- Process of the project:
1. Set up the cranes in correct place and get ready to lift with the proper equipment.
2. Lift the cooling generator in both sides using an auxiliary crane.
3. Rise the load in vertical possition and unhook the auxiliary crane.
4. Set up the load to final place.
Εquipment used to complete the work :
Liebherr LTM 1500 with Super lift
Liebherr LTM 1300
Spreader for 155.5 t
The company Stavridis Special Transport & Cranes was founded in 1995. We are active in lifting and special transport of static blocks, steel constructions, wind turbines, transformers, steam turbines, generators, gas turbines, hydroelectric dams equipment, industrial and earthmoving equipment. In addition, we escort heavy vehicles, issuance of transit permits and road surveys. Also the company undertakes logistic tasks of oversized pieces as it has 600 square meters covered and 20,000 square meters open land with a gantry crane.
Email: info@stavridis-crane.gr
Website: www.stavridis-...
Facebook: / stavridis.sp. .
Instagram: / stavridis_s. .
Production: / teo_axio
#liebherr #liebherrcranes #heavylifting #crane #cranes #albania #heavymachinery
You guys were so profesional, and it was pleasure collaborating with you. Keep going on other project😎
Thank you very much
How is there not a single safety helmet in the video?
Great job🎉
Not much margin of unused lifting capacity. A longer boom would have been needed in the US. No hard hats or gauntlet gloves?
Чи ни кран , вот РАНЬШЕ БЫЛИ КРАНЫ !
85% of crane capacity 🤯
That’s definitely not in the US
Bombastick video
Сколько весит данное чудо
135 - тонн , там написано