SRS Demolishes Massive Cooling Tower

Поділитися
Вставка
  • Опубліковано 25 лис 2024
  • On May 24, 2010, the Savannah River Sites (SRS) massive K Cooling Tower was safely demolished as part of the Site-wide Footprint Reduction Initiative funded by the American Recovery and Reinvestment Act (ARRA).
    As the second-largest cooling tower to be demolished worldwide, the 450 foot-tall and 345 foot-wide tower posed a unique challenge to SRS project managers and commanded the attention of even the most seasoned industry veterans.

КОМЕНТАРІ •