Sir ji main bhi abhi contractor ka kaam suru Kiya hu aur koi kaam milta hai to bolte hai ki foundation ka aur plinth beam tak ka alag nahi denge slab magermant me hi aata hai aysa bolte hai ab kon contractor aysa kaam karke deta hai ayse logo ko kayse samjhaye ki
Namastey sir hamne gher banana shuru kardiya hai slad tak kaam hogaya hai ab zyada paisa nahi hai ki ham gher banaiye for the next slab koi upaye bataiye ki kam Kharche mein ground floor our 1 st floor ka gher kaisey banaiye 43'×32' for M20 grade koibhi ek video banao our kam Kharche gher bane
Sir 3 store building kelia column and beam me kitna mm ka rod lagna chahi he and stirrup kitna mm distance pe rehna chahi he, soil ka condition achha he hard nehi he ki soft nehi he medium he
Sir please please video baniye की. Labour rate के समय हम logo ko sara material dena padta hai. Toh sir woh सारा material ka list बता dijeye na please, aur wow सब kuch jo hunko dena होगा ya karna hoga
😀😀मेरे कांट्रेक्टर ने Rs per 200 sq रेट लिया है । 1260 sq feet के 2,52,000 रुपए लिए है। Including 18 columns+walls rooms+plaster+ floor leveling 👍👍Delhi
bhai mera slab ki thicknes 6" se 6.5" hai or spacing main bar 6" or top 7" hai or sariya 10mm or 8mm ka hai to koi problem ho sakta hai in future please reply
हमारे यहाँ से रेट बहुत ज्यादा है सर जगह के हिसाब से हो सकता है सायद. और ऊपर का ज्यादा क्यों लगता है जबकि फाउंडेशन का काम नई होगा प्लीथ बीम तक उनका खर्चा नई होता 1st फ्लोर मे
मेरा घर बन रहा है 180 रुपया पर स्क्वायर फीट है, जिसमे जमीन से लेकर कॉलम berck वर्क,शतरीग,ढलाई, प्लास्टर, फर्श प्लास्टर,आलमारी, सीढ़ी, सब करके देते हैं
Mera ghar bana hai 1950 sq fit me to kitna Labour kharch hoga sir
जोड़ाई और पलास्टर का रेट किया होगा
Is me thekdar lebar aur mistari ko masduri kitni dega humre yaha 800 Mistari 500 rupe lebar ke hai to hum ret lete hai 250 se 280 tak
Sir hidden beam latak beam aur column ka naap lena sikhaya
इसमें अगर छज्जा निकालें तो वो भी slab me count akrenge kya ?
यह शहर का रेट है
गांव में कम रेट मिलता है फाउंडेशन और स्लैब 150 में कर लेते है
Sir 55 gaj L type 3 floor banana hai toh kitna rate hai 2022 ka... please tell
Hello
Sir my name Dhanesh Kumar Bharti civil engineering cours kiye 2022 me lout have hai., mai aap se kuchhe jankari chahte hai
Varanasi me aap operate karate hai kya?
Sir iron work means sariya ka kesay hoga.
Sir ji main bhi abhi contractor ka kaam suru Kiya hu aur koi kaam milta hai to bolte hai ki foundation ka aur plinth beam tak ka alag nahi denge slab magermant me hi aata hai aysa bolte hai ab kon contractor aysa kaam karke deta hai ayse logo ko kayse samjhaye ki
Sir kanpur me sabse sasta kaam hota woh bhi 150 square fit only slape napte hi
नमस्ते सर हमे ये बताये कि मीटी खुदाई का भी रेट इसी मे है या अलग से है
Parapet wall ya ghr ka boundry ka sq ft kese napna h
Foundation ka jo rate he ohh column and brick work bhi karega plinth beam tak, ya phir sirf foundation gada karneka 100 per sqf lega.
please tell wht rate to be fixed with all work
What is difference between foundation and basement ? I think there is no difference between them.
Ek with material ka bhi video bnaiye
Hello sir
Namastey sir hamne gher banana shuru kardiya hai slad tak kaam hogaya hai ab zyada paisa nahi hai ki ham gher banaiye for the next slab koi upaye bataiye ki kam Kharche mein ground floor our 1 st floor ka gher kaisey banaiye 43'×32' for M20 grade koibhi ek video banao our kam Kharche gher bane
Thanks
Sir agreement mai kiya kiya hona chahiye..us per bhi video banaye
Super explain
Square feet kaise napenge, es par ek video banaeye 🙏
Ham are yaha mistri rate=550 aur levar rate 350
900 sq feet me घर बनाना चाहता हूं,,,,नए ज़माने के तरह,,,kamse kam बजेट कितना लगेगा,,,,,थोडा कष्ट दे रहा माफी,,,,भाई
Sir 3 store building kelia column and beam me kitna mm ka rod lagna chahi he and stirrup kitna mm distance pe rehna chahi he, soil ka condition achha he hard nehi he ki soft nehi he medium he
Good video for engineers
Sir Tata discon tmt sarya Kya price hai aour chat dhalai ke liye Kon sa sarya cement achcha hoga please reply
भैय्या बहोत बढ़िया samzaya, मैं तो महाराष्ट्र का hu, मगर संतोष हुआ,,,,,,
Thanks for working !
👍
Aap rat kam bata rahe ho peyarapet ka
Thank you so much sir
What type of service your firm is providing sir.only plan or full construction
Plan and construction both.
Hello
Bangalore mein koi Contractor ho to batana
Sir...,
आपने जो रेट के बारेंमे कहा वो रेट महाराष्ट्र में भी है...??
Pata kijiye
Congratulation sir aap 1 million ke bhaut pass hoo excellent
Thanks
Plaster me design ka cost kitna hoga
Sir namaskar
I hope that you will make very soon.
दीपक जी लखनऊ में घर बनाने का रेट बताइए प्लीज
Sir ji aapki har videos dekhta hun... bahot Achcha lagta hai....
40x40=1600 sq ft GF + FF SF ka commercial plan bataiye jisme north and west mai road hai
Asking as above
Back side of shops residential House be constructed leaving 5 feet towards south. Staire case be north side
FF and SF be for Bank office purpose
Plan bataye
Sir square feet ka ret kaise fix karte hain ki contractor 100 Rs lega ya 220Rs lega
20 by 25 Feet chhat dhalyai me kitna cost aayegaa
Sir, Indiamart se cement aur tmt bar order krna thik rhega, kyuki uspar sasta padta hai. plz reply
mujhe bhi yeh janna h
All Construction rate for building
Sir please please video baniye की. Labour rate के समय हम logo ko sara material dena padta hai. Toh sir woh सारा material ka list बता dijeye na please, aur wow सब kuch jo hunko dena होगा ya karna hoga
Sir, with material 1200 sq ft ka contractor rate bataiye .
Sir mai apke jawab ka intejar kar raha hoon
Where are you wok
@@successconstruction gaon me
Sir 30/40 ke plot ke side wall ka Amount kitana hoga
😀😀मेरे कांट्रेक्टर ने Rs per 200 sq रेट लिया है । 1260 sq feet के 2,52,000 रुपए लिए है। Including 18 columns+walls rooms+plaster+ floor leveling 👍👍Delhi
Bilkul sahi liye hai bhai sahab
Chat per boundary karne ka alag se liya he ki usinme.include hein
@@anand6143 alag se liye hai boundary walls k Rs. 50 per sqft feet.
मेरे यहां 2021 में 170 था लेकिन अब 190 रेट हो गया है सीढ़ी प्लास्टर सब include है सिर्फ टैंक का पैसा अलग से
Sar kam karne ka saman Kiska rahega
Rod cement k price me aise hi
Aaag lga Diya hai....
April22 see toh
Maharashtra mai pura bill banakar usper algse 25%-50% lete hai, aur 1flor- 2flour ke hisabse saman upper pohchane ka hisab isme hota hai.
bhai mera slab ki thicknes 6" se 6.5" hai or spacing main bar 6" or top 7" hai or sariya 10mm or 8mm ka hai to koi problem ho sakta hai in future please reply
8 mm bar nhi dena tha aapko only 10 mm
Aisa charge lgega toh
Ghr bna hi nhi payegnge Bhai...
Khoooon bechna pd jayega....
Contractor ka rate maximum
Bta rhe.....
Jh area me
हमारे यहाँ से रेट बहुत ज्यादा है सर जगह के हिसाब से हो सकता है सायद.
और ऊपर का ज्यादा क्यों लगता है जबकि फाउंडेशन का काम नई होगा प्लीथ बीम तक उनका खर्चा नई होता 1st फ्लोर मे
Sir 🙏 इंतजार है सर..
Sir kaam ke liye sampark kare contract h ham sir
Bahut jiyada aur galat ret hai
bhai pdf upload kariye download ke liye plsss
Mera 200 per sq ft le raha hai. Aur chat ka area ke hiasb se lega bol. West Bengal mai. Thik le raha hai?
Jh me 160-200
Sahi hai thik le raha hai
Sir Vastu Shastra mana chaiye ya nahi.
Your choice
150 se 180 sqrt lete ab log.. Koi noo 100 k hisab se charge krta h.....
@ 5:44 pe kaisi awaaz nikli hai bhai
Sir ji ka gale ka.
20×75=1500 sqft GF (complete parking area)+FF+SF east facing road plot , comercial complex map + plan , advice required .
Hello
Sir aapna nambar vejiye
Sir with materials Sqft contractor kitna Rs lega?
Bolne ke liye hi bs koi ni deta hai....bs 200 rs sqft me sab cahiye..
From jharkhand
Galat video banaksr partee ko mat jharkao
uttarakhand dehradun me construction karane ke liye contact kare construction contractor
No do apna
Kya rate hai
@@tenzinnyibum1676rate as par class A,B,C
Huh to batao b ka
Ha ji boliye
Nice explanation
नमस्ते सर हमे ये बताये कि मीटी खुदाई का काम इसी रेट मे है या अलग से
Hello sir
Hello