The Quantity of materials in this video was derived from the Bill of quantity of this project as prepared by a qualified Quantity Surveyor, and the document is first the client's property which is why I can use it, please don't pay much attention to the labor cost because every building expert (builder, engineer, architect, contractor etc) charges what he wishes. Please like, Learn, and Subscribe.
Please sir do you include tales kitchen accessories paint and ring lights excluding TV, Fringe, Cable,compound floor with paver,fence,gate and water system?
Which means $22,000 dollars can build a skeleton of 5-bedroom duplex which may consume another $22,000 Dollars to finish it up, while there are some people in diaspora who have over $500,000 dollars in their account but scare to start a foundation here in Nigeria due to bad siblings and relatives.
@@ossytiger4496 Get in touch if you need someone you can trust. I am UK based and I am lucky to have someone that is really God-sent. He's been doing my projects in Nigeria for some years now and I will highly recommend him any time.
No discredit to the video but this could be misleading in some way. The video is well detailed in terms of the preliminaries but I think people should begin to talk more about the actual cost of completing a house than mere skeletal structure. Since you or no one plans to move into an uncompleted house. I therefore think it is important to add a disclaimer or stress that this is merely the cost to raise the skeleton of the building ONLY. From experience, a good way to calculate the total budget of finishing a house is Grand total = amount to raise basic skeletal structure to roofing multiplied by 2 or 2.5 (depending on taste it could even go higher). In the case of this video, a good budget will be anything between 37m X (2 or 2.5) = 74m - 92.5m. It could even go higher depending on your taste and preference. Choice of roofing style and type per preference could influence price greatly e.g hidden roof requires decking work, Gerard roofing are more expensive than aluminium. Then afterwards, there's the stage for electrical piping and wiring (NB: wiring is extremely capital intensive - it is advisable to do piping only first and wiring later when close to completion and the house is safe to avoid thefts), plumbing piping, sewage tank, then we have wall plastering interior and exterior, POP or roofing ceiling installation, internal door and external door installation, tiling, wiring, overhead water tank, electrical fittings and installation, plumbing installations etc. All of these work stages that comes after raising the basic skeleton of the house are capital intensive and can never be less than the amount used to raise the building skeleton, so it is important to be aware of this and plan ahead so you aren't stuck along the way. Ire o NB: The cost in my explanation is not inclusive of other added costs for exterior beautification such as fencing and plastering, landscaping, gate etc
I stated it clearly at the Summary of the cost estimate: FOUNDATION to ROOF LEVEL (excluding the cost of roof covering). Hope you watched to the end of the video?
This is a brilliant attempt. However, Lots of the materials are excessive e.g 250 bags of cement for the deck? Way too much! and I also wonder why one keeps buying wood and planks for form work at every stage of the work, why no provision for recycling of planks/wood for form work?
Recycling wood is a good way to reduce building cost, however it depends on how they are handled on the site, the estimate simply shows the possible wood that maybe needed at the stages. Thanks for watching.
You can't just say 250 bags of cement are too much without knowing the volume of concrete and the grade specified. What he did is commendable, it's just a template to build on. As an engineer you should know your quantities and adjust appropriately
No, it's correct, it should be in the range of 200 to 300 bags of cement, when we mention 5 bedroom, note that room sizes aren't fixed. You can like your rooms to be 3m by 3.6m and I will go for 4.2m by 3.9m, these are things you'll should understand before coming to critique these informations. In all, a BOQ will give a good guide.
Personally I will triple his budget based on my style or even higher. Somehow is a good start to show our siblings so they know we aren't joking. Thanks for the information.
I would like to commend you on the exceptional work you are doing in providing valuable insights into the estimated costs of various projects. Your dedication and attention to detail are truly commendable. I would like to request if you could create a video showcasing a cost estimation for a 4-bedroom duplex. This would greatly benefit our audience and provide them with valuable information for their future projects. Thank you for your continued efforts and dedication to your work. Your contributions are truly appreciated.
This is just skeletal works, the main money starts from finishing works. Just make sure you have 70-80m naira before going into this project if you don’t want to have abandoned project.
It depends on what you want, total cost German floor stage is like 12m maybe block work will take another 5m the next decking may cost another 7m and then roofing is by choice estimate 5m, when it comes to interior, the choice is yours
" I must say, you did well. Although prices can vary based on location and the type of construction used, the prices you've mentioned in this video are quite reasonable."
@@HousinginfoNGI am hoping to build a 5 bedroom penthouse Bungalow in Port Harcourt . My engineer just sent me a proposed bill of 84milliom naira for carcass alone, material and Labour
Your doing wonderfully well for many people more especially those living abroad, a friend of mine that want to filled a house he was constructing, the guy handling the project told him that a trip of sand is 60k and he needs 21 trips, can you imagine the difference
Thank you for your in dept. analysis but I wish you could have included the diagram or Picture of the different stages you are talking about.Not many people know what you are describing
Great 👍 job brother you are very right ✅️, please 🙏 complete the video, so we can know more about covering, plastering and other please 🙏, well done 👏, more greater grace in JESUS name 🙏.And new subscriber .
Hi, I want to ask, if you want to build a house in a land that needs sand filling, is it better to sandfill the land first before starting the foundation or after digging the foundation? Thanks for your great video. Please reply
Thanks for the nice work. I believe with an optimized design, the quantities of materials will be reduced. I don't know why you guys use quite amount of concrete on the top slabs, which ordinarily carry less loads, rather add lots of loads on the foundation, thereby increasing the cost of the building.
@@HousinginfoNG Not sure what the comment you pinned on the video was .... But this depending on certain factors like Engineer Charge, Cost of Materials etc. Once again Thanks a lot for your inspiring video
Very brilliant video.But please then how much is the roof covering and the Engineering fee na. Please complete the video so we have an idea 💡 what to pay our Engineer please.Thanks for the video
it depends which land you building the house if it's on swam land you will spend more than that believe me that is why lekki property is very expensive.
Buildings in Nigeria are not expensive, it is location and the land that are usually expensive which makes the overall cost of building expensive. Imagine buying 1 plot of land for over 200 million naira, ordinary land oh just because it is in lekki phase 1. How much do you now think the overall cost of the house would be if it is to be sold? They’ll have to calculate the cost of the land into the price of the house. And we haven’t even calculated the cost of getting building approval and all other documents you will need so the government can approve your property. Plus fuel prices now is extremely high in Nigeria and you will still need to pay the construction workers and engineers that will build the house for you. All these things is why houses are getting costly in Nigeria.
Nice breakdown. Just to clarify, what's the total sqm of the building ground floor plan. Is it the 272m² you mentioned or what's it? I'd appreciate your kind response. Thanks
Why can’t you start up supervision company or construction company? A lot of people have money to build all these projects but who will you give the project? Some contractors will buy materials that is not up to standard, or some over price. It’s hard building if you are not in the country
This video is a month old. Prices are not the same obviously and he did a disclaimer at the begining. This should just be a minimum estimate. A quantity surveyor can help you with a current price if you want to build
Pls clarify what you post sir....because it depends on the size of the house ok, and the number of the cost of material...anyway u gave rough estimate....because dpc requires strong foundation not weak one
Thank you for your fantastic job well done. I will like to have idea of engineer pay rate from the beginning to end and what is he or she will bring to the table. Can you post your whatUp number.
You used 9" blocks for your first floor partitions. U used 359 bags of cement for deck casting. Your estimite is fucking high. I used 90 bags of cement for my four bedroom duplex decking with 6" as my partition blocks to increase space and reduce excess weight on the groundfloor.
Don't mind him I have my own fix bed room duplex exactly 💯 of the as this but it didn't cost me up to this amount he said here and it's now plastered and still not up to this amount. But although it depends on where you are building your own
@@maduabuchukwujesus332but you aren’t even making any sense here saying you used 9inch blocks only for the foundations and again mentioning you used 9inch block for the whole house 😂😂
The Quantity of materials in this video was derived from the Bill of quantity of this project as prepared by a qualified Quantity Surveyor, and the document is first the client's property which is why I can use it, please don't pay much attention to the labor cost because every building expert (builder, engineer, architect, contractor etc) charges what he wishes. Please like, Learn, and Subscribe.
Hi Sir, you have done well. Pls what is the estimated time to finish this kind of house? How soon pls
Please sir do you include tales kitchen accessories paint and ring lights excluding TV, Fringe, Cable,compound floor with paver,fence,gate and water system?
Good morning, please how to get your phone number
Pls, how long does it take to finish this type of building foundation???? Swift response is appreciated.
What if it is two bed rooms
Which means $22,000 dollars can build a skeleton of 5-bedroom duplex which may consume another $22,000 Dollars to finish it up, while there are some people in diaspora who have over $500,000 dollars in their account but scare to start a foundation here in Nigeria due to bad siblings and relatives.
The person should look for an engineer.
Never use family members or relatives for your construction, if you want to have a successful project within budget!
Story of my life 😂😂😂
Where can someone see a good engineer that can buy you good materials since I don’t have anyone to supervise the project.
@@ossytiger4496 Get in touch if you need someone you can trust. I am UK based and I am lucky to have someone that is really God-sent. He's been doing my projects in Nigeria for some years now and I will highly recommend him any time.
A lot of contractors won’t like you atall! You are helping us all! Aside the bad over pricing by contractors
Thanks for your comment.
No discredit to the video but this could be misleading in some way. The video is well detailed in terms of the preliminaries but I think people should begin to talk more about the actual cost of completing a house than mere skeletal structure. Since you or no one plans to move into an uncompleted house. I therefore think it is important to add a disclaimer or stress that this is merely the cost to raise the skeleton of the building ONLY.
From experience, a good way to calculate the total budget of finishing a house is
Grand total = amount to raise basic skeletal structure to roofing multiplied by 2 or 2.5 (depending on taste it could even go higher).
In the case of this video, a good budget will be anything between 37m X (2 or 2.5) = 74m - 92.5m. It could even go higher depending on your taste and preference.
Choice of roofing style and type per preference could influence price greatly e.g hidden roof requires decking work, Gerard roofing are more expensive than aluminium. Then afterwards, there's the stage for electrical piping and wiring (NB: wiring is extremely capital intensive - it is advisable to do piping only first and wiring later when close to completion and the house is safe to avoid thefts), plumbing piping, sewage tank, then we have wall plastering interior and exterior, POP or roofing ceiling installation, internal door and external door installation, tiling, wiring, overhead water tank, electrical fittings and installation, plumbing installations etc.
All of these work stages that comes after raising the basic skeleton of the house are capital intensive and can never be less than the amount used to raise the building skeleton, so it is important to be aware of this and plan ahead so you aren't stuck along the way. Ire o
NB: The cost in my explanation is not inclusive of other added costs for exterior beautification such as fencing and plastering, landscaping, gate etc
I stated it clearly at the Summary of the cost estimate: FOUNDATION to ROOF LEVEL (excluding the cost of roof covering). Hope you watched to the end of the video?
Can wẹ have your contact number please send it now
This is amazing write up... Most people like us that have no idea about what does into building a house can learn alot you experienced folks.
Thanks for the update bro but I need you to make a video on 8 bedroom duplex. God bless you
Ok, I will look into that, thanks for watching.
This is a brilliant attempt. However, Lots of the materials are excessive e.g 250 bags of cement for the deck? Way too much! and I also wonder why one keeps buying wood and planks for form work at every stage of the work, why no provision for recycling of planks/wood for form work?
Recycling wood is a good way to reduce building cost, however it depends on how they are handled on the site, the estimate simply shows the possible wood that maybe needed at the stages. Thanks for watching.
You can't just say 250 bags of cement are too much without knowing the volume of concrete and the grade specified. What he did is commendable, it's just a template to build on. As an engineer you should know your quantities and adjust appropriately
No, it's correct, it should be in the range of 200 to 300 bags of cement, when we mention 5 bedroom, note that room sizes aren't fixed. You can like your rooms to be 3m by 3.6m and I will go for 4.2m by 3.9m, these are things you'll should understand before coming to critique these informations. In all, a BOQ will give a good guide.
Thank God I found this. I have been strategically ripped off by family members handling my duplex in Nigeria.
He is 90% accurate, thanks for sharing.
Thanks for your comment, and thank you for watching.
Personally I will triple his budget based on my style or even higher. Somehow is a good start to show our siblings so they know we aren't joking. Thanks for the information.
Thanks for watching.
I would like to commend you on the exceptional work you are doing in providing valuable insights into the estimated costs of various projects. Your dedication and attention to detail are truly commendable.
I would like to request if you could create a video showcasing a cost estimation for a 4-bedroom duplex. This would greatly benefit our audience and provide them with valuable information for their future projects.
Thank you for your continued efforts and dedication to your work. Your contributions are truly appreciated.
Thank you so much for commending and appreciating my work, I will make a video on that topic soon, once again thanks for your support.
I wish you can show pics as you describe that will make you channel an A+
Thanks for the feedback, I will look into that, and thank you for watching.
This is just skeletal works, the main money starts from finishing works. Just make sure you have 70-80m naira before going into this project if you don’t want to have abandoned project.
70-80m sounds fair. In Lagos?
Exactly, cost of finishing is far more the cost of the skeletal framework.
You have said it all my beloved brethren. If you have some start, Nigerian prince of building materials are Not warranty.
It depends on what you want, total cost German floor stage is like 12m maybe block work will take another 5m the next decking may cost another 7m and then roofing is by choice estimate 5m, when it comes to interior, the choice is yours
" I must say, you did well. Although prices can vary based on location and the type of construction used, the prices you've mentioned in this video are quite reasonable."
Thank you very much for your comment, and thanks for watching.
@@HousinginfoNGI am hoping to build a 5 bedroom penthouse Bungalow in Port Harcourt . My engineer just sent me a proposed bill of 84milliom naira for carcass alone, material and Labour
Your doing wonderfully well for many people more especially those living abroad, a friend of mine that want to filled a house he was constructing, the guy handling the project told him that a trip of sand is 60k and he needs 21 trips, can you imagine the difference
Thanks, please know that location can affect the price of the trip of sand, and prices fluctuates from time to time.
@@HousinginfoNG I know but 20k different is much my brother
Brilliant video. Let me share this video First
Thanks
Thank you for your in dept. analysis but I wish you could have included the diagram or Picture of the different stages you are talking about.Not many people know what you are describing
Thanks for your feedback, I will look into it, and thank you for watching.
Thanks So Much
This Information is very Useful
You are most welcome
Great 👍 job brother you are very right ✅️, please 🙏 complete the video, so we can know more about covering, plastering and other please 🙏, well done 👏, more greater grace in JESUS name 🙏.And new subscriber .
Thank you dear for your comment, and thanks for watching my video.
Thank you so much for this simplistic analysis.
You are welcome, thanks for watching.
What's d thickness of your concrete blinding..
And your mix ratio?
Great job you did, keep the good work
Thank you very much, and thanks for watching.
Please do a video on a four bedroom flats. Thanks
Ok I will, thanks for watching.
Excluding cost of moving the materials down to the site,
Good analysis
Thank you dear
You are Great
Thanks for your comment, and thank you for watching.
Maka Ndi Oso afia. (Apriko) on materials
You did a good job. Nice one. What about some plumbing fittings before or during the decking?
Thanks for reminding me, and thank you for watching.
Hi, I want to ask, if you want to build a house in a land that needs sand filling, is it better to sandfill the land first before starting the foundation or after digging the foundation? Thanks for your great video. Please reply
Good analysis, but I think he over estimated the costing, especially with the woods which are reusable.
Thanks for the nice work. I believe with an optimized design, the quantities of materials will be reduced. I don't know why you guys use quite amount of concrete on the top slabs, which ordinarily carry less loads, rather add lots of loads on the foundation, thereby increasing the cost of the building.
Thanks for your input, and thank you for watching.
Excellent Piece of Work ... Given me a rough idea how much my engineer will charge me
Please check the comment I pinned on the video.
@@HousinginfoNG Not sure what the comment you pinned on the video was .... But this depending on certain factors like Engineer Charge, Cost of Materials etc. Once again Thanks a lot for your inspiring video
❤❤prepare like 55-60M
Decking alone fit chop 10-12M
Nice work, I did not hear anything about plumbing work estimate.
ok, thanks for reminding me, and thank you for watching.
It will be a Good idea to just go and buy house
Tankyu you much for the information my brother pls finish it till the end kk
Ok, thank you for watching.
Pls your telephone number pls
Very brilliant video.But please then how much is the roof covering and the Engineering fee na. Please complete the video so we have an idea 💡 what to pay our Engineer please.Thanks for the video
Thanks for watching, I will look into that.
Great video as always. So much knowledge displayed
Thanks for your comment. and thank you for watching.
Thank you for the insight ❤, keep up the good work
Thanks for your comment and thank you for watching.
it depends which land you building the house if it's on swam land you will spend more than that believe me that is why lekki property is very expensive.
Yes, the soil nature contributes to the total cost of building any house.
Very accurate 👌
Thanks for your comment, and thank you for watching.
Can you plz do for a 4 bedroom bungalow
Ok, I will thanks for watching.
The 5 bedrooms duplex, Thanks for the clarification. How can one contact you.?
Check channel description for my email address & whatsapp link.
Good job
Thank you, and thank you for watching.
What company or who do you contact to build these homes? (The 5 bed room duplex)
Well done for the explanation.
You are doing a wonderful job.
Thank you very much.
Nice info i just subscribed
Thanks for watching, and thank you for subscribing.
Nice job pls can we get more of this videos
Thanks, more will come
Thank you for this
You are welcomed dear
With these your video, Why are building so expensive in Nigeria?
Buildings in Nigeria are not expensive, it is location and the land that are usually expensive which makes the overall cost of building expensive.
Imagine buying 1 plot of land for over 200 million naira, ordinary land oh just because it is in lekki phase 1. How much do you now think the overall cost of the house would be if it is to be sold?
They’ll have to calculate the cost of the land into the price of the house.
And we haven’t even calculated the cost of getting building approval and all other documents you will need so the government can approve your property. Plus fuel prices now is extremely high in Nigeria and you will still need to pay the construction workers and engineers that will build the house for you. All these things is why houses are getting costly in Nigeria.
Because Nigeria s don't build wooden houses
Nice job brother
Thanks for your comment, and thank you for watching.
God job
Thanks
Thank you sir
You are very welcome.
Pls where can I get the sharp sand 50k….?
Wow, can you give a link to the BoQ
How many Square metres can 8 bedroom mansion can cost currently. And how much is estimation of 8 bedroom mansion will cost for the project
Maybe I will make a video on 8 bedroom mansion, thanks for watching.
Please what could be the price for 4 bedrooms and 1 parlour Bungalow with 3
Set of bathroom and toilet with kitchen? Thanks
I will still do a video on that - 4 bedroom bungalow.
good 0ne bro
Thank you so much
please can you analyse 4 bedrooms Duplex too?
Ok I will, thanks
Your location and contact
Will someone buy planks in every state of the decking work?
Thanks, you can chat me with the whatsapp link in the description of this channel.
Thanks, you can chat me with the whatsapp link in the description of this channel.
Please do that of 3 bedroom bungalow
Ok, thanks
How much it can cost in naira
ok, thanks
But the wood used from the ground floor won't be used in the first floor??
You can use some of them if they are still in good condition while working on the first floor, what you see in the video are estimated figures.
Nice information. Can you recommend a trusted Quantity Surveyor I can contact?
Thanks, please send me an email with the address in this channel's description or chat me with the whatsapp Link also in the channel's description.
Sorry to ask this question how can you, used 9 inches from foundation to finishing level is not possible
It is possible depending on choice
⚒️ 🔨🔨🔨🔨🔨🔨🔨🔨
Emphasis on your contacts is important.
Thanks, please you can chat me with the whatsapp link in the description of this channel.
Nice breakdown. Just to clarify, what's the total sqm of the building ground floor plan. Is it the 272m² you mentioned or what's it? I'd appreciate your kind response. Thanks
Ground floor area - 272sq mtrs
@@HousinginfoNG😂
What does it mean when you measured by feet, like width and breath? Thanks @@HousinginfoNG
What is cost of building five bedroom bungalow with pent house in Imo state
We will look at that in another video. Thanks
Thanks
you are welcome
How much will 2 store cost
Content on that is still coming, thanks for watching.
Your estimate for 12mm rods 40 lengths x 9000 is faulty, Sir. Notwithstanding, you are doing a great service.
Thanks, and thank you for watching.
It depends on where you live.
Please what is the correct price
Sharp sand and granite for 50k per load?
How many columns? How do u determine total 16mm
Those are shown in the BOQ of your house as derived from its structural drawing, and that is another benefit of the BOQ.
No mind the guy
Please what's the size of the five bedroom duplex?
I mentioned the ground floor area of the house in the video (272sqmtrs.)
Twin duplex I guess
@@HousinginfoNG Oh, that's a massive 5 bedroom duplex.
All together is how much
I summarized the costs in the video....hope you watched to the end?
You try but cost of materials dey skyrocket for Nigerian, Nigerian government nor get sense at all. How to theif dem know.
Thanks for watching.
Labour work is more issues
Are you surveyor?
N37 million is how much $?.
At the rate of the current exchange rate 37 million naira it $23,500.00
what part of nigeria are you from please i will like to no
I'm in Abia State
Can this 5 bedroom Duplex sit on a 500 or 600sqm?
It can fit into a 600sqm plot of Land. Thanks
@@HousinginfoNG You mean 500sqm can not? But 600sqm can.
👍
Thank you very much.
Why can’t you start up supervision company or construction company? A lot of people have money to build all these projects but who will you give the project? Some contractors will buy materials that is not up to standard, or some over price. It’s hard building if you are not in the country
Thanks for your suggestion, I and my team are already building houses for people.
Amadi how do I contact you?
Sir, you can chat me with the whatsapp link in the description of this channel.
Thanks
I want the bill of quantity. How do I contact you?
You can chat me with the Whatsapp link on this channel description.
10 Million is the first stage
Please where in Nigeria
The house was Built in Imo State.
But u get not a trip of sand for 50k
Ok thanks
How can i reach out to you sir
You can chat me with the whatsapp link in the description of this channel or use this whatsapp number: +2348081589911
@@HousinginfoNG alright
You are not current with your price. No 9inches block for N500
This video is a month old. Prices are not the same obviously and he did a disclaimer at the begining. This should just be a minimum estimate. A quantity surveyor can help you with a current price if you want to build
Where are you located
Abia State, thanks
Keep it up. Can you come to Abuja with your workers to build a house because your cost is very affordable compared to what they are doing here
Bro too high for just foundation
Please how can we get your contact?. Thank you
Thanks, you can chat me with the whatsapp link in the description of this channel.
Pls clarify what you post sir....because it depends on the size of the house ok, and the number of the cost of material...anyway u gave rough estimate....because dpc requires strong foundation not weak one
This my work for 11 good years,
So when giving narrative lime be very careful to explain urself well....
Hahaha, electrical is not included? Oh boy !
Thanks for the explanation on the bedrooms duplex.how can I get ur contact number.
Thanks, check the channel description.
This is not encouraging especially for the little beginner. It is very discouraging.
Thank you for your fantastic job well done. I will like to have idea of engineer pay rate from the beginning to end and what is he or she will bring to the table. Can you post your whatUp number.
Sorry I can't help you on that, that's between you and your engineer. I can only help you acquire a BOQ for your project.
@@HousinginfoNG what do you charge for BOQ?
You can chat me with the whatsapp link in the description of this channel
Where are you sir
Abia state
Are you on Facebook?
Yea
I sell roofing sheets 🙏
Good to know that, thanks
TACT YOU ?
Use the whatsapp link in the channel's description. Thanks
your cost is cheaper
He teally tried
Thanks for watching
You used 9" blocks for your first floor partitions. U used 359 bags of cement for deck casting. Your estimite is fucking high. I used 90 bags of cement for my four bedroom duplex decking with 6" as my partition blocks to increase space and reduce excess weight on the groundfloor.
Sorry please if I may ask pls 🙏 are you an engineer or you have solid idea about building 🏫 pls I need more clarification that is why I am asking
Don't mind him I have my own fix bed room duplex exactly 💯 of the as this but it didn't cost me up to this amount he said here and it's now plastered and still not up to this amount. But although it depends on where you are building your own
And I used 9inch blocks only in the foundation and used 9inch blocks for the whole house
@@maduabuchukwujesus332but you aren’t even making any sense here saying you used 9inch blocks only for the foundations and again mentioning you used 9inch block for the whole house 😂😂
@@maduabuchukwujesus332please who is your builder?