  • @shaqeelquraishi2407
    @shaqeelquraishi2407 Рік тому +2

    Thanks love you from Poland ❤

  • @intercity125
    @intercity125 Рік тому +1

    EN61243-3:2010 and onwards two-pole voltage indicators cannot use fuses for protection as it introduces a risk of false clear indication; proving should alleviate this but the standard went that way anyway.

  • @detroutspinners9933
    @detroutspinners9933 Рік тому +2

    Great video

    • @XSTrainingLtd
      @XSTrainingLtd  Рік тому

      Thanks, much appreciated 🙂

    • @detroutspinners9933
      @detroutspinners9933 Рік тому +1

      @@XSTrainingLtd likewise. Currently sitting my AM2S and if I get anywhere near passing it’ll be because of you guys and GSH/eFixx.

    • @XSTrainingLtd
      @XSTrainingLtd  Рік тому +1

      @@detroutspinners9933 You're very welcome and thanks again. All the best with your AM2S when you come to take it

    • @uplightuk8924
      @uplightuk8924 Рік тому +1

      @@detroutspinners9933 How did you get on?

    • @detroutspinners9933
      @detroutspinners9933 7 місяців тому

      @@uplightuk8924passed! Anyone watching this about to take theirs, if you pay attention to these videos you won’t go far wrong

  • @DT-ElectricalDesign
    @DT-ElectricalDesign 5 місяців тому

    Spot on explanation and procedure

    • @XSTrainingLtd
      @XSTrainingLtd  5 місяців тому

      Thank you for your comment. Please also be aware of any additional supplies, such as solar panels and battery storage.

  • @david1977m
    @david1977m 3 місяці тому

    This is the sequence I prefer and what I was taught, however I’ve seen a few sparky’s recently saying the AM2 pre documents say you have to start on L1 to L2. So if I do this procedure (which I prefer) will that be acceptable on my AM2?

    • @XSTrainingLtd
      @XSTrainingLtd  3 місяці тому

      Please ask the centre if you are ok to do safe isolation in a safe manner and start on E - N. If they state you must start on L1 to L2 then go with what they wish. To be honest, as long you cover all 10 tests it doesn’t matter which way you do it. The way I show it is just good practice.

  • @stephencunningham8850
    @stephencunningham8850 Рік тому +1

    Thats ok on primary side of DB but what if there was a cross connection from another board on the secondary side iv seen that before at the MCB

    • @XSTrainingLtd
      @XSTrainingLtd  Рік тому +1

      Great point, I shall add this to the video, as we can also get an external supply from PV sources coming in from elsewhere etc. Thank you for your comment.

  • @claytonharris5599
    @claytonharris5599 Рік тому

    why do we test at the bottom of the switch as i’ve seen the same video someone else does it at the top

    • @XSTrainingLtd
      @XSTrainingLtd  Рік тому

      Hi Clayton, thanks for your question. It all depends on where you are isolating. In this video the incoming supply to the whole board is isolated. Some videos just isolate the main switch to the board so will test the top of the main switch. Hope that helps.