- Probably the most difficult construction site in Germany is 70 kilometers from Sylt. The sea is up to 32 meters deep and the waves are high even in good weather. A wind park with 80 turbines is being built here under harsh conditions, which will generate climate-friendly electricity for a million people. A mammoth project that is hard to beat in terms of size and complexity. And things are progressing rapidly: specialists erect the almost 150-meter-high wind turbines within a day.
🚢 More documentaries about SHIPS • SHIPS - Documentaries
📺 Watch more documentaries • Full Documentaries
🔔 Subscribe our full documentary channel
/ @weltdocumentary
#windfarm #sea #documentary - Наука та технологія
🚢 More documentaries about SHIPS ua-cam.com/play/PL-5sURDcN_ZkegA8sIoWGaYZOKfdbcU7J.html
📺 Watch more documentaries ua-cam.com/play/PL-5sURDcN_Zl8hBqkvZ6uXFpP3t55HU9s.html
🔔 Subscribe our full documentary channel
ua-cam.com/channels/BAeFXaLV1ZqKqc-Uf3pKaA.html
incredible facinating awe
astounding
Facinatingawe
Stoic effort fasvcinating
amazing
I work on it and I can confirm that this is the most precise media produced according to the reality of this job.
Lucky bastard.😃🤝👏
I call it paid to play 😂@@flpcity9016
is quite good to see all these workers in action with a really fantastic goal.All producers and staff are really amazing in doing their tasks.thank you DW DOC for all this information and beautiful technology.
How much energy is consumed in the production and erection of these turbines? I'll tell you - MORE than they produce over their lifetime. If they produced MORE energy over their existence than they took to produce they would produce energy MORE cheaply than conventional energy production methods.
All this is a scam. It's a waste of energy
People have been pointing this out for 20 YEARS, but people just ignore it, because scams are lucrative.
It should be noted that this project is quite old. It was commissioned in 2014, ancient history in the off-shore wind power world. Turbines were 3.6MW each, about a third of the standard in 2020/21. Nevertheless, this documentary is very instructive and interesting.
Thanks for this interesting remark!
I was thinking the same thing. 66m towers are tiny for offshore wind. The turbines I work on are 13 years old, based onshore, and yet stand 14 meters taller than these
Indeed
@@joelrowbotham180 They are smaller than the current generation of WTG's, but offshore, the towers do not generally need to be as tall as onshore WTG's due to unimpeded wind across the sea compared to land where hills etc can interfere with wind quality. The main reason for taller towers nowadays offshore is due to the length of the blades - currently at 108m in length for the SG14 MW
Did that particular project pay itself off ? Is it still working???
Finally some good news
Stay safe the sky is the limit
Thank you for sharing your experiences. We are very grateful. You continue to do wonderful things.
This channel it's so addictive , i really love and enjoy every single documentary .... Amazing technology , thank you Welt for bringing us alone
I Love this extreme engineering , this is as good as it gets.
Also very nice to see how the Crew work and ships ammenaties.
What an interesting documentary. Thank you for showing everyone this. I am amazed! Great informative video. Thank you.
Thanks a ton.. for giving an opportunity to look inside the offshore WTG installation..
Danish/German cooperation is awesome
Totally agree with you.
but the designer is moroccan🇲🇦
Not when the southern most Danish wind turbines are paid to go offline during windy periods (by Germany), just to recieve the electricity produced by German wind turbines. Still a lot of law that have to be changed to really move forward. But generally I totally agree with you :)
Thank you for using METRIC so that the majority of the world's population can understand the weights, specifications and dimensions being discussed!
Errr, they are German, they ONLY do metric (just like the French ;-)
@@astranger448 Hence why I said 'Thank You'. There are so many producers on YT that still think imperial/american customary units are a thing and insist on using them exclusively or worse yet using both, making their videos clunky and cluttered
Liam Neeson is really nailing this narration!
This is the best video I’ve experienced on the construction of an off-shore wind farm - an excellent commentary 😃👌👌👌👌👏👏👏👏
Very well done video with excellent and meaningful narration. The discussion with the chef adds some "spice" to the video.
A really nice vessel to work on, the 3 vessels they have are great.
Very impressive these folks are very smart
Marvel of engineering, simply amazing transportation techniques
I just sat through a 5-minute ad on a wind turbine gearbox oil changing maintenance vehicle~ XD
I'm not sure why I didn't skip it~
Lmao, maybe you didn't notice the add start so you kept on watching then finally noticed it was an add once the time ran out lol. Happen once to me but now I can't wait for it to light up SKIP just cause I can't stand adds. Right away before the clip you are going to watch is better then 3+ times throughout whatever you trying to watch
I am amazed! Great informative video. Thank you
Impressive combination of thinking and doing, great to see.
Antonmursid🙏🙏🙏🙏🙏🇲🇨🇲🇨🇲🇨🇲🇨🇲🇨
Antonmursid🙏🙏🙏🙏🙏🇲🇨🇲🇨🇲🇨🇲🇨🇲🇨
Very interesting - Thanks for sharing.
Finally some good news.
Mike, been a boat nerd 70 years. Watched freighters on Belle Isle while fishing with my uncle. Moved to Mtns of NC and miss theDetroit River and my boats. Your filling a gap that has made life a bit nicer being able to watch the lift bridge and all different ships. I must say the old school boats are my favourites. The Big Barker and Miner are good, but wheelhouse forward are the true freighters to me.
Thank you
This is an excellent documentary on Wind Farm Assembly. However, throughout the narration, unless I missed it, there was no mention of on site medical support. Are there doctors, nurses and other medical support close by in case of need?
20:19 sadly we don't have swimming pool, but we do have a sea
Amazing! What a work !
Amazing projects- thanks for sharing,best wishes!👌👌🏾👌
Thank you!!
That Captain should have his own channel. Maybe called" the understated professional"..
Spectacular! Thanks for posting this video 💯
Grazie=Thank you and congratulations, Paul
I love ships like these. Formidable, sleek, powerful, and of course no woman's figure is complete without a generous rack
...of turbineblades below deck.
Very beautiful! Thanks for the high-quality content!
i helped pay to start wind farm in Texas 1990s - Now its Huge - me Happy
But those were not offshore. And all the big players started in Denmark in the 70s.
Amazing ❤❤
quality documentary
Bring your Boat to Ireland and build some mobile wind turbines like I suggested quite some time ago. Great stuff
That seems like a dream job
great video very interesting to watch and learn of the windfarms construction
What an interesting documentary. Thank you for showing everyone this
So good to see the video
I see these on trains a lot in the US and always wondered how they were assembled
Stunning!
This will be amazing
great documentary
Powerful things happen when great people who want to change the world .
شكرا عادل وافدي المهندس المغربي tanks adil wafdi morroco engineer merci adil wafdi ingénieur Marocain
In the U.S. my R&R after three weeks of fieldwork was the privilege of working three normal week of forty hours with dry sox.
Amazing 👍👍👍👌👏💯💯
Amazing
Frequent unprecedented weather on the way this year be grateful 🌧️
What qualification i need to work there an offshore as technicien of wind turbine and to be come crane offshore operator for installation of wind turbine
Do you have a documentary for the installation of the transition piece?
Great and interesting topic from krung Angkor city 🇰🇭+🇺🇸🇯🇵🇬🇧🇹🇭
“Your boat is all jacked up” is a good thing in this case
Thanks for sharing. The floating hotel looks nice. :)
i really appreciate german engineering, soo good
great video
Cool documentary. I would love to be on that Hotel ship, no need to go anywhere else.
*helpful infor!*
Barbaro!!!! Great Work
This is incredible. I want that job
That's a great video. I will always cheer for you in Korea I'm looking forward to a great video. Have a nice day.
Interesting Doc.
Very much enjoying your documentaries! Only suggestion is to improve the .usic choices, as they don't match the action very well.
Thank you for posting these!
amazing efficiency, i bet they are well paid for that work. we just need a few dozen more of these setups .
31:35 "wind is the adversary." The conundrum: wind makes erecting the tower difficult (must be < 12m/s or 26 mph) yet wind farms are deliberately placed in windy locations.
Extraordinary
Crane operator "That's why you would never stand underneath the load"
A few minutes later a crew of 4 men stand underneath it to bolt it down!lol
Very interesting! I like that great work for green future!
Is no one else going to talk about the massive spider that crawled out of the tower section into the base when they were getting ready to make connection lmfao
Dropping a steel tubes in to volcanic activity and shaping the bubble out and vibrations is the ability to create a relationship between the earth and knowledge of it.
great video!! super
That was awesome 👍👍👍👍
Fascinating - but - What do you mean "no mobile phone connection"? How about Starlink and Wifi calling? What year was this made?
Men are so underrated now a days. They say women are smarted than men. Ha! I'd say women are smart, but men are fricking brilliant and INCREDIBLE!
scottish operator! :) fantastic! top job lad! dream lifting!
does the "Pacific Osprey" run on diesel?
Thx.
I really liked the lava episode and is there even a little the technology of lava and magnetic resonance and field's distinctive tail of Magnetic.
Super
Dream job!
Hello how to be come the sea crane operator for installation of wind turbine an offshore ? To become the crane operator
100MW installed in 10 days. Impressive.
36MW... Its Siemens 3.6MW
@@mychan759 What does that have to do with the jack up having 10 3.6MW turbines loaded and installed in 10 days?
For a factor of charge 20-40%... when you get some wind between 20 to 90km... that'all... usuless energy...
How the foundations are made. Can you please show it in another documentary?
i worked as scaffalder at those towers
Waiting to 👀 for 3 days
Good job
Can someone explain how the structure supporting the ship out of the water is employed?
20.08 love the spider going up and across the screen
How much earn the offshore technicien of wind turbine
THANK
at 30:14 you see all the guys who install your windfarms smoking packs of cigarettes!!! lolz
So what?
ONLY UNION WOKERS CAN TOUCH IT
THATS WHAT IM TALKING ABOUT ❗️🇺🇸🇺🇸🇺🇸👍🏼. Northeast carpenters union here ❕❕❕❗️
Fantastic overview thanks ALOT
Very interesting. But why say ‘oversized’? Is it the wrong size or the right size? Do you just mean ‘large’?
oversized is used for any freight that does not fit on a standard trailer but needs to be transported anyway.
Nice!!!
Not without pollution entirely. What is the life expediency of these wind millls and what happens when these windmills are decommissioned?
One minor nitpick: diameter!= radius.... :P great video!!
Time code? In short clip no need for it but in anything longer than 5 minutes it is just polite to add time code.
Now i dont know what you are referring to.
for clarification, diameter does-not = radius. 2r = d
I didn't understand where the spider was at 20:06.