MEP work in MIVAN shuttering

Поділитися
Вставка
  • Опубліковано 6 вер 2024
  • About This Video Content,
    In this video Er. Narendra Patle explained about
    MEP (Mechanical, Electrical, and Plumbing) work in Mivan shuttering refers to the installation of mechanical, electrical, and plumbing systems within a building that is constructed using the Mivan shuttering technique. Mivan is a popular formwork system used in the construction industry, particularly for high-rise buildings, residential complexes, and commercial structures. It is known for its efficiency, speed, and cost-effectiveness.
    #mivan #mivanshutteringmep
    Here's how MEP work is typically carried out in Mivan shuttering construction:
    Planning and Coordination: Before any construction work begins, detailed planning and coordination of MEP systems are crucial. Architects, structural engineers, and MEP engineers work together to design the layout of electrical, plumbing, HVAC (Heating, Ventilation, and Air Conditioning), and other systems.
    Embedment of MEP Fixtures: During the Mivan shuttering process, openings and recesses are created in the formwork to accommodate MEP fixtures such as electrical conduits, plumbing pipes, HVAC ducts, and junction boxes. These fixtures are securely positioned within the formwork to ensure they align with the building's design.
    Formwork Installation: Mivan formwork panels are erected to create the structure's walls, slabs, and other elements. Care must be taken to ensure that MEP fixtures are correctly aligned with the formwork design.
    Concrete Pouring: Once the formwork is in place, concrete is poured into the shuttering system. During this stage, MEP professionals must ensure that the embedded fixtures remain in their designated positions and are not displaced by the concrete flow.
    Post-Concrete Work: After the concrete has cured, the formwork is removed, revealing the structure. At this point, MEP work continues with the installation of electrical wiring, plumbing pipes, HVAC systems, fire protection systems, and any other necessary components.
    Testing and Commissioning: After MEP systems are installed, they are thoroughly tested and commissioned to ensure they function correctly and meet safety and regulatory standards.
    Finishing Work: Once MEP systems are confirmed to be operational, finishing work such as plastering, painting, and interior fittings can proceed.
    ===================================================================
    Download all Courses free ( BBS Excel Sheet / Drawing / Useful pdf )
    (Note: Videos and documents will get update daily, so stay tuned for more information )
    docs.google.co...
    Download file in pdf
    docs.google.co...
    Please Subscribe: / civilconstruct
    ===================================================================
    Visit our Channel for Civil Engineering Knowledge:
    / dndconstruction
    Visit our Channel for lifestyle & Fitness
    / @dineshlifestyle
    Follow us on INSTAGRAM: www.instagram....
    Join us on Telegram: t.me/civil_con...
    Follow us on FACEBOOK: / 102249415176766
    ===================================================================
    mivan shuttering, mivan construction
    mivan technology,mivan techniques,
    mivan technologies,mivan construction pune
    mivan construction gurgaon, mivan shuttering plumbing,
    mivan shuttering mep, aluminum shuttering, aluminum formwork,mivan formwork,
    mfe
    ===================================================================
    Disclaimer - This video is for educational purpose only. Copyright
    Disclaimer Under Section 107 of the Copyright Act 1976, allowance is
    made for "fair use" for purposes such as criticism, comment, news
    reporting, teaching, scholarship, and research. Fair use is a use
    permitted by copyright statute that might otherwise be infringing.
    Non-profit, educational or personal use tips the balance in favor of
    fair use .

КОМЕНТАРІ •