙏
Apka sabhi video achchhi hai sir thanks 👍
Thank you dear..
Good covering by you & Drone
Thanks
Thank you too!
Thank you sir for covering this package 😊
Welcome dear, Thanx for watching.
ACHI JANKARI SIR JII
Thank You ☺️ Dear
Amazing view in 60fps, many thanks!!
Many thanks!
Aap ye nahi bole nahi rahe hai road ki quality kaisa hai
sir pls cover package 3 and keshkal tunnel
Sure brother. We will cover this as well in coming days
Nice sir ji apana hi area hai
For video thanku ❤🎉
Welcome Brother..
@@mrappu9399 कहा से हो मैं भी उसी एरिया का हूं
Super ❤
Thanks for watching 🙏
Nice update sir
Thanks
रायपुर धमतरी रेलवे लाइन पर अगला अपडेट कब दे रहे हैं
January me update denge dear, Road ki tarah railway project me as such koi bada change hota nahi hai dikhane k lie, Islie main thoda delay kar raha hu, So that aapko dekhne me bhi acha lage aur mujhe dikhane me.
Sabhi indian infrastructure work free of cost mein complete time to time hone chahiye, yeh janta ki guarantee hai, unki guarantee hai shaasan
Please, dhamtari railway station dikha 2 na
January me dikhaenge brother.
Super 👍❤❤
Thank you..
Make Koraput tunnel video
I will try, I am not sure if i will get the permission to enter the tunnel.
Nice pic sir
Thanks
dhamtari interchange se tunal tak ka vidieo uplod kare sir
Jarur brother. Jaldi visit karenge
Sir Raipur dhanbad economic corridor video urga to pathalgaon and bilaspur to urga
Sure i will try to cover this as soon as possible.
Urga to pathalgaon ka v banao
Try karunga brother..Jan me visit karunga may be.
how is the Road quality .Is it same at every package?
It looks like the same in every package. We will figure out after some time, Although ride quality is awesome.
It is not a local road it is SH 23 of Chhattisgarh which is connecting Rajnandgaon to Dhamtari Nagri upto borai ghutkel (orrissa border) it is an important road which is used for construction of this expressway , also it is bypass of keshkal ghat . Now it is in the worst condition due to heavy traffic and due to lack of attention.
Thank you for the clarification. I referred to it as a local road because it wasn’t marked on Google Maps. During my recent trip to Odisha, I noticed that this road wasn’t being used as a bypass; there’s a different road serving that purpose. However, I completely agree with you-it’s indeed in terrible condition now. Interestingly, the section where the interchange was supposed to be built is relatively well-maintained.
@@LifeOnWheelsBSP it is marked in Mile stone SH23. Machli kottali bhatti road is used for bypass to kanker for busses but all other heavy vehicles were passing through it , that's why It is in the worst condition.
@ Yeah 👍
👍
बहुत बढ़िया पर दूधावा इंटर चेंज कांकेर को नहीं दिखाए भैय्या
Ha brother, Next time visit karunga to baki area bhi dikhaunga brother.
@@LifeOnWheelsBSP okk
Nice 👌👌👌♥️
Thanks 🤗
बहुत अच्छी काँटेंट है सर जी आपके वीडियो का इंतजार रहता है
@ Thank You ☺️ Dear
ADVANCE HAPPY NEW YEAR SIR 2025
Raigarh me kab banega aise road pata nahi
Bhaiya dhamtari railway bhi
Jarur brother. Jan me dikhaenge
Sir please make videos on dhamtari railway station
Sure Brother, Puri koshish hai Jan me Update dekhne ko milega Dhamtari railway Station ka.
rajim se abhanpur tk abhi ohe cable ka kaam chal rha h
Acha..
Please Make a Video Package OD 08 PLEASE 🥺
Sure...I will try
Pura complete kab hga?
2026 end tak possible hai
@@LifeOnWheelsBSP ok
Road का पूर्ण होने का कब तक हैं,,,,,,,?
Waise deadline to 2025 ka hai, But Pura expressway ready hone me 2 saal ka aur time lagega. Dhamtari ka area ready ho jaega 2025 me.
Kab tak complete hoga sirji
2026 me ummid kar sakte hain
Sir ye kam kab tak pura hoga
2026 me Ummid kar sakte hai pura ban ke ready ho jaega.
Which company is working on this?
Dilip Buildcon Ltd
2025 my plan मानसून सीजन में इस Expressway से Vishakhapatnam जाने का है
Awesome 😎
Dhamtari relve update
Sure, Jan me update karunga.
Road to hona chahiye,lekin ye jo road he hamare desh ke jungle our janber ko kuch nukshan hoga to me pehle khoda rahunga aur unka santi se rehne do.
Sahi baat hai..
पूरा छत्तीसगढ़ बर्बाद कर दिये रे पूरा खेत खार भर्री बर्बाद कर दिस रे 😢😢😢😢😢
2004 मा गांव गांव में सड़क बनिस तब छत्तीसगढ़ आगे बढ़ीस, ये सड़क हर अऊ आगे बढ़ाही ।