Update on the current Holy Ghost bus Terminal in Enugu and see work in progress

Поділитися
Вставка
  • Опубліковано 25 гру 2024

КОМЕНТАРІ • 7

  • @CosmasUdeshucwu
    @CosmasUdeshucwu 7 днів тому +1

    Ogui road need alot of work

    • @ChinonsoFreddy
      @ChinonsoFreddy  7 днів тому +1

      @@CosmasUdeshucwu okay sir thank you for watching and commenting

  • @NnamdiMbah-sn4ti
    @NnamdiMbah-sn4ti 9 днів тому +1

    Governor Peter Mbah is working, only the blind will argue with me.

    • @ChinonsoFreddy
      @ChinonsoFreddy  9 днів тому

      @@NnamdiMbah-sn4ti thank for commenting stay subscribed

  • @Styve_22
    @Styve_22 11 днів тому +1

    Which road is neat.

  • @alexbanj7a7bc
    @alexbanj7a7bc 11 днів тому +1

    Holy Ghost Bus Terminal? We expect the next bus terminal in Enugu should be Ekwensu/Ogbunabali Bus Terminal.🤣

    • @ChinonsoFreddy
      @ChinonsoFreddy  9 днів тому

      @alexbanj7a7bc thank for watching and commenting