@@KalamazooAreaRailfan Well there are 5 bridges over both sets of tracks in East Lansing, between the lanes of 127 and 496, off ramps and two separate tracks, those 5 bridges have had the need for replacement for a long time. That will virtually eliminate falling debris, though rare, it has happened.
looks like they're finally working on that annoying interchange with I-496, 127, Trowbridge, Homer and Howard Street which can be rather confusing.
Okay…
@ even better signage will help but they’ve been crumbling for years .
@@thephantomeagle2I don’t see how that’s relevant to trains or this video but 😂
@@KalamazooAreaRailfan Well there are 5 bridges over both sets of tracks in East Lansing, between the lanes of 127 and 496, off ramps and two separate tracks, those 5 bridges have had the need for replacement for a long time. That will virtually eliminate falling debris, though rare, it has happened.