LUAS Cross City - Liam Whelan Bridge Replacement - (5 minute edit)

Поділитися
Вставка
  • Опубліковано 18 сер 2015
  • For moe information: www.luascrosscity.ie
    As part of the new LUAS Cross City construction, works were required on the Liam Whelan Bridge located on Fassaugh Road in Cabra.
    The works involved a new deck being constructed adjacent to the existing structure on a temporary supporting structure. Once the new deck was ready, the existing deck was removed, installation of new foundations and abutments took place. Then the new deck was moved into position.
  • Наука та технологія

КОМЕНТАРІ • 1