KINGLINE PRESS OFFICE CONSTRUCTION - Kingline Tower Water Well

Поділитися
Вставка
  • Опубліковано 15 жов 2024
  • Everyone had put in their best. Kingline Tower was taking shape and every wall’s dimension set. The only direction was up. Up until it was above us, further, higher and all other synonyms of greater.
    Several times, I had constructed bungalows but this Kingline Tower (with a plan of going up to 4 floors) introduced both new challenges and lessons. I will be sharing the key aspects that have made this a success so far
    Key Aspect 1 - Water
    Before the construction, we made a steady supply of water. We dug a well. Simon (Pastor) and his team at Extra Blessings Company did a really good job. He came to site, surveyed and provided a quotation that covered the whole process right from ground excavation to pump installation. They dug the well and within a week, at 40 feet below the ground, we got the thousands of liters that have benefited the Tower construction and neighborhood consumption.
    Won’t say “inbox for prices” because his packages (including materials and labour) range between 2.5-5M and Simon’s numbers are 0750818167, 0784332441.
    There’s no foreseeable limit to the amount of water needed. At some soil backfilling stage, you just put the pipe to the ground and let it run. Same happens to drying walls, concrete, etc. That’s what makes the well worth the investment.