Example of risk responses in a PRINCE2® project

Поділитися
Вставка
  • Опубліковано 27 жов 2024

КОМЕНТАРІ • 2

  • @saracora
    @saracora 3 роки тому +1

    Hello Frank, would you be so kind please, to point out which of the risk responses does not produce residual risk for both opportunities/threats?

    • @frankturley5202
      @frankturley5202 3 роки тому +2

      Residual risk can be always present but to Avoid and Transfer would be two options to choose.