Coomera Connector Stage 1 - January 2025 - Drone 4k Part 1

Поділитися
Вставка
  • Опубліковано 26 січ 2025

КОМЕНТАРІ • 9

  • @gandjconway30
    @gandjconway30 15 днів тому +1

    Nice work thank you!

  • @DriftLibrary
    @DriftLibrary 13 днів тому

    Wet season will slow progress for several months. Thanks for the update!

  • @frankgao6138
    @frankgao6138 16 днів тому +1

    Thanks.

  • @constantinogiriat3134
    @constantinogiriat3134 16 днів тому +1

    Great footage! Thanks for sharing.

  • @JamesMcCauley-c6j
    @JamesMcCauley-c6j 16 днів тому +3

    A lot of the site seems to flood. Same at Helensvale

    • @DriftLibrary
      @DriftLibrary 13 днів тому

      Yeah, the whole area is historically farmland and wetlands. The Beattie family used to own it all.

    • @gcdroneshots
      @gcdroneshots  13 днів тому

      @DriftLibrary wow even at Nerang?

  • @nagelixin
    @nagelixin 12 днів тому +1

    If only they would convert 2x2 lanes on the existing M1 to be express lanes, or close on/off ramps to force local traffic to use this instead.