SAP MM-: Subcontracting (Buying material from vendor and giving to same vendor for Subcontracting )

Поділитися
Вставка
  • Опубліковано 31 гру 2024

КОМЕНТАРІ • 30

  • @govindas9726
    @govindas9726 2 роки тому

    Very well explain.....RAMA..... I ALWAYS WATCH UR VIDEOS ......

  • @amareshhiremath2643
    @amareshhiremath2643 3 роки тому +1

    I tried to do this scenario many times sometimes I'm getting confused when I saw this I'm cleared thank you for explained this scenario Sir☺️

  • @prasannagowda9741
    @prasannagowda9741 3 місяці тому +1

    Hi ..
    Thanks for the Video. I have a question here. If both the Component materials are from vendor, then what is the configuration we need to do in BOM and PO ?

  • @MuneesMeenaBLR
    @MuneesMeenaBLR 4 роки тому +2

    Well explained thank you:)

  • @PrasadH-r1p
    @PrasadH-r1p 10 місяців тому

    Hii very good explaining I want to know what are the accounting entries that will trigger in this type of subcontracting process

  • @aishwaryawagh1751
    @aishwaryawagh1751 3 роки тому +2

    thank you for the explanation . when i am trying to add another material in PO screen without item category, it is shwoing me an error item category blank not allowed for doc type . what should i do…

    • @StudyuuuSAP-MM-EWM
      @StudyuuuSAP-MM-EWM  3 роки тому

      You have po doc type configuration - Allowded item categories , please maintain blank there (Which means standard) then it will allow
      Note- kindly share the videos in your known platform to reach my content more people

  • @gopinathr.8506
    @gopinathr.8506 2 роки тому +1

    Thank you for this useful video sir.. I have one question, how the second line item will be zero.. because that is the raw material which we consumer by the vendor.. if we do GR for it.. how it will get zero in our storage..

    • @StudyuuuSAP-MM-EWM
      @StudyuuuSAP-MM-EWM  2 роки тому

      GR because...2nd line delivered address is vendor address
      That's y

  • @praveenshetty3193
    @praveenshetty3193 2 роки тому +1

    How to do subcontracting process where vendor provide one material and one material will be provided by us how to match this situation in sap

    • @praveenshetty3193
      @praveenshetty3193 2 роки тому

      *map

    • @StudyuuuSAP-MM-EWM
      @StudyuuuSAP-MM-EWM  2 роки тому

      Input 2 main lines items that you are sending and delivery address is vendor
      1 line for main material
      Other for child component

  • @biswarupdas7297
    @biswarupdas7297 4 роки тому +1

    Sir I want to learn from you..👍👍

  • @saratchandra5082
    @saratchandra5082 3 роки тому

    Hi, can you please make a video on support tickets which are critical tickets in real time scenario

    • @StudyuuuSAP-MM-EWM
      @StudyuuuSAP-MM-EWM  3 роки тому

      I'm already providing everything in studyuuu drive, please contact me at studyuuusapmm@gmail.com, if you are interested to take drive

  • @ambreshabbigeri7566
    @ambreshabbigeri7566 2 роки тому +1

    Sir here gross price should be maintained for both 1469(hydraulic)and 278(spring) right but here it fletched only for spring,what about 1469(hydraulic) material?

  • @diptimanbhattacharya9353
    @diptimanbhattacharya9353 4 роки тому +1

    Hi Rama,I have a requirement in subcontracting. We have 10 cm rod and want 4 pieces from that rod from sob contractor.
    Could you please let me know how to map this in system?
    Best regards
    Diptiman

  • @sagrdhoke6747
    @sagrdhoke6747 4 роки тому +1

    Hello sir
    After joing will i be getting all document right from start topic wise

    • @StudyuuuSAP-MM-EWM
      @StudyuuuSAP-MM-EWM  4 роки тому

      Send email - Stuyduuusapmm@gmail.com
      I’ll explain the procedure

  • @sachinjadhav1218
    @sachinjadhav1218 3 роки тому

    When creating BOM ,The Scrap number you mention there ,but in creation PR In BoM tab it's scrap material number not shown there ....why

  • @ravikiran1212
    @ravikiran1212 2 роки тому +1

    Hi sir, I have one question if I want to procure one child material from another vendor and give it sub-con vendor, how can i achieve it in SAP?

    • @nareshgoud6431
      @nareshgoud6431 Рік тому

      you just do it seperate PO for child material and then do separate po for sub contractng vendor

  • @biswarupdas7297
    @biswarupdas7297 4 роки тому +1

    How can I discuss with you ?