Hello Honey Bunny, Well honey it looks dam Good , you all did a great job. Don’t know what the next step is possibly the doors or drilling holes in the concrete blocks and sliding a couple or three poles across or putting up doors. To me poles would look good. But you do what you think is best. Take care be safe and we love you all. ❤❤❤❤❤❤❤❤❤❤❤❤
(18:58) Yes, preparing for the north(-east) cleanout ditch for wastes (manure, etc). At least, I assume a ditch rather than a pipe...🤓 (18:58) Vâng, đang chuẩn bị mương làm sạch phía bắc(-đông) cho chất thải (phân, v.v.). Ít nhất, tôi cho rằng đó là một con mương chứ không phải là một đường ống...🤓
That bridge will never hold. It restricts the flow of water too much! Until you increase the flow, it will continue to wash out. You are wasting time and money.
So what is needed is an ALTERNATE path for the excess water. A path that causes LESS damage than has been the case. Or at least something that allows the excess to drain away much faster. Vì vậy, điều cần thiết là một con đường THAY THẾ cho lượng nước dư thừa. Một con đường gây ra ÍT thiệt hại hơn so với trước đây. Hoặc ít nhất một cái gì đó cho phép lượng dư thừa thoát ra nhanh hơn nhiều.
You are truly a very hard working mother.
Back to working on the road. Before the rains come back. 👌 🇨🇦 👍
Thanks for sharing ❤❤❤
everything clean is beautiful to see...
Hard working again 😊
I have not seen the boy riding the bycicle anymore.
Ok Hue thanks for cleaning up, after finish with pig farm, the roads, then start building a house for you and baby ok.
very very good love...
Você sempre está atenta aos detalhes, fazendo tudo com muito cuidado e capricho. Parabéns!
Hello Honey Bunny,
Well honey it looks dam Good , you all did a great job. Don’t know what the next step is possibly the doors or drilling holes in the concrete blocks and sliding a couple or three poles across or putting up doors. To me poles would look good. But you do what you think is best. Take care be safe and we love you all.
❤❤❤❤❤❤❤❤❤❤❤❤
Kolay gelsin
❤❤❤❤❤
(18:58) Yes, preparing for the north(-east) cleanout ditch for wastes (manure, etc). At least, I assume a ditch rather than a pipe...🤓
(18:58) Vâng, đang chuẩn bị mương làm sạch phía bắc(-đông) cho chất thải (phân, v.v.). Ít nhất, tôi cho rằng đó là một con mương chứ không phải là một đường ống...🤓
👍👏👏👏🧿
That bridge will never hold. It restricts the flow of water too much! Until you increase the flow, it will continue to wash out. You are wasting time and money.
So what is needed is an ALTERNATE path for the excess water. A path that causes LESS damage than has been the case. Or at least something that allows the excess to drain away much faster.
Vì vậy, điều cần thiết là một con đường THAY THẾ cho lượng nước dư thừa. Một con đường gây ra ÍT thiệt hại hơn so với trước đây. Hoặc ít nhất một cái gì đó cho phép lượng dư thừa thoát ra nhanh hơn nhiều.