This video covers how to take MTO of single line in a given P&ID.... If you follow the same steps and take MTO line by line.... then it will give you MTO for Entire P&ID
Pipe length will not be possible from P&ID, that's understandable, but is there is thumb rule that can made to get the length by clubbing P&ID and plotplan?
You made a p&id for some system, now you need to buy all the necessary piping material for that, so you take material off from that p&id to get it from market, and the list you will be requiring for that is MTO (material takeoff list)
good classes for detailing piping.
Thank you so much sir for the detailed video ...I had so much confusion in it
You are most welcome
Flange will be three only sir i think because after reducer line size has changed
Very helpful video thanks that
superb
Sir ! Can you upload a video of MTO of 1 whole P&ID so that we don't get confused in any of the P&ID... PLEASE sir
This video covers how to take MTO of single line in a given P&ID.... If you follow the same steps and take MTO line by line.... then it will give you MTO for Entire P&ID
Pipe length will not be possible from P&ID, that's understandable, but is there is thumb rule that can made to get the length by clubbing P&ID and plotplan?
Can we have presentation on reading P&ID?
what is the meaning of MTO in a simple language can you pl explain it??
You made a p&id for some system, now you need to buy all the necessary piping material for that, so you take material off from that p&id to get it from market, and the list you will be requiring for that is MTO (material takeoff list)