TBC Power Hour Network Adjustment Workflows and Best Practices

Поділитися
Вставка
  • Опубліковано 4 січ 2025

КОМЕНТАРІ •

  • @panaisd
    @panaisd 5 місяців тому

    Hello, i have a question about adjusting network: when i click adjust, in the report, the elevations of my points are shown as "?". That means they are not calculated. I use grid type control points, which are Northing-Easting points (fixed in 2D) and shoted benchmarks which are fixed in e (h row doesnt work because they are not local). I want to adjust my network and give elevation to my points using the e, grid-type, benchmarks. How can i fix this problem?

  • @LuisMezaEXT
    @LuisMezaEXT 6 місяців тому

    From the Adjustment Network dialog box in the Constraints tab under Fixed Coordinates, why does it not show or list the points I have in my network? The dialog box is empty, and how do I add my network points in there to be able to fix control reference points?

  • @juliocesarordonez4071
    @juliocesarordonez4071 2 роки тому

    Muchas gracias por estos videos, les felicito por el software es genial y nos facilita mucho nuestro trabajo y recorta el tiempo que normalmente hacemos..
    Con la ayuda de sus videos hacemos un trabajo aun mas profesional y con mayor calidad... Muchas gracias

  • @sintayehutamiru1931
    @sintayehutamiru1931 Рік тому

    one more question, can we apply this method without national geodetic data, just for validation of our ground control points?

  • @edclarke1457
    @edclarke1457 Рік тому

    Thank You

  • @sintayehutamiru1931
    @sintayehutamiru1931 Рік тому

    is it important to apply TBC Power Hour Network adjustment is important for African countries, like, Ethiopia.