Hello Siti. Thank you for your attention. Sorry, are you still in college or already working in a cement factory? To calculate the preheater system specifications it is related to the design, and there are several designs of cyclone preheater, there are 4 cyclone levels, 5 cyclone levels and 6 cyclone levels, according to the clinker production capacity. Meanwhile, I am not in a position as a designer cement factory, but I am in a position to operate and how ton optimize the operation of a cement factory.
Hello Nurmaya, the standard efficiency of the cyclone preheater is below 10%, meaning that the less dust particles that come out of the preheater system, the better.
Material feed into the preheater system depends on the clinker production capacity. For a clinker production capacity of 8000 tonnes per day, the material fed to the preheater is around 550 tonnes per hour. And for a clinker production capacity of 11,000 tons per day, the material fed to the preheater is around 750 tons per hour.
Good information guru ji sir
Thank you for the comments, I hope this video is useful for you sir...🙏
Thanks for your efforts.
Thank you for your attention, sir, hopefully it will add a little knowledge and be useful.
Helo sir, thank you for good information. I want to ask, how to calculate suspension preheater specifications?
Hello Siti. Thank you for your attention.
Sorry, are you still in college or already working in a cement factory?
To calculate the preheater system specifications it is related to the design, and there are several designs of cyclone preheater, there are 4 cyclone levels, 5 cyclone levels and 6 cyclone levels, according to the clinker production capacity. Meanwhile, I am not in a position as a designer cement factory, but I am in a position to operate and how ton optimize the operation of a cement factory.
helo sir, thank you for good information. I want to ask, what is the standard efficiency of the suspension preheater??
Hello Nurmaya, the standard efficiency of the cyclone preheater is below 10%, meaning that the less dust particles that come out of the preheater system, the better.
Good information ji sir tq so much for giving this information
Great Videos
Thanks
May I know how large or small the meal is entering in the pre-heater system?
Material feed into the preheater system depends on the clinker production capacity.
For a clinker production capacity of 8000 tonnes per day, the material fed to the preheater is around 550 tonnes per hour.
And for a clinker production capacity of 11,000 tons per day, the material fed to the preheater is around 750 tons per hour.