How the Process of Building Construction Starts | Steps of Building Construction || By CivilGuruji
Вставка
- Опубліковано 6 бер 2021
- #civilguruji #civilengineerstraininginstitute #practicalsitetraining
How the Process of Building Construction Starts | Steps of Building Construction
Don't forget to Like Share & to Subscribe the channel
Practical Training course & Fee Detail:- www.civilguruji.com/s/store/c...
Call For all Details:- 9111001234
In this video Er. Akash Bohare, Corporate Trainer of Civil Guruji is Explaining How the Process of Building Construction Starts | Steps of Building Construction
How do you calculate excavation for foundation?
1. FOUNDATION EXCAVATION ESTIMATE (cont.) Step 1: Divide the fill area into small segments. Note: The width and length of the fill area are calculated by deducting the width and length of the building area by the width of foundation wall.
How long does it take to dig 1m3?
One day (8 hours) in good weather. If you have to move it up, because you're lower than one meter in depth, add half the time per each 2 meters down or add half a person.
This How to calculate earth work excavation for foundation article covers the works specification of earthwork in excavation in all kinds of soils including murrum, hard murrum, soft rock (without blasting, hard rock (without blasting), rock (with blasting).
The following Bureau of Indian Standard Code shall be applicable. In all cases, for the earth work the latest revision of the codes shall be referred to.
Safety code for blasting and related drilling operations IS - 4081
Method of measurement of building works IS - 1200
Safety code for excavation work IS - 3764
Code of practice for measurement of Civil Engineering works IS - 3385
IS - 2720 Part II Determination of moisture content.
Determination of moisture content dry density relation using light compaction.
Determination of dry density of soils, in-place by the sand replacement method.
Determination of dry density of soils, in-place, by the core cutter method.
Drawings for earth work excavation for foundation
Drawings for earth work excavation for foundation should contain all necessary drawings showing the areas to be excavated, filled, sequence of priorities etc. Engineer at site shall follow strictly such drawings.
What are the processes of excavation in construction?
1. Client/Contractor/Builder shall obtain valid royalty for soil from concern government department before starting of excavation and
2. Client/Contractor/Builder shall carry out the survey of the site before excavation and set properly lines and establish levels for various works such as earthwork in excavation for levelling, basement, foundations, plinth filling, roads, drains, cable trenches, pipelines etc. Such survey shall be carried out by taking accurate cross sections of the area perpendicular to establish reference/grid lines at 5 m intervals or nearer as determined by site Engineer based on ground profile. These shall be checked by Engineer and thereafter properly recorded.
3. The area to be excavated/ filled shall be cleared of fences, trees, plants, logs, slumps, bush, vegetation’s, rubbish slush etc. and other objectionable matter. If any roots or stumps of trees are found during excavation, they shall also be removed. The material so removed shall be burnt or disposed of. Where earth fill is intended, the area shall be stripped of all loose/soft patches, top soil containing deleterious matter/materials before fill commences.
How to repair cracks in concrete Surfaces| Concrete Crack Repair Guide
Different ways of earth work excavation for foundation. - Наука та технологія
sir you are great person of civil society
Arun ji thank you for the compliment. Keep learning ang keep supporting Civil guruji .For any quires contact us in 9111001234
Thank u very much
Great video .
We want more videos like these
Thanks for your valuable knowledge
Sandeep ji most welcome .CIVIL GURUJI is always there to help you. Keep learning and keep supporting us . For further discription contact us in9111001234
Excellent job! Akash Bhai, I am USA based Pakistani and I really like your way of teaching especially, I like the way you speak Urdu and you also sound like a very knowledgeable construction and design professional so keep up the good work Bro! Thanks a lot for such a great upload....peace:)
He speaking hindi not urdu😂😂
Very good sir
Respected Sir your way of teaching is osm plz sir open a branch of jharkhand
Haider ji thankyou so much for your appreciation, and we are very glad to know that you are waiting to learn and join us , but as you know that opening a new branch is time taking so it it will take a time. We have our 4 branches BHOPAL , DELHI , NAGPUR AND LUCKNOW. For further description contact us in 9111001234.
House construction ki full playlist kha milegi sir
Sir layout pe full video bnay plz
Hello Ehtesham ji bikul hum layout per video lekar jaldi You Tube mai aayenge .
Sir UA-cam pe nhi la sakte to app men corporate course men add kar den plz sir q ki mai offline training nhi kar paunga sir
Sir centre line layout aap hi kray plz
Hello Sir bikul aapke request ko pui karne ki koshish jarur rahegi.
Sr jo person course purches nahi kar skta usko bhi, kuch help kara dijiye plzz
sir black kottan soil ho to kya karna chahiye
Dayal ji black kottan soil ko replace karna chiye sand ya muroom k saath. Keep learning and keep supporting us.
By english
Watching video on 2x
Pushpendra sir lay out krva rahe h kya
It's Civil Guruji Corporate Office Construction work.
Kitna fee lagta hai
Kamil ji ,course or uski fees ki jankari k liye call kare 9111001234
Sir layout samajh nahi aaya
Prerna ji aap humare dought session join kare uspe aapko clearly samjhya jayega or detail mai jankari k liye call kare 9111001234.